  • There's an apartment block coming up in Ruaka that will house 55 studio apartments on 5 floors. We had a discussion with Rafael, the architect of the project, where he explains what the project is all about.
    The project will use precast panels for the walling and slab, for a significant cost saving to the client. Enjoy the August update as I try to keep you posted on a monthly basis as the project continues.
    CONTACTS
    Precast Panels Supplier, Kingdom Precast Solutions: kingdomprecast.co.ke/
    --------------------
    SUPPORT THE CHANNEL
    Mpesa: +254790165523 (Nicholas Muema)
    Buy me a coffee - ko-fi.com/propertynoma
    Paypal Donate - www.paypal.com/donate/?hosted...
    --------------------
    CONSULT WITH ME
    Email: propertynoma5@gmail.com
    Whatsapp: +254790165523
    --------------------

КОМЕНТАРІ • 138

  • @PropertyNoma
    @PropertyNoma  9 місяців тому +14

    There's an apartment block coming up in Ruaka that will house 55 studio apartments on 5 floors. We had a discussion with Rafael, the architect of the project, where he explains what the project is all about.
    The project will use precast panels for the walling and slab, for a significant cost saving to the client. Enjoy the August update as I try to keep you posted on a monthly basis as the project continues.
    CONTACTS
    Rafael Njoroge (Architect) +254 717 947272
    Precast Panels Supplier, Kingdom Precast Solutions: kingdomprecast.co.ke/

    • @soniakithinji
      @soniakithinji 9 місяців тому +1

      I have taken the architects contact will be calling him.

    • @AJ-pg8rd
      @AJ-pg8rd 9 місяців тому

      ìììì

    • @zippynjeri8984
      @zippynjeri8984 7 місяців тому

      ​@@soniakithinjitafuta mwingine if you value your peace. Juu utalilia choo na he doesn't care. Kizungu tu.

    • @zippynjeri8984
      @zippynjeri8984 7 місяців тому

      I'd suggest property noma to stop interviewing him juu anawaharibia jina..total nonsense. Uyu mtu I nimemwachia mungu.

    • @soniakithinji
      @soniakithinji 7 місяців тому

      @@zippynjeri8984 haiya for real? What happened. Coz he was to come 2 Satos ago he kept me waiting so I left

  • @njokindiba8610
    @njokindiba8610 6 місяців тому +3

    Why was Zippy Njeri asking for a refund? Is she asking Rafael? Its important that this is clarified

  • @bartlikbartlik
    @bartlikbartlik 3 дні тому

    Nice concrete works the outcome looks good

  • @daretravel5960
    @daretravel5960 9 місяців тому +8

    Please address safety issues with the workers. The workers need Helmets and safety harness lopes just in case. We do not want anybody to get injured. They should have these safety devices whether they like it or not. We want all the workers to go home safely to their families. All the same nice job.

    • @PropertyNoma
      @PropertyNoma  9 місяців тому +4

      As a site tourist from the many sites I've gone to, I don't know why workers have an apathy towards health and safety equipment

    • @saahkarngba1254
      @saahkarngba1254 3 місяці тому +2

      The guy explaining also needs safety shoes. How can he wear open toes slippers in such a hazard area.

  • @Henan-Wishes-Machinery
    @Henan-Wishes-Machinery 9 місяців тому +4

    using precast wall panel for floor slab is indeed a good idea. In this video, the placement of I-steel beams under the precast panels as support is a key factor. In this way,the building safety factor of the entire floor slab is indeed increased.

  • @swalehkhamis508
    @swalehkhamis508 9 місяців тому +3

    I like this clear job. Kenya tuko na mafundi wa kweli. Thanks bro.

  • @bartlikbartlik
    @bartlikbartlik 3 дні тому

    Exactly safety to workers is compromised

  • @bartlikbartlik
    @bartlikbartlik 3 дні тому

    Bwana architect the purpose of soak pit is to drain the septic tank, how do you put a soak pit inside the building since the water in the soak pit percolates in the soil this might weaken the soil stability hence the stability of the building.

  • @TheKenya63
    @TheKenya63 9 місяців тому +8

    Hello Nick, Architect Raphael has mentioned a few projects that he has done using the precast technology. One in particular was the 90 studio apartments. Would you kindly post the finished project? As
    a future client, this would be highly appreciated.

