That summer I remember cutting off finlock gutters from a scaffold tower with a petrol cutter in 40 degree heat getting showered with sweat and concrete dust
No maté only because we have not counter battend the roof . It’s got vented at the top an bottom doing it this way you have to use none breathable felt
That summer I remember cutting off finlock gutters from a scaffold tower with a petrol cutter in 40 degree heat getting showered with sweat and concrete dust
The heat can be really intense sometimes. The struggle is real lol 👍🏻
To hot man great job done
Thanks fella . It was brutal today I must say 🥵
Nice job pal
Thank you 🙏
Is that a lot to get them asbestos slates removed
Depends on the amount there taking mate . I’m not 100 % sure of the cost as it was done before we started works
Permable felt ?
No maté only because we have not counter battend the roof . It’s got vented at the top an bottom doing it this way you have to use none breathable felt