I get for the green numbers from left to right (absolute values): 6.50, 3.00, 0.50, 3.5, 0, 0.5, 0 based on the instructions he gives. Are his numbers correct? If so, can someone pls write out one of the green number computations?
The yield numbers on the table don't match the yield numbers from the figure. Inputing the right numbers from the figure will give the correct green values. i.e. for run 1 yield is 85 not 83. and for run 8 yield is 96, not 93.
Great teacher, thank you
Hi. Great video. However, I can't get the numbers that you have. Lets say we look at the Grit column:
((83+86+83+93)/4)-((84+87+83+93)/4) = -0.5 ....
Great, thank you
Thank you Sarah for the information video. What's with Comedy label? 😂🤭
thank you so much , very informative
What would you do when you have 3 factors 3 levels and 6 runs?
How did you get those numbers in green??? are you using different yield data?? is more confusing. It was great, until I began the calculations.
pls upload factorial designs with one practical example whether it is confounding or not and anl;yze data
I get for the green numbers from left to right (absolute values): 6.50, 3.00, 0.50, 3.5, 0, 0.5, 0 based on the instructions he gives. Are his numbers correct? If so, can someone pls write out one of the green number computations?
The yield numbers on the table don't match the yield numbers from the figure. Inputing the right numbers from the figure will give the correct green values. i.e. for run 1 yield is 85 not 83. and for run 8 yield is 96, not 93.
Can you direct me to where I can find the first video you speak of involving DOE with attribute data?
Why you stopped making videos?
Is that bruce banner teaching DOE?
Your numbers are incorrect