REMODELLING THE MAIN LINES TO 4 TRACKS

Поділитися
Вставка
  • Опубліковано 7 січ 2025

КОМЕНТАРІ • 53

  • @ModelRailwayShed
    @ModelRailwayShed День тому +2

    Hello John,
    Wow, that's made a huge difference,
    Really like the idea of having removable scenery and a great tip using a mini spirt level on your track work.
    👍👍👍

    • @piccadillymodelrailways
      @piccadillymodelrailways  День тому +1

      Thank you Deano, don’t know why I didn’t think of it before now, oh well. My first two layouts had glued down tunnels, and guess where all the issues happened. So I vowed everything I did would have removable scenery. That’s why I have a quick access hatch and for more serious stuff the whole lot comes off.
      I stumbled over the spirit levels on Amazon think 6 in a pack all different types, very handy, can’t remember the price though, not a huge amount.

  • @route7railway567
    @route7railway567 День тому +1

    Hey John …. Great job.
    Four tracks up and running and looking very good indeed.
    All the best for 2025 👍
    Steve 👍👍👍

  • @iansngauge
    @iansngauge День тому +1

    Good morning John! Wow! That was a tremendous amount of work! It's certainly paid off though, as being able to run four trains simultaneously is an excellent result! Well done Sir! All the best, Ian.

    • @piccadillymodelrailways
      @piccadillymodelrailways  День тому +1

      Thanks Ian, yes very glad Ive done it, now having to deal with point stalls at the other end of the layout. We'll get there lol.

  • @colinwarrior
    @colinwarrior 2 дні тому +2

    Hi John it's just good to see four fast trains on a main line ,looking forward to seeing you tidying up a bit its going to be very good. All the best Colin from Mossend.

    • @piccadillymodelrailways
      @piccadillymodelrailways  2 дні тому

      Thank you Colin, glad you like it. The whole thing has thrown up other track issues on existing track so I’ll sort those and hopefully get the scenery sorted and replaced.

  • @petertownsend8276
    @petertownsend8276 13 годин тому +1

    Hi John. Great work, a definite improvement. I look forward to the next installment. Pete.

    • @piccadillymodelrailways
      @piccadillymodelrailways  13 годин тому

      Thanks Peter, really has made a big difference. Also highlighted track failings elsewhere, oh well, lol. Bit at a time.

  • @stephenriley9084
    @stephenriley9084 2 дні тому +1

    I thought that I'd done well cleaning my test track and the pickups on my new train! You will have so much fun with the new track arrangement. Time well spent. Regards, Stephen.

    • @piccadillymodelrailways
      @piccadillymodelrailways  2 дні тому +1

      Thank you Stephen, itll certainly be a lot of fun. Your train will certainly run so much better having clean pickups and track.

  • @exehavenharbour
    @exehavenharbour 2 дні тому +1

    Hi John, well done, great work and with a short to find too!🤯🤬. I can’t wait to to have four tracks down and four trains running, hoping to make a start this week! Cheers for now John, John

    • @piccadillymodelrailways
      @piccadillymodelrailways  2 дні тому +1

      Thanks John. It won't be long John before youve got all your lines laid. Seeing your video the other day, it looked very good. I know you said it was a test, but will look forward to your progress.

  • @davidrauger
    @davidrauger 2 дні тому +1

    I think your courage has paid dividends, John. A lot of train watching enjoyment is upon you. It's great John and well worth the effort!

  • @route7railway567
    @route7railway567 День тому +1

    Hey John …. Great job.
    Four tracks up and running and looking very good indeed. All the best for 2025
    Steve 👍👍👍

    • @piccadillymodelrailways
      @piccadillymodelrailways  День тому

      Thanks Steve, so glad I’ve done it. Now looking at track unreliabilities at the other end of the layout, lol

  • @philipstokes2824
    @philipstokes2824 2 дні тому +1

    Amazing transformation in the way you can run your layout, hopefully the clean run round the back gives you trouble free running as a bonus, an excellent start to your modelling year.

    • @piccadillymodelrailways
      @piccadillymodelrailways  2 дні тому +1

      Thanks Philip, and yes generally the new lines have been ok. The pacers do find issues so trying to sort them asap after and incident. I dont know why I didnt see this before now. Oh well. Thank you for watching and commenting.

