CAT 308D CR with Rototilt in cabelwork

Поділитися
Вставка
  • Опубліковано 16 лис 2024

КОМЕНТАРІ • 14

  • @thequattro20v
    @thequattro20v 7 років тому +2

    Nice operating, just don't like when he's putting green stuff to the asphalt base and sand to the grass.

  • @marioma2338
    @marioma2338 7 років тому +1

    Un ottimo sistema per stendere il cavo della fibra e in genere!

  • @Bealeguy1
    @Bealeguy1 4 роки тому

    So, is this considered direct bury/

  • @JohannAb
    @JohannAb 7 років тому +1

    Belle vidéo ;)

  • @EnverGUL54
    @EnverGUL54 6 років тому +1

    🇹🇷 Öperatör muhteşem 👍

  • @Naatkin
    @Naatkin 7 років тому +1

    Surprised not boring road ?

    • @bm1113
      @bm1113  7 років тому +1

      under the bigger roads they use a GRUNDOMAT boring ;)

    • @briangardiner1015
      @briangardiner1015 6 років тому +1

      With that many rocks I don't know if boring would have worked.

  • @yammyharrone
    @yammyharrone 7 років тому +1

    If you tried pulling that blade through in Uk ground you'd pull through half a dozen old and live services in the middle of a forest, in a similar location,.. well, this practice would never be allowed

    • @Bratfalken
      @Bratfalken 7 років тому +2

      yammyharrone All cables and other thing on this dept, power and phonelines where markt prior to the fiberhose plowing. You have a power line along the road for the streetlights and that grey box with a pole is the incoming power to the houses, but those lines crossed the road and was marked by the woodsticks with red paint on top. You can also see the red markings on the asphalt fore that line.The fiberhose was drawn close to the roadsurface and the power for the streetlights was at the other side of the "ditch" No problem, everything works as you can see, this is written through that hose! :)

    • @yammyharrone
      @yammyharrone 7 років тому +1

      Jan Stromback That must be a dream to be able to work like that. No matter what is set out I never take anything for granted, and I am frequently reminded why. In England old services can date back to before current records and be constructed from a variety show of undetectable materials. It makes for very slow trenching sometimes!! 😑

    • @Bratfalken
      @Bratfalken 7 років тому +1

      yammyharrone yes, but they used metal detectors to mark the cables prior to diggin. As they made connections to the whole village, a village with some 800 inhabitants, mostly in villas, they cut the power twice, an all the time the phones still worked. Our water and wastewater tubes are way deeper in the ground, some 3 meters down to stay below the frost in the winters, so those are never in any danger.

  • @kosmo3560
    @kosmo3560 7 років тому +1

    this is Tsunami trench.

  • @levynunes5753
    @levynunes5753 7 років тому +1

    Soiso