  • @themotivatortv
    @themotivatortv 9 місяців тому +5

    I just don't know why I love your products so much. Help me import this to Ghana for my project please

    • @PropertyNoma
      @PropertyNoma  9 місяців тому

      The logistics would be a nightmare transporting to Ghana. Investing in a precast panels factory in Ghana is the best idea in my opinion

    • @ka3011
      @ka3011 9 місяців тому

      Im a Ghanian watching this too, im trying to learn different options for my future house. I have seen some beam and blocks producers in Ghana. They might do this too

  • @themotivatortv
    @themotivatortv 9 місяців тому +2

    Very neat job

  • @georgeochieng6625
    @georgeochieng6625 5 місяців тому

    I love it guys ❤❤❤

  • @chekek
    @chekek 9 місяців тому +4

    very interesting! Would love to see more of Arch Rafael’s projects

  • @zippynjeri8984
    @zippynjeri8984 7 місяців тому +2

    I want to shout to the whole world vile uyu mtu ametucost sleepless nights, headache and ulcers.. Nick ambia uyo mtu atiridishie pesa zetu.

    • @nyadiac4061
      @nyadiac4061 2 місяці тому

      Would you mind sharing what problems you experienced? I was thinking of contacting him.

  • @fredrickokoth1578
    @fredrickokoth1578 9 місяців тому +2

    Good work, I've been waiting this hybrid. I've finally settled to use it

  • @dannysee1
    @dannysee1 13 днів тому

    Trees for 2x4s cool.

  • @MosDw
    @MosDw 9 місяців тому

    Just what I have been dreaming about.. great one there .. will be contacting you soon

  • @nknganda
    @nknganda 7 місяців тому

    Please showcase other finished precast apartments by Arch Rafael. Thanks.

  • @peterkaniaru5490
    @peterkaniaru5490 9 місяців тому +6

    Please Nick, ask about the steel beams if they get affected by rust. With rust they basically would rot and offer stability challenges in future.

    • @PropertyNoma
      @PropertyNoma  9 місяців тому +1

      I'll ask about this in the September update

    • @peterkaniaru5490
      @peterkaniaru5490 9 місяців тому

      @@PropertyNoma I look forward to it thanks

  • @bartlikbartlik
    @bartlikbartlik 3 дні тому

    Why doesn't the contractor cast the beam to the level of the panel slab?

  • @Isabella-wd6if
    @Isabella-wd6if 9 місяців тому

    I am interested in this😊

  • @ismailally1866
    @ismailally1866 7 місяців тому

    Wow nice, good work kaka, what is the cost difference when you construct it by normal method,

  • @kyenville4001
    @kyenville4001 9 місяців тому +3

    So much inspiring for us looking to build a home very soon.

  • @judwmbiyu
    @judwmbiyu 4 місяці тому

    Wow this so creative
    We now growing to other technology

  • @edunjeri1056
    @edunjeri1056 9 місяців тому +3

    Finally subscribed, your content is very good. Let us know the progress and how much they’ll spend. Very interested 👍🏼👏🏽👏🏽

  • @bartlikbartlik
    @bartlikbartlik 3 дні тому

    The method is cost effective coz of no slab shutter and reinforcement provision to slab

  • @atoms2538
    @atoms2538 4 місяці тому

    Looking at this design, I have been debating whether there is a real saving as appearing in 7:57 compared to a precast T-beam of 150mm and a hollow core slab of 100mm or with a hollow block of 150mm. If you take it that both systems will require a suspended ceiling, especially to allow for plumbing works, this hybrid design leaves a bigger space and such it has advantages. However, where no works are constructed under the slab, the beam and block appear to give a superior finish.

