Time Lapse: Building an NCAA Final Four court

Поділитися
Вставка
  • Опубліковано 1 жов 2024
  • This time lapse video from Connor Sports shows all the work that goes into making a basketball court for the 2013 NCAA Final Four. The court is finished in Chattanooga, Tenn., then broken down and shipped to the Georgia Dome for the tournament.

КОМЕНТАРІ • 18

  • @cdjsteve
    @cdjsteve 5 місяців тому +2

    I wish they would have slowed it down and showed the layers of plywood what comes in contact with the concrete then the hardwood on top of it

  • @danielware2528
    @danielware2528 10 років тому +13

    how do they get it to the stadium?

    • @Tubewings
      @Tubewings 8 місяців тому

      They loaded the pieces into multiple trucks.

    • @sanddabz5635
      @sanddabz5635 8 місяців тому

      Carefully.

  • @mrzack888
    @mrzack888 11 років тому +5

    looks expensive

  • @BulletProofMessanger
    @BulletProofMessanger 3 місяці тому

    Can we see the materials list?

  • @Imnotyourdoormat
    @Imnotyourdoormat 4 роки тому +1

    and it only cost a gillion dollars.....

  • @sevi1668
    @sevi1668 3 роки тому

    I wanna build house court with my best friends

  • @jeorgegarrido1738
    @jeorgegarrido1738 10 місяців тому

    how much is a basketball court floor

  • @zedcus5910
    @zedcus5910 Рік тому

    how much time did it take all court, and cost plz thanks

  • @giovannitrejo3518
    @giovannitrejo3518 6 років тому

    Damn, I always wondered how basketball courts are made

  • @adikanime1418
    @adikanime1418 4 роки тому

    Sana ol

  • @Lukelr
    @Lukelr 9 років тому

    Daniel, its shipped by semi-trailer

  • @ma_deem
    @ma_deem 7 років тому +2

    Oh my this looks amazing! Like the blue very much

  • @julianonascimento1225
    @julianonascimento1225 4 роки тому

    👏👏👏👏👏

  • @NikosTheGreek18
    @NikosTheGreek18 11 років тому

    First