Stassfurt GSF 5 KMI demonstration

Поділитися
Вставка
  • Опубліковано 29 сер 2024
  • A demonstration of the installation of a foundation, mast and arm by GSF GmbH and Rail Power Systems GmbH. This mast is now ready for wire pulling.
    By using the innovative GS foundation unparalled speed and efficiency can be reached in the construction of catenary structures, as evidenced in this demonstration.
    This method will allow 20 km of catenary to be built in 10 days.

КОМЕНТАРІ • 1