  • @dansonnjubi5689
    @dansonnjubi5689 4 місяці тому

    Whow will be the undershurter finish and can us it when u have a two flour paking space

  • @bartlikbartlik
    @bartlikbartlik 3 дні тому

    How is the steel I beam protected from corrosion

  • @Mg-wd6id
    @Mg-wd6id 9 місяців тому +4

    Im here to appreciate good work of Nick and Engineer Rafael , you guys are doing amazing keep the spirit moving.
    on matter concerning the sewer system i didn't see any form of plumbing work how comes ?, the second thing is about those steel i beams may be you can give us a rough estimate how much they cost ,how much you can save compared to concrete columns for a 1 story residential unit .please lets us know in the next video .thanks

    • @PropertyNoma
      @PropertyNoma  9 місяців тому +1

      I'll try to talk about cost estimates in upcoming updates of this project

    • @MrRaffffy
      @MrRaffffy 9 місяців тому

      This will be featured on the next one

  • @dansonnjubi5689
    @dansonnjubi5689 4 місяці тому

    Aslo i requre a site visit of the ruaka house

  • @sammyjonnes3713
    @sammyjonnes3713 8 місяців тому

    Architect? are those thge right construction gears in this case site shoes?

  • @arnoldrojas008
    @arnoldrojas008 4 місяці тому

    My friend excellent project... it is any way I can contact Arch Rafael?

  • @daretravel5960
    @daretravel5960 9 місяців тому +1

    What is the cost per square meter?

  • @zippynjeri8984
    @zippynjeri8984 7 місяців тому +5

    I really wanted a house with this panels..sai i cry daily..juu uyu Architect ametufanya tulale hosi juu ya uongo na being rude..

    • @skyshooter4009
      @skyshooter4009 3 місяці тому

      Sorry to hear that. What on earth did he do wrong though? Bad construction?

    • @zippynjeri8984
      @zippynjeri8984 3 місяці тому

      ​@skyshooter4009 no construction at all. I paid but akapotea na pesa zangu na hakujenga..aliweka foundation tu na iyo aliweka vibaya. Na ata ivo nilimlipa hakulipa suppliers wake, walikuja kunidai..

    • @skyshooter4009
      @skyshooter4009 3 місяці тому

      @@zippynjeri8984 Dang! That's messed up. Sorry it happened to you. And, knowing the extremely corrupt kenyan government there are no protections in place to protect people from shady contractors! Lots of untrustworthy contractors. Going forward get supplies on your own and only pay the contractors on daily basis on the work they do on that specific day. I am currently constructing a home in kenya. I am overseas and won't be able to see what they do day-in day-out, but have family members supervising their work. Came under these videos because i went with the beam and brick roofing and wasn't familiar with it. But, apparently it was a cheaper option than the traditional roofing.

    • @zippynjeri8984
      @zippynjeri8984 3 місяці тому

      ​@skyshooter4009 now I know.

  • @felixodiala6143
    @felixodiala6143 4 місяці тому +1

    How much for entire area of 50*100?

  • @mwaranle
    @mwaranle 9 місяців тому +2

    Hi Nick, many thanks for the great work you do to show case possibilities in alternative building technologies. Will appreciate if you can ask about costs per sq meter and breakdown of costs, cost of foundation and cost of each floor. This will be useful for a landlord who wishes to construct one floor at a time.
    Thanks

    • @PropertyNoma
      @PropertyNoma  9 місяців тому

      I'll be sure to ask in the September update

  • @Londontraveller82
    @Londontraveller82 9 місяців тому +1

    I have been following u and i love your work..how can i contact u.i need to fence a 100 by 100 and i would like to know estimated cost

  • @zubutv.
    @zubutv. 9 місяців тому +2

    Hi Nick great video as usual. Would you happen to know what type of foundation they used to build this building. Did they use piles or was it raft?

    • @PropertyNoma
      @PropertyNoma  9 місяців тому +1

      I'll definitely ask in the September update, though I think it's a pad foundation

  • @markjaoko9134
    @markjaoko9134 2 місяці тому

    One precast 9 feet long is how much

  • @munyuawainaina
    @munyuawainaina Місяць тому +1

    Hi nick.what happening to the monthly updates you had promised on this project

    • @alfredkiranga1237
      @alfredkiranga1237 Місяць тому

      Looking forward to the monthly updates regarding this project

  • @lecavie4648
    @lecavie4648 9 місяців тому +2

    Nick wapii hasa in Ruaka would like to visit site nijionee
    Good job man keep up

    • @PropertyNoma
      @PropertyNoma  9 місяців тому +1

      Mucatha area on your way to Banana

  • @bartlikbartlik
    @bartlikbartlik 3 дні тому

    It's called the framed structure not skeleton

  • @vincentleshamta9553
    @vincentleshamta9553 9 місяців тому +2

    Do you treat the steel ibeams against corrosion? Coastal areas are prone to corrosion, is there a suitable alternative?

