@BladeArtist 205 I agree with you. Its a very nice, safe trench. I made that comment because alot of crews would throw a quick bench in there and keep it moving.
He's digging with a 48-inch bucket when they should be digging it with a 30 inch bucket he's got an 8- they're using way too much material too much bedding is cost the company money for that material although he is digging a nice Trench although he is digging a nice Trench pipe so he's using twice as much bedding and then I'm sure they put a foot of bedding over the top of the 8-inch pipe he's digging it white way too wide
Company needs to invest in shoring…. Open cutting that seems like a huge waste of potential production. Price you get per lineal metre for pipe in Ontario must be amazing hahah.
Thanks for the videos.
Looks like you make a very safe workplace for the pipe layers👍😊👍.
Even a rainy period would not cave in the trench!!
Smooth and tidy. Can watch all day long
Nice work. Wouldn't a bench be quicker here?
Nice slope man !!
Nice looking ditch man 👍🏼
Dang, can they get those houses any closer together ? Unbelievable !
IWould feel so safe down there 💪🏼
Freaking beautiful
Finally some one who digs like I do
Must of had OSHA onsite. Super shallow cut, but playing it by the book. Good work!!
@BladeArtist 205 I agree with you. Its a very nice, safe trench. I made that comment because alot of crews would throw a quick bench in there and keep it moving.
He's digging with a 48-inch bucket when they should be digging it with a 30 inch bucket he's got an 8- they're using way too much material too much bedding is cost the company money for that material although he is digging a nice Trench although he is digging a nice Trench pipe so he's using twice as much bedding and then I'm sure they put a foot of bedding over the top of the 8-inch pipe he's digging it white way too wide
He's just laying 8 inch SDR 135 pipe
@@brianwalker1386 that machine doesn't have a quick release. So changing bucket take an hour or so to change if you have the tools on hand.
We have the same machine, love that thing it has so much reach and power, nice work!
Yeah its a great machine, we love it!
Is all this digging for that pipe which is I believe 6 to 9 inch?? I mean can it not be done with smaller bucket and couple steps?
Smooth operating!
thanks!
beautiful work!
Company needs to invest in shoring…. Open cutting that seems like a huge waste of potential production. Price you get per lineal metre for pipe in Ontario must be amazing hahah.
Now I know how to slope thanks.
No problem! Thanks for watching!
Hi can you please explain your method for getting such a nice slope?
Masalalah usatm
Trench looks great but would be way faster using a trench box
my goal is to become a heavy excavator operator