LV panel installation | LV room trench layout | MDB installation drawing

Поділитися
Вставка
  • Опубліковано 8 вер 2024
  • LV panel installation | LV room trench layout | MDB installation drawing
    Hello my youtube family, In this electrical video I explained how to install lv panel according to trench layout, and following of your query solved in this video
    1. How to install LV Panel
    2. What is trench layout drawing
    #lvpanel
    #techdxb
    #techdxbfamily
    #electricalengineer
    #trenchlayout
    #chequerplate
    Thanks for watching the video
    Follow me on Instagram for more update Link: / techdxb_taj

КОМЕНТАРІ • 68

  • @shaqeelquraishi2407
    @shaqeelquraishi2407 5 місяців тому

    Good information ❤😊

  • @aazaqureshi4767
    @aazaqureshi4767 2 роки тому +2

    Sir I m new electrical engineer in UAE ...love yur videos get alot of information from yur videos ..
    Sir show this information on LV room from transformer practically as well?

  • @MuhammadAbdullah-go5rb
    @MuhammadAbdullah-go5rb 20 днів тому

  • @vimalraj-xs2xp
    @vimalraj-xs2xp 2 роки тому

    very informative sir

  • @shafiqueahmed8627
    @shafiqueahmed8627 2 роки тому

    GOOD INFORMATION SIR, KEEP IT UP ,

  • @asifraguman5337
    @asifraguman5337 Рік тому

    Your no 1 electrical engineer sir

    • @EngineerTaj
      @EngineerTaj  Рік тому

      Thanks

    • @asifraguman5337
      @asifraguman5337 Рік тому

      @@EngineerTaj Sir, Whats difference between 100mA and 30MA elcb , We can use 100MA for power circuits ??

  • @elumengineeringprivatelimi3019

    Mashallah ❤

  • @loveleen2567
    @loveleen2567 2 роки тому

    Thank you Sir..
    V helpful

  • @hazratshahshahnawazkhan563
    @hazratshahshahnawazkhan563 Рік тому

    Good engineer 👍

  • @Imtiyaz5power
    @Imtiyaz5power 2 роки тому +1

    Thanks ❤️💐

  • @advik9347
    @advik9347 2 роки тому

    Sir ap drawing ke liye kon sa software use kre ho?
    autocad electrical use krte ho kya ap

  • @azizashaheen1337
    @azizashaheen1337 2 роки тому

    Alhamdulillah 👌

  • @abdulkhadeer2351
    @abdulkhadeer2351 2 роки тому

    Thank u sir.

  • @kv848
    @kv848 9 місяців тому

    Hi sir, when would we get this trench layout from switch gear company ?
    Because before casting of ground floor we need this .
    But, DEWA approval of load schedule would take time and after dewa approval actually switchgear company submit material submittal, and in this material submittal trench layout is present .Before that casting would be done in building .

  • @khanshabahuddin2513
    @khanshabahuddin2513 6 місяців тому

    Sir ji splitter panel kya hota hai ek details video banayr please

  • @aftabali3874
    @aftabali3874 2 роки тому

    thank you sir

  • @PrabhatKumar-lh5sy
    @PrabhatKumar-lh5sy 2 роки тому +1

    Hi, myself prabhat

    • @EngineerTaj
      @EngineerTaj  2 роки тому

      Hi

    • @EngineerTaj
      @EngineerTaj  2 роки тому

      My email id is in my channel about section you can email me on it

  • @ahmadiftikhar9101
    @ahmadiftikhar9101 4 дні тому

    Sir, incomer outcomers ke sum ke equal nhi hoga ? How can the incomer amperes are less than outcomers amperes combined. Plz explain

    • @EngineerTaj
      @EngineerTaj  4 дні тому

      Bro, electrical design calculation is not done as you are thinking. The ampere rating is based on kW rating of the equipment only.

    • @ahmadiftikhar9101
      @ahmadiftikhar9101 4 дні тому

      @@EngineerTaj incoming amperes to lv panel = outgoing amperes from lv panel. Sir, is this equation not applicable to panel ? How and why ??

    • @EngineerTaj
      @EngineerTaj  4 дні тому +1

      @ahmadiftikhar9101 watch my other video, may be you will get the answer, the how and why cannot be explained in comment. I can make a video on it. But the concept you want to impose here it doesn’t work like that.