    • @PropertyNoma
      @PropertyNoma  9 місяців тому

      Concrete beams can be used instead

  • @archiwaza4457
    @archiwaza4457 8 місяців тому +1

    The lack of safety on the site gives me anxiety.

  • @christopherkiswiiikasomi4007
    @christopherkiswiiikasomi4007 2 місяці тому

    Next time remember safety first. Safety boots matters

  • @michaelmaina254
    @michaelmaina254 8 місяців тому

    Hi Nick. How good are precast in terms of sound insulation between rooms verses normal 6x9 stone wall and concrete floors?

    • @PropertyNoma
      @PropertyNoma  8 місяців тому +1

      It's fairly good as the hollow cores trap air which acts as a sound barrier

  • @JesterPhotographyKE
    @JesterPhotographyKE 9 місяців тому +1

    Can you use steel ibeams instead of the concrete columns ? ?

    • @PropertyNoma
      @PropertyNoma  9 місяців тому +2

      It's possible, but that is the decision of your structural engineer

  • @bernardmuchemi3005
    @bernardmuchemi3005 9 місяців тому +1

    I have previously asked you the following, review Kenya railway worker's precast houses, what happens when precast house joints crack and today's question, what happens when uchannels rust eg in high humidity areas.

    • @cashauto3349
      @cashauto3349 7 місяців тому

      Kenya railway workers houses are made of precast?

    • @atoms2538
      @atoms2538 4 місяці тому

      This is a real concern. The beams will require maintenance, eg rust protection, but will be difficult to access when the building is completed

  • @grichmantosh4156
    @grichmantosh4156 9 місяців тому

    Fantastic technology. What's the estimated cost after completion pls.

    • @PropertyNoma
      @PropertyNoma  9 місяців тому

      I think this will be answered as the project nears completion

  • @techpiton
    @techpiton 8 місяців тому

    So how are the I beams going to be covered from below?

    • @Peterk308
      @Peterk308 2 місяці тому

      Underneath, you mean

  • @tricksandbits9185
    @tricksandbits9185 9 місяців тому +1

    How much does a concrete pump cost and factory made concrete...

    • @PropertyNoma
      @PropertyNoma  9 місяців тому +1

      Ready mix is determined by the amount of cubic metres you need for your project. Once the volume is known, then they can give you a quote

  • @themotivatortv
    @themotivatortv 9 місяців тому +1

    How much per slab panel. My total slab floor araa is about 390 square meter and this is 6 floor including the basement floor

    • @PropertyNoma
      @PropertyNoma  9 місяців тому +1

      Kindly get in touch with Arch Rafael. Contacts in the pinned comment

    • @themotivatortv
      @themotivatortv 9 місяців тому

      @@PropertyNoma I just contacted him, waiting for response

  • @annenjigua7360
    @annenjigua7360 Місяць тому

    Trust but verify always. Buyer Beware of your hard earned 💰

  • @4037969929
    @4037969929 2 місяці тому

    Need the builders contact

  • @i.luttah7610
    @i.luttah7610 9 місяців тому

    @15:41 I just noticed two or three cracked panels.. Should that cause a structural concern on the floor and how much weight it can hold?

    • @PropertyNoma
      @PropertyNoma  9 місяців тому +1

      It's not a structural concern as the idea of using panels is to reduce the volume and cost of pouring fresh or ready mix concrete to make a slab. The steel I beams, concrete beams and columns do all the load distribution of the slab to the foundation

    • @MrRaffffy
      @MrRaffffy 9 місяців тому

      In structural engineering, we have air cracks and settlement cracks and other cracks that come up due to elements merging and earth movements more on this later

  • @wanjakimacia6156
    @wanjakimacia6156 9 місяців тому

    Please please i want to know how much the house will cost.

