This is so stupid to build a modern bridge right next to another bridge that will be torn down when you need at least 3 more birdges along that river..😂😅
About the New Berbice High Span Bridge. I believe that President Ali need to re-consider building a 4 lane bridge instead of a 3 lane. The reason being, is because we have to provide for heavy vehicle and machinery traffic from Suriname, French Guyana, & Brazil. Trade, tourism, etc will explode on the earstern side of Guyana. Berbice needs to modernize and build faster to accommodate.
I still believe that this is a mission impossible for this bridge to be completed by March 2025. There are too many OBSTACLES. Let's see. I projected it may finished by between May to June, 2025.
By looking at it no way they will finish by Mar 2025. It's better to postpone the opening date and get it done right, because when everything is dismantled and moved then it hell to get the little things fixed
@@SteveJones-qm5buGuyana lacks punctuality and people are getting sick of it, any deadline made is never abided by, that’s so disrespectful to citizens.
Finish date, and opening date is two different things, the bridge might finish in March but might open till July or September due to the fact that rigorous testing needs to be done.
Awesome ❤
Love it ❤
Origjnal dealine December 24, then March 25. I hope to proved wrong but i see a year away from now. It will be great for Guyana when finished.
4 lanes will not be enough to carry the large volume of vehicles
You have to start some where.
This is so stupid to build a modern bridge right next to another bridge that will be torn down when you need at least 3 more birdges along that river..😂😅
About the New Berbice High Span Bridge. I believe that President Ali need to re-consider building a 4 lane bridge instead of a 3 lane. The reason being, is because we have to provide for heavy vehicle and machinery traffic from Suriname, French Guyana, & Brazil. Trade, tourism, etc will explode on the earstern side of Guyana. Berbice needs to modernize and build faster to accommodate.
Agreed!!!
The new Berbice bridge is going to be a four lane. There was never any mention of it being 3 lanes
The bridge is 70 feet in width its a 4 lane .
I still believe that this is a mission impossible for this bridge to be completed by March 2025. There are too many OBSTACLES. Let's see. I projected it may finished by between May to June, 2025.
By looking at it no way they will finish by Mar 2025. It's better to postpone the opening date and get it done right, because when everything is dismantled and moved then it hell to get the little things fixed
@@cliffm8112for the two of you: the fact that a bridge is being built, whenever it is completed? Why do you worry so much?
@@SteveJones-qm5buGuyana lacks punctuality and people are getting sick of it, any deadline made is never abided by, that’s so disrespectful to citizens.
Finish date, and opening date is two different things, the bridge might finish in March but might open till July or September due to the fact that rigorous testing needs to be done.