  • @mohammadrafik6
    @mohammadrafik6 День тому

    Sir, mdb panel me earthing kaha se lete h

  • @faizalam8755
    @faizalam8755 2 роки тому

    Sir l v room mein jo painting Hoti Hai ground mein Uske bare me video banaaiye

  • @alexsunder9122
    @alexsunder9122 2 роки тому

    Thank you

  • @amirjamal1266
    @amirjamal1266 Рік тому

    Sir kabhi electrical autocad par vedio banayiye,

  • @shahbazkhurram36
    @shahbazkhurram36 2 місяці тому

    please video on AutoCAD Electrical in series

    • @EngineerTaj
      @EngineerTaj  2 місяці тому

      I will try but not promise

  • @khanshabahuddin2513
    @khanshabahuddin2513 6 місяців тому

    Sir LV room MDB ME BMS CABLE KYU AATA H PLEASE DETAILS VIDEO BANAYE

  • @mepcotech
    @mepcotech Рік тому

    Can we make trench exactly same as per the size of LV panel or do we have to give extra trench for future maintenance ? Please explain...

    • @EngineerTaj
      @EngineerTaj  Рік тому

      No, we have to increase because big cable cannot bend in small spaces of 60cm

    • @mepcotech
      @mepcotech Рік тому

      ​@@EngineerTajEngr. Please share your number Iam in trouble & i need to discuss.

  • @electricalconcept471
    @electricalconcept471 2 роки тому

    Sir how to become dewa approved engineer. Can you please make video with all requirements involved

  • @mzh2360
    @mzh2360 7 місяців тому

    Sir can i hv dwg plz?! In pdf or in dwg format.

  • @saqibnadim855
    @saqibnadim855 Рік тому

    Salam sir mv room ki bare mi video banaye

    • @EngineerTaj
      @EngineerTaj  Рік тому

      Walekum salam, i will try but not promise.

  • @kv848
    @kv848 2 роки тому

    Good brother,
    Chequer plate is needed only over trench, right ?
    Here, why it's covered the whole room ?

    • @EngineerTaj
      @EngineerTaj  2 роки тому

      Yes you are right, but here as I mentioned in video, in the whole room we have trench and to cover this we need chequer plate.

    • @kv848
      @kv848 2 роки тому

      @@EngineerTaj brother,one mccb at incoming side of smdb and another mccb when this incomer reaches at mdb , right... Both of these mccb are same in all specs ? Or any difference in settings ?

    • @EngineerTaj
      @EngineerTaj  2 роки тому

      Specification can be different but ampere rating should be identical

  • @shafiqueahmed8627
    @shafiqueahmed8627 2 роки тому

    sir can you explain it
    2 x 1C, 1 phase. what does 2 means and 1C in cables?
    3/4 x 1C in 3 phase.?

    • @EngineerTaj
      @EngineerTaj  2 роки тому +1

      2x1c means two wire of one core need to be used , same 3/4 x1c means 3 or 4 wire of one core need to be used in 3 phase according to condition if neutral needed then 4 wire and if neutral not need then 3 wire of 1core

    • @shafiqueahmed8627
      @shafiqueahmed8627 2 роки тому

      @@EngineerTaj 1 x 4c what does it mean sir?

    • @EngineerTaj
      @EngineerTaj  2 роки тому

      @@shafiqueahmed8627 it means 1cable of 4core, which is used for 3 phase system (3core for RYB phase +1core for neutral)

    • @shafiqueahmed8627
      @shafiqueahmed8627 2 роки тому

      @@EngineerTaj how to select transformer for any given load. also how to select generator size.

  • @amirjamal1266
    @amirjamal1266 Рік тому

    Assalamu alaikum taz sir

  • @hanifsarwar1381
    @hanifsarwar1381 9 місяців тому

    Sir, i want to work with you.

  • @electricaldubai
    @electricaldubai 15 днів тому

    Sir ye sabka drawing upload kar dijiye pdf file

  • @PrabhatKumar-lh5sy
    @PrabhatKumar-lh5sy 2 роки тому

    Can u send me electrical drawings for switchgear panel. Lv panel, capacitor bank panel

    • @EngineerTaj
      @EngineerTaj  2 роки тому

      Ok, you can contact me on my email, which is in my channel about section

    • @PrabhatKumar-lh5sy
      @PrabhatKumar-lh5sy 2 роки тому

      @@EngineerTaj i have sent u the email requesting for electrical drawings.

    • @EngineerTaj
      @EngineerTaj  2 роки тому

      Ok , I will reply you

  • @sarfarazahmed7506
    @sarfarazahmed7506 2 роки тому

    What is Technical data sheet

    • @EngineerTaj
      @EngineerTaj  2 роки тому

      Generally for every material or equipment their is a specification and their property sheet called technical data sheet , generally it is submitted with material submittal

  • @soumya2221
    @soumya2221 3 місяці тому

    Sir can i have your no pls