Good evening Klarity My name is Novelette and i am living in Landtop I love what's going on in my parish of St Thomas Wow... Keep up d good work me boss God bless u and keep u always
Agree with you Klarity, they should really lift that section, because the sea has taken away the beach, so as you say when the tide is high it will come right up in the drain.big up.
Trust me I see so much building put up from port to to lieth hall corner wow even from landtop gate 2021 when I leave down there was only the bookshop no Emanuel lawn around more was tickela half way even this place below tickela wasn't there Peter tyre shop there from day one loving the development of my parish investors will come along 👍
I love the work that you are doing in bringing us this content and i also like the engineering aspect that the Chinese are bringing to the table however I don't understand why they are using plastic culverts instead of concrete. Can you or someone who is much smarter than I am explain the rationale behind this?
Culverts are too low the sea will come back right through it and flood the road. The road should have been raised first then before paving put in the pipes simlar to how they do one side at a time. and that wall is not solid enough for the ocean. it needs a steel based concrete wall not stone.
Let me remind you the subscribers and viewers, the Chinese are road CONTRACTORS, they did not design the road IMPROVEMENT it was designed by the N.W.A , and the plan given to the CHINESE CONTRACTORS , So the are working off the plan , just a reminder, The original plan was DISMANTLED
@@alvirasamuels4942 correction please sir not the North Coast , they take the money to do a modified version of the Mineral Heights to Toll Gate Toll Road , they ( Audley Shaw ) take the road to Williams Field , so the next time you are going to hear that the road is named Audley Shaw Highway
Klarity flex boss i think the reason they put those black plastic pipes so low is for the water over the other side of the swamp to get it in and then in the sea 🌊 the wall 🧱 is to help with stand the high rise water from the road ways
What's going to prevent sea water from flowing back through the pipe? I doubt they will have a check valve or any backflow prevention mechanism on the pipe itself.
Big up to you too Klarityflex Jamaica tv, keep up that great work, your the best at it.
It's a blessing bro
It's interesting how people bash local contractors yet make excuses for CHEC when they do the exact same things.
Have to do with track record a contractor that does quality work will always get that but they should be called out on the good and bad
Good evening Klarity
My name is Novelette and i am living in Landtop
I love what's going on in my parish of St Thomas
Wow... Keep up d good work me boss
God bless u and keep u always
Thanks my sister. I will always try my best to my best. Glad to know you really like what I am doing
Can i come on land top Novelette ?
The only way to get rid of the water is to build the road higher!!At sea level the water just goes back and forth
What will happen if they build the road high while the houses are still low?
Agree with you Klarity, they should really lift that section, because the sea has taken away the beach, so as you say when the tide is high it will come right up in the drain.big up.
Trust me I see so much building put up from port to to lieth hall corner wow even from landtop gate 2021 when I leave down there was only the bookshop no Emanuel lawn around more was tickela half way even this place below tickela wasn't there Peter tyre shop there from day one loving the development of my parish investors will come along 👍
Fully watch blessings God and good Road
Upfulness
Klarity flex boss outside giving all the updates
I love the work that you are doing in bringing us this content and i also like the engineering aspect that the Chinese are bringing to the table however I don't understand why they are using plastic culverts instead of concrete. Can you or someone who is much smarter than I am explain the rationale behind this?
Hey Klarity, which company did the actual detailed engineering work for this project?
From the Eye to Eye Network
Culverts are too low the sea will come back right through it and flood the road. The road should have been raised first then before paving put in the pipes simlar to how they do one side at a time. and that wall is not solid enough for the ocean. it needs a steel based concrete wall not stone.
Why are they using plastic Culverts instead of concrete?
Let me remind you the subscribers and viewers, the Chinese are road CONTRACTORS, they did not design the road IMPROVEMENT it was designed by the N.W.A , and the plan given to the CHINESE CONTRACTORS , So the are working off the plan , just a reminder, The original plan was DISMANTLED
💯
The design of the road improvements was done by Stanley Consultant from the United States? 😊
Thanks for this info.
Okay the highway plan was discarded. Some people still believe we getting highway. Remember money was used to fix north coast.
@@alvirasamuels4942 correction please sir not the North Coast , they take the money to do a modified version of the Mineral Heights to Toll Gate Toll Road , they ( Audley Shaw ) take the road to Williams Field , so the next time you are going to hear that the road is named Audley Shaw Highway
Those little pipes not going to able to manage the waters when there is a heavy rain..
Klarity flex boss i think the reason they put those black plastic pipes so low is for the water over the other side of the swamp to get it in and then in the sea 🌊 the wall 🧱 is to help with stand the high rise water from the road ways
What's going to prevent sea water from flowing back through the pipe? I doubt they will have a check valve or any backflow prevention mechanism on the pipe itself.