Slab Casting से पहले ये Steel ज़रूर Check करले | Site Engineer Basic Knowledge | Slab Checklist
Вставка
- Опубліковано 24 жов 2021
- #civilGuruji #civilengineerstraininginstitute #Training #Institute #Civil_Engineer #Slab #Checklist #Casting #Steel
Slab Casting से पहले ये Steel ज़रूर Check करले | Site Engineer Basic Knowledge | Slab Checklist
Start Your TRAINING NOW
Join this Training and get started :- civilguruji.com/s/store/cours...
For More Details Call Now : 9111001234
About This Video ------------------------------------------------------------------------------------
In this video Er. Akash Bohar, Corporate Trainer of Civil Guruji explaining about Slab Casting से पहले ये Steel ज़रूर Check करले | Site Engineer Basic Knowledge | Slab Checklist
A Reinforced concrete slab is horizontal members made of concrete which is used to resist the flexural bending stress when it is subjected to loads. Generally, the minimum thickness of the slab is 4 inches and the maximum thickness depends upon the span and loads acts on the slab. For Normal residential Building, 5 inches thickness is generally recommended. As we know that checking of slab reinforcement is very important. It is because the wrong layout of reinforcement on site creates a great loss for the client, so the first duties of a civil engineer to read the complete drawing of beam and Slab. The followings are a checklist of a concrete slab that needs to be carried before casting. Slab Casting से पहले ये Steel ज़रूर Check करले | Site Engineer Basic Knowledge | Slab Checklist
Slab Casting से पहले ये Steel ज़रूर Check करले | Site Engineer Basic Knowledge | Slab Checklist
Check the diameter of Main Bars and Distribution along with Shorter Span as per approved drawings. Check the diameter of Main Bars and Distribution along with Longer Span as per approved drawings. pacing between Main Bar and Distribution along the Shorter span and longer span of slab as per approved drawings. Check the depth of the cover block as per structural drawings. Ensure that spacing between the cover block shall be at 1 m spacing. The depth or thickness of the slab should be checked.
A proper layout of chair Bars shall be provided for a slab.
Check the dowel bars, if provided for future extensions.
Make sure that the Main reinforcement of slab( both long span and short span) shall be passed through the beam in order to transfer loads of slab. Ensure that the reinforcement bar that is lapped should be located in a low-stress zone.
Proper lap length shall be checked for Main Bars. Check diameter and Spacing of Extra Reinforcement in Slab.
Check the dimension of the formwork of each slab panel.
The level and diagonal of each slab panel shall be checked.
Check the thickness of the slab.
Ensure the formworks shall provide all-round the slab edges, openings, etc.
Ensure the Support props of Slab should be in proper alignment and also check the plumb.
Vertical props or support of each slab panel shall be checked.
Make sure all the gaps in the formworks shall be properly sealed in order to prevent slurry leakage.
What an explanation!! Thank you
Dear sir
It is good information & valueable worthy
Pls do videos on Quality engineer
Thank you Gurooji
Wow sir U r the best Er in the world koi Aap se sikhe Explain karna❤️❤️
Thank you Mahesh 😊 keep sharing knowledge
please let me know how it's 8 Nos
Very nice thank you So much sir
THANK YOU SIR
Thank you sir guruji 🙏
Thank you vai🙏🙏
Superb explanation sir ji.....
Thankyou Sahil Solanki
Hame bahut khusi hai ki aapko hamari mehnat pasand aai , Civilguruji isi tarah civil engineers ko aage badhane ke liye mehnat karte rahega aur aap bhi knowledge dusro ko share karte rahe.
KEEP LEARNING, KEEP SHARING.
Discuss About Finishing Work And Gypsum Works
good slab crank bar length at discontinued beam edge & at continued beam including length of crank bar as top bar after entering on adjacent slab #👍👍
Thanks ☺️👍
Topics -estimation of circular over head tank from excavation to top slab please sir
Is the main bar of slab laid in shorter direction of the slab or shorter direction of building??
Great Sir ji
Sir Is There offline batches are available in bhopal currently .
Sir aap bilding me plinth level par ek video lekar aao
Sir, 1st slab ka main bar dusre me bhi as a main bar nahi dalsakte ahi kya.
Very nice information
Thank you
Thank you for explanations and as always very clear and meaningful information...
Can you plz kindly make one video on Reinforcement Bar Calculation from Foundation to next storey which shall maintain the lapping of next column...
Regards From Kathmandu, Nepal.
Shailesh Singh 🙏🙏🙏
Sailesh welcome👍 surely will make video soon on your demand.. Keep sharing
@@Civil_Guruji
Thank you for your kind reply... Actually want to join your certain courses and my priority is BBS... plz make me clear how do I make Payment as I am from Kathmandu Nepal...