  • @janetlewis7145
    @janetlewis7145 День тому +1

    Love the update, John. Will have to go back and see your previous video. If it's like all of the videos we have viewed in the last three years , we won't be disappointed. Happy New Year from across the pond, Bill and Janet from California.

    • @piccadillymodelrailways
      @piccadillymodelrailways  День тому

      Thanks Bill, the previous video showed what I did last year and plans for this year. The station approach is next, then Glossop. I threw out the idea of making the layout four tracks and so many people thought it was a good idea, so this time last week I set to work. Still more to do clearly, but least trains running. I’m in testing phase now, looking for issues.

  • @ngaugefouroaksstreetstatio6932
    @ngaugefouroaksstreetstatio6932 День тому +1

    Fours trains running, sounds like a great name for a band. Excellent.

  • @queenscentralmodelrailway
    @queenscentralmodelrailway 10 годин тому +1

    Great upgrade to your layout. It'll seem so much busier now with all that extra traffic !

    • @piccadillymodelrailways
      @piccadillymodelrailways  8 годин тому

      Definitely, I really do want to start using Piccadilly station so much more this year, these extra lines will certainly help with that. Thank you for taking the time to watch and comment.

  • @robertstrainset6556
    @robertstrainset6556 День тому +1

    Hi John,
    Its great you are using your time off to such good effect so well done its nice that your troublsome points over the years are now history bring on the running like in this.
    Cheers Robert.

    • @piccadillymodelrailways
      @piccadillymodelrailways  День тому +1

      Thanks Robert, gld you like it. Wierdly, the points at the station throat end are causing issues now. One at a time...

    • @robertstrainset6556
      @robertstrainset6556 День тому +1

      @@piccadillymodelrailways I am sure you will sort it all part of the fun!!!!!!

  • @linesided
    @linesided 2 дні тому +1

    4 trains! Let's go ;) Great upgrade - that's the power of youtube!

  • @aleopardstail
    @aleopardstail 2 дні тому +1

    amazed such reworking on a working layout is even possible, never mind that its attempted, very nicely done

    • @piccadillymodelrailways
      @piccadillymodelrailways  2 дні тому

      Well maybe.. I just think 'nothing ventured, nothing gained'. I am one to push the boundaries and see what can be achieved. I don't know why I did think of it before now. So glad Ive done, and seeing 4 trains running was a revelation. Thank you for watching and taking the time to comment.

  • @thegrowler-blackwoodngauge
    @thegrowler-blackwoodngauge 2 дні тому +2

    Hi John , excellent bit of track reconfiguration. Removing the points under the tunnels and hillsides will make life a whole lot easier. Great seeing 4 trains running simultaneously along the back of the layout. Very sensible to leave the scenery off for a while to check all is well with the track. Cheers Euan

    • @piccadillymodelrailways
      @piccadillymodelrailways  2 дні тому +1

      Thanks Euan, I wonder why I didnt think of it sooner. So glad Ive done it. Strangely the existing parts of the track around Piccadilly station throwing up issues. Never had so many trains through there.

  • @keithshayle7027
    @keithshayle7027 2 дні тому +2

    A great video! It really shows how you planned out the project, and carried out its execution with four trains all running round, and once again all in a relatively short space of time. Happy new year, and great video to start the new year off!

    • @piccadillymodelrailways
      @piccadillymodelrailways  2 дні тому +1

      Thanks Keith, TBH I have a rough idea how things should go, but I dont sit down and do lots of drawings etc etc, its not me Im afraid. I prefer to be hands on and alter things by seeing the items in front me. We all do things differently, and thats ok, as long as we get to where we hope to.

  • @mikeatpudhamjunction2323
    @mikeatpudhamjunction2323 23 години тому +1

    Thanks for sharing. Stay safe.

