Hello, my daily EV news comes from "Electrified" Dylan Loomis. He showed a small clip of your drone footage. It was great so i came to check out your channel and subscribe. Thank you for this amazing work, looking forward to binging all your videos tomorrow after work. Hello from Colorado
Very cool! Happy to have some exposure. I’ll reach out to thank Dylan. I’ve sent links to the Electric Viking and the erstwhile Tesla Daily but we haven’t connected yet.
Why do they believe it will take another 6 months? Interior decoration usually doesn't take that long; exterior setup and parking take the longest, don't they@@247Tesla
@@Shkodi86 It just my best estimate. They haven’t started on the glass work to enclose the 1st floor; they haven’t moved beyond the stubbed in pipes - so the entire commercial kitchen needs to be built up, inspected and approved. Water, gas, electrical, commercial kitchen, restaurant rating, etc won’t start until the construction is done. Approvals in LA can take quite a while. I hope it is quicker!
Thank you for recording!
Our pleasure!
Hello, my daily EV news comes from "Electrified" Dylan Loomis. He showed a small clip of your drone footage. It was great so i came to check out your channel and subscribe. Thank you for this amazing work, looking forward to binging all your videos tomorrow after work. Hello from Colorado
Very cool! Happy to have some exposure. I’ll reach out to thank Dylan. I’ve sent links to the Electric Viking and the erstwhile Tesla Daily but we haven’t connected yet.
Love the update videos
Thanks! The crew is moving fast! Big update coming soon.
Looking amazing! Almost done right ?
Thanks for the comment! The outside is getting close. I imagine they’ll have another 6 months building out the interior.
Why do they believe it will take another 6 months? Interior decoration usually doesn't take that long; exterior setup and parking take the longest, don't they@@247Tesla
@@Shkodi86 It just my best estimate. They haven’t started on the glass work to enclose the 1st floor; they haven’t moved beyond the stubbed in pipes - so the entire commercial kitchen needs to be built up, inspected and approved. Water, gas, electrical, commercial kitchen, restaurant rating, etc won’t start until the construction is done. Approvals in LA can take quite a while. I hope it is quicker!
@@Shkodi86Great question, though! Let’s watch and see.
Sem palavras isso não tem preço a humanidade agradece
Thanks! Hopefully the pictures tell the story.