Regards!🙏🙏🙏
1000/100+1=11
Total length devided by space plus one
to find No.of bars
Good
Sir offline training kab se start hoga
11 no. Of bars
No. Of bar = total length of bar/spacing +1
Sir main bar longer span par hoga to kya problem hoga plz sir bataie
Sir chhatisgarh may co-operate course kb start ho re h
Sir hmare 3-4 din m slab casting hone wali h. Aur beam bottom. Structure h. Beam 9×9 ka h. Tho isme steel bar kitna use kre. Double story h. Column size 9×14 hai total 20 column h. Kuch jagah column span 15 feet se jyada h. Unme beam m kya steel bar use kre.
Tekedar bolra h 12 mm ki 5 use krege. Kya ye G+1 k structure k hisab se shi h
Can we use cover block in false ceiling?
Crank bar k bare me janna chata hu achha se
Integrity steel Beam and column joint
Minor bridge slab and footing under water flowing small river
ZABARDAST G ♥️♥️♥️♥️♥️♥️♥️♥️♥️♥️
Thank you
Irfan Gul
Hame bohat khusi hai ki aapko hamari mehnat pasand aai , Civilguruji isi tarah civil engineers ko aage badane ke liye mehnat karte rahega aur aap bhi knowledge dusro ko share karte rahe.
KEEP LEARING, KEEP SHARING.
Offline training kb se start hogi
1000/100+1=11
Total length devided by space plus one
to find No.of bars
sir good video ❤
No. Of bars is 11 for every 1m. having 100 c/c
Bro 150
Cc 150 center to centre dia 50 over laping
Grate sir
Thank you very much for your Love and Support . I appreciate your expression of support and goodwill. Let us continue to learn and share knowledge together.
good sir
Thanks and welcome @vipinpalmaths
What about the binders spacing in extra bars ?
Check list for column n footing also
Will make in upcoming videos
Number of bars in 1 m of 100 mm spacing = 10 bars + 1 = 11 bars
+1 kyu ?
Sir form work foreman ka interview ka nalej ke bare me
10 Nos
अगर क्रैंक बार लगा रहे हैं क्या तब भी चेयर बार देना चाहिए ??
Sir cantilever ke bare me bhi video banaao
Will make soon
2700 SQF house ka slab casting ke lye kitna bars chahiye sir?
Longer and shorter span ka size pahile nikalo then kuch formula ahe bar bending schedule hai usska use karke slab me kitne bars lagenge voh calculate hota hai
Sir plz l batch for B.TECT
Sir hangars ghar 1300sq feet keep Ghar hai iske slabkeliye konsa saiz Ka bheem daalana chahiye our uskeliy kitane mm ka sariya use karanachagiye .haalkaa size hai 18feet length our 13feet width our bedroom law size hai 16feet Leigha our 13feet width hi .ye first florme hai our ground laval parking hai vaha 12puller deeya hai usame 12mm our 16mm kaa sariya use kiyahi plinth bhaim Me bi yahi sariya use kiya hai .Mara prasn hai ham kitane feet ka bhim daal saktehai our 20mmka sariya mai jaghahame daal saktehai kya. Dhanyawad sir.
11 no of bars
Any branch in Bangalore
Sir Esme bendip kaha utha hua hai
Sir slab ki steel kaise nikalte hai sir.
In 1 m = 1000 mm
So in c/c spaceing is 100 mm so 1000÷100 = 10
So I think 10 steel will be
Nos 10 number
11 no's of bar's
Ok
11 nos.
Sir how much you earn?
Number of bar 10
1000÷100=10 + 1=11bar
11
Correct
100 c/c 9 bar
10 num of bars
Hello sir
Cops lifetime ke liye ek bar or laiye sir
Please call 9111001234 our team will help you.
1m main number of bar 11
⭐⭐⭐⭐⭐
1 m me 11 nos of bar aayenge
10/12 sabse pehele kahapar giregi iam mistri
11 nos bar
Dia dia 1.62
Fit me bat Kara karo sir
1000÷100 = 10num of bars
10 bars in 1 mtr..
7
L 5
10
11 nos
11 Bars for 100 specing
11 bars
1 m pe 10 bar
11 bar
Wrong sir
Main bar uper hoti h or distribution niche hoti h
Ek baar clear kar lijiye sir
Joni ji main bar slab me niche he hoti hai aur distribution bar uske upar
Doubt clear sir
Thank you sir 👍
10+1=11
10 bar
11 bar in 1 m
7 bars
Job bataiye
11 nos. Bar
Correct Shyamjeet
11nos
Everything aside, please do wear safety shoes at site , engineers must have safety concern to himself and people surrounding them. Safety should be a habit rather than a protocol...
Sir off-line coaching kab se start hogi
11
Lawkesh correct ✅
10
11 bars
11 bar
Correct Sachin
10 bar
10
10
11
11 no bar