CHEC Puts In Vast Amount Of Work On St Thomas Road Improvement Port Morant To Leith Hall

Поділитися
Вставка
  • Опубліковано 20 жов 2024

КОМЕНТАРІ • 30

  • @droneviewja
    @droneviewja 3 місяці тому +1

    Big up to you too Klarityflex Jamaica tv, keep up that great work, your the best at it.

  • @LeroyDunningcamp-de8rf
    @LeroyDunningcamp-de8rf 3 місяці тому +8

    It's interesting how people bash local contractors yet make excuses for CHEC when they do the exact same things.

    • @mikejohnson3601
      @mikejohnson3601 3 місяці тому +3

      Have to do with track record a contractor that does quality work will always get that but they should be called out on the good and bad

  • @kashthakid774
    @kashthakid774 3 місяці тому +4

    Good evening Klarity
    My name is Novelette and i am living in Landtop
    I love what's going on in my parish of St Thomas
    Wow... Keep up d good work me boss
    God bless u and keep u always

    • @klarityflexjamaica
      @klarityflexjamaica  3 місяці тому

      Thanks my sister. I will always try my best to my best. Glad to know you really like what I am doing

    • @errolwishart1044
      @errolwishart1044 3 місяці тому

      Can i come on land top Novelette ?

  • @michaelp1791
    @michaelp1791 3 місяці тому +3

    The only way to get rid of the water is to build the road higher!!At sea level the water just goes back and forth

    • @davidclayton2883
      @davidclayton2883 3 місяці тому +2

      What will happen if they build the road high while the houses are still low?

  • @edgargraham1849
    @edgargraham1849 3 місяці тому +1

    Agree with you Klarity, they should really lift that section, because the sea has taken away the beach, so as you say when the tide is high it will come right up in the drain.big up.

  • @damionwillis3072
    @damionwillis3072 3 місяці тому +1

    Trust me I see so much building put up from port to to lieth hall corner wow even from landtop gate 2021 when I leave down there was only the bookshop no Emanuel lawn around more was tickela half way even this place below tickela wasn't there Peter tyre shop there from day one loving the development of my parish investors will come along 👍

  • @Douglasfamilylifestyle
    @Douglasfamilylifestyle 3 місяці тому +1

    Fully watch blessings God and good Road

  • @damionwillis3072
    @damionwillis3072 3 місяці тому +1

    Klarity flex boss outside giving all the updates

  • @GreggandRex
    @GreggandRex 3 місяці тому +2

    I love the work that you are doing in bringing us this content and i also like the engineering aspect that the Chinese are bringing to the table however I don't understand why they are using plastic culverts instead of concrete. Can you or someone who is much smarter than I am explain the rationale behind this?

  • @ColinaSmith-rc9wu
    @ColinaSmith-rc9wu 3 місяці тому +2

    Hey Klarity, which company did the actual detailed engineering work for this project?

  • @richardmalcolm768
    @richardmalcolm768 3 місяці тому +1

    From the Eye to Eye Network

  • @JJDRProductions
    @JJDRProductions 3 місяці тому +3

    Culverts are too low the sea will come back right through it and flood the road. The road should have been raised first then before paving put in the pipes simlar to how they do one side at a time. and that wall is not solid enough for the ocean. it needs a steel based concrete wall not stone.

    • @GreggandRex
      @GreggandRex 3 місяці тому

      Why are they using plastic Culverts instead of concrete?

  • @errolwishart1044
    @errolwishart1044 3 місяці тому +3

    Let me remind you the subscribers and viewers, the Chinese are road CONTRACTORS, they did not design the road IMPROVEMENT it was designed by the N.W.A , and the plan given to the CHINESE CONTRACTORS , So the are working off the plan , just a reminder, The original plan was DISMANTLED

    • @damionwillis3072
      @damionwillis3072 3 місяці тому

      💯

    • @waynemcfarlane1233
      @waynemcfarlane1233 3 місяці тому

      The design of the road improvements was done by Stanley Consultant from the United States? 😊

    • @alvirasamuels4942
      @alvirasamuels4942 3 місяці тому

      Thanks for this info.

    • @alvirasamuels4942
      @alvirasamuels4942 3 місяці тому

      Okay the highway plan was discarded. Some people still believe we getting highway. Remember money was used to fix north coast.

    • @errolwishart1044
      @errolwishart1044 3 місяці тому

      @@alvirasamuels4942 correction please sir not the North Coast , they take the money to do a modified version of the Mineral Heights to Toll Gate Toll Road , they ( Audley Shaw ) take the road to Williams Field , so the next time you are going to hear that the road is named Audley Shaw Highway

  • @truthandjustice.1182
    @truthandjustice.1182 3 місяці тому +1

    Those little pipes not going to able to manage the waters when there is a heavy rain..

  • @damionwillis3072
    @damionwillis3072 3 місяці тому +1

    Klarity flex boss i think the reason they put those black plastic pipes so low is for the water over the other side of the swamp to get it in and then in the sea 🌊 the wall 🧱 is to help with stand the high rise water from the road ways

    • @ColinaSmith-rc9wu
      @ColinaSmith-rc9wu 3 місяці тому +2

      What's going to prevent sea water from flowing back through the pipe? I doubt they will have a check valve or any backflow prevention mechanism on the pipe itself.