  • @moorlandmodelrailwayandy
    @moorlandmodelrailwayandy 10 годин тому +1

    Hi John happy new year to you. Exciting times, 4 tracks very good. Glad you didn't have too many issues and you can crack on. Looks great with the trains running cheers Andy

    • @piccadillymodelrailways
      @piccadillymodelrailways  8 годин тому +1

      Thanks Andy, HNY to you also my friend.
      The new section is running very well only minor issues. However, the station throat is where it’s all happening, stop, stop start stop. I’ve decided to replace all the remaining insulfrogs and make sure I use a frog juicer on every point. Why didn’t I do this sooner, lol

  • @ChazzyB-2024
    @ChazzyB-2024 2 дні тому +2

    I think I've seen the area go through three other re-orderings, but John you have done it this time, what a transformation. Putting the Picadilly back into Manchester? Not sure about that, but somehow the four tracks have really made the layout. Now you've done this it seems so obvious, but it really goes to show how years of experiment and planning have borne fruit. You will be having a great 2025 with this major rethink.

    • @piccadillymodelrailways
      @piccadillymodelrailways  2 дні тому +2

      Thank you Chazzy, you are so right, I never saw it, thought about it for years. Only in the past, but so glad I did it. I'll be ironing out potential issues for a short time yet. Strangley, as trains only went through 13/14 every now and again, that's now throwing up issues. Ive replaced a point there today too. Thank you for watching and taking the time to watch.

    • @ChazzyB-2024
      @ChazzyB-2024 2 дні тому +1

      @@piccadillymodelrailways I hate 'throwing up' but I see what you mean. Always fun to see your layout. I expect it will be representing a section of heritage railway in an Underground setting, possibly in France in a few years, or not!

    • @piccadillymodelrailways
      @piccadillymodelrailways  2 дні тому +1

      Throwing up is never good which ever way you look at it, lol. Heritage, underground or France, well... you never know!

  • @onnomulder9775
    @onnomulder9775 2 дні тому +1

    Awesome update John!!! Well rebuild! Many thanks for sharing. Cheers Onno.

  • @shornford
    @shornford 2 дні тому +1

    Should have called this Making Tracks 4! Looks good, nice track modification to make and hopefully better running as a result.

    • @piccadillymodelrailways
      @piccadillymodelrailways  2 дні тому

      Bless you, so glad you liked it. I do wish I had a 60' layout for N gauge layout, that would be huge fun. So far the running is generally better, but few minor issues, easily sorted. Strange thing is the track around Piccadily is showing issues. I replaced a point there just today. Thank you for watching.

  • @Elvenhome
    @Elvenhome 2 дні тому +1

    Really good to see four trains running John. It must have been annoying to get the short especially as it takes some finding, but thank heavens you did. I did think you were testing the modelling gods by saying so far no issues, and sure enough the Class 90 shed its train. These things must be said sotto voce, if at all and with both fingers crossed. If you do that they can't hear apparently. I did like to be reminded also of the great street scene at what would be the back of Piccadilly. It really looked good. Stephen

    • @piccadillymodelrailways
      @piccadillymodelrailways  2 дні тому

      Lol, well it was something, not sure about modelling gods. Just filmed the shot over the station, and just noticed the 90, which explains why it shunted the rest of the train causing major derailment. Lol. You can't make it up can you? Ill get the black tac out, till I can replace the couplings.
      So glad it works though, but existing track around the station throws up a few issues. Hopefully with through trains now I can improve the overall running.

  • @nick_thompson
    @nick_thompson День тому +1

    Happy new year John, love your vids but the last two have a weird colour on them, purple and green everywhere? Hopefully it’s not too much of an issue to fix for you on future ones but they are very different to your older ones.

    • @piccadillymodelrailways
      @piccadillymodelrailways  День тому

      Hi thank you for your support. Sorry you've experienced a strange colour issue. I watch my videos several times during the edit stage and couple of times before upload and again on UA-cam via the phone, ipad and sometimes the TV too and I haven't noticed any colour issues. No-one else has mentioned it. Have you watched on a different device so you can rule out your device?

    • @nick_thompson
      @nick_thompson День тому +1

      @ Iv seeen it on iPad, Apple TV and on Mac so far hence I mentioned it, peculiar, I wonder if it’s an Samsung tv / monitors thing, nothing else Iv watched on UA-cam has the same issue tho. I’m happy to send a screenshot as it does it on my iPhone too so I just grabbed one

    • @piccadillymodelrailways
      @piccadillymodelrailways  День тому +1

      Ill be honest I dont know, sorry. If you message me on my facebook messager I can send you the original file see if that's any different.