Scaffoldless Rail Installation Part 3 | Installation and Alignment | Wurtec

Поділитися
Вставка
  • Опубліковано 25 тра 2016
  • Wurtec’s Plumb Line Drop Tool and Rail Alignment
    Starter Kit are used to determine where the first pair of main elevator rails should be installed. The worker will position the preset Wurtec Drop Line Tool at the top of the hoist way. He will then drop two weighted Music Wires from the ends of the Drop Line Tool down the hoistway. He will then check the position of the music wire against the hoistway wall at each of the landings.
  • Навчання та стиль

КОМЕНТАРІ • 14

  • @manikantakoruprolu
    @manikantakoruprolu 6 років тому +1

    super

  • @akshaythakare6464
    @akshaythakare6464 6 років тому

    good job

  • @ImronHakam
    @ImronHakam 6 років тому +1

    whats brand ?

  • @widetechservicesalgerie1105
    @widetechservicesalgerie1105 6 років тому +1

    Safe and easy way ,but unvailable in our country , Algeria.

  • @jayrajladani7049
    @jayrajladani7049 5 років тому +2

    I want this tools of rail alingment in india how to i get them

    • @WurtecInc
      @WurtecInc  5 років тому

      Thanks for inquiring! Please send an email to sales@wurtec.com and we will help you get the products.

  • @user-rn7nr9cw8y
    @user-rn7nr9cw8y 8 років тому

    مرحبا بكم ممكن سعر

  • @classiq876
    @classiq876 5 років тому

    What about a windy pit? The plumb ball will be all over the place.

    • @danielquezada3058
      @danielquezada3058 5 років тому

      classiq876 put the weight or the plumb bob in a bucket of water

    • @pgk1940
      @pgk1940 4 роки тому +2

      I am now retired after 40 years in the elevator industry, 22 of them in installations. During that time, I hung a lot of plumb lines, and because even with small diameter plumb wires and 50 lbs. line weights, it takes very little wind to cause the lines to move, not to mention lines having a habit of being accidentially moved while being worked around, once the lines had settled into place in the pit during the initial hanging, they were then fastened on to the face of a board that was in line with the face of the rails in the pit.
      Maybe on a 2 or 3 landing install, a bucket of water might suffice to steady a line, but on a high rise, there'd be more time spent on waiting for the lines to settle than actually working on aligning the rails.

    • @chriscarr6016
      @chriscarr6016 4 роки тому

      How about hire a real elevator mechanic before someone dies

    • @claytonno2571
      @claytonno2571 5 місяців тому

      @@pgk1940 good explanation

  • @asbaslam8260
    @asbaslam8260 Рік тому

    Asb aslam

  • @billbokaro3494
    @billbokaro3494 3 роки тому

    Who entertaying this "device", don't has a little imagine about real work ,out of screen & table. Sitting on a fifth point and talking some stupid ideas.