This was over around 3 months. I hired contractors for the vinyl floor, new door, additional electrical plugs, window film, window grille removal, new ceiling lights. (These were done over 4 days in total) On my end I did the door frame stripping/painting, smoothing out the walls and painting. Painting was done in like... 3 days XD Most of the time I spent making the walls as flat as possible.
Dude thats fucking badass man. How long did it take? I'm assuming a fat minute given you were hiring contractors
This was over around 3 months. I hired contractors for the vinyl floor, new door, additional electrical plugs, window film, window grille removal, new ceiling lights. (These were done over 4 days in total)
On my end I did the door frame stripping/painting, smoothing out the walls and painting. Painting was done in like... 3 days XD
Most of the time I spent making the walls as flat as possible.