    • @PropertyNoma
      @PropertyNoma  9 місяців тому

      This is noted for the next update video

  • @user-nt6rt2kv2y
    @user-nt6rt2kv2y 4 місяці тому

    Huyu jamaa ni mkora watch out

    • @jackieoy2938
      @jackieoy2938 4 місяці тому

      Which guy? The architect or the UA-cam page. Please clarify we educate ourselves and avoid

    • @wasitahacoolwaters1752
      @wasitahacoolwaters1752 2 місяці тому

      @@jackieoy2938 Its @zippynjeri8984 who says u avoid the architect. She has made that claim here several times. That architect also reads the comments section. He has never come here to dispute anything. I believe that @zippynjeri8984 is telling the truth

  • @jamesmaina7414
    @jamesmaina7414 9 місяців тому

    Kindly adhere to all safety standards, use safety boots not open shoes

  • @themilkyway7844
    @themilkyway7844 4 місяці тому

    I doubt the integrity of those floors

  • @zippynjeri8984
    @zippynjeri8984 7 місяців тому

    Owning a house has become my worst nightmare juu ya this so called engineer

  • @lizgaki
    @lizgaki 9 місяців тому +1

    I would love to have a house using this panel but looking at the careless of this guy with sandals on construction site beat me.who on earth does that? I saw another one on kenya going on site with suit, try that in western world and you are fired.

  • @saahkarngba1254
    @saahkarngba1254 3 місяці тому

    Safety? Open toe slippers on a construction site? Is this how it is done in Kenya? Please advise the guy in the video to take safety very seriously. You can not protect your head and leave your toes to cut.

  • @zippynjeri8984
    @zippynjeri8984 7 місяців тому

    Ive asked him to refund my money i start over hataki..na hataki kuulizwa anything, he is so rude. I have all the documents na conversation, i want to put it out kila mtu aone..juu am tired. Tell him to refund my money i start over.

  • @Babu_bk
    @Babu_bk 9 місяців тому +10

    Love your channel. However in this site there are no helmets, no safety shoes, no yellow vests, no harnesses. This construction site has no basic PPE. The 'Architect' is wearing sandals to site! Safety is paramount in any construction site! This makes me question the integrity of the 'Architect' and by extension the integrity of the building.

    • @MrRaffffy
      @MrRaffffy 9 місяців тому

      Much noted thankyou

    • @ianchandley
      @ianchandley 5 місяців тому +1

      Don’t judge the quality of the finished product by the safety standards of the “Developed World”. Here in Jamaica we had a 5.7 earthquake 2 months ago, and only 1 building collapsed and another (built by Chinese contractors) had structural problems.
      RARELY will you go on to a construction site and see everyone kitted out as you described, but we build some pretty strong structures….

  • @adowahkwame
    @adowahkwame 8 місяців тому

    Great project! @Property Noma and @Kingdom Precast, do you have partners in Ghana? I have showed your work to some people and they are very interested in this Precast building Technology.

  • @anthonynjigua5394
    @anthonynjigua5394 Місяць тому +1

    Do NOT risk it all!!
    Buyer beware!!!.
    This Ralph guy is a very dishonest guy. BUYER BEWARE a conman refined!!!

  • @zippynjeri8984
    @zippynjeri8984 7 місяців тому

    Am hurt and in distress..

    • @GeeksGumbot
      @GeeksGumbot 6 місяців тому

      Pole...please take him to the courts

  • @zippynjeri8984
    @zippynjeri8984 7 місяців тому

    Engineer mwitu. Kama mnajipenda stay away from him..ni PR tu..
    Nilimpea job na ni uongo tu.

    • @user-nt6rt2kv2y
      @user-nt6rt2kv2y 4 місяці тому

      Ni mkora tu

    • @user-nt6rt2kv2y
      @user-nt6rt2kv2y 4 місяці тому

      Ni mkora tu

    • @user-nt6rt2kv2y
      @user-nt6rt2kv2y 4 місяці тому

      Guys watch out

    • @zippynjeri8984
      @zippynjeri8984 4 місяці тому

      ​@@user-nt6rt2kv2y pia wewe amekupiga character?

    • @jackieoy2938
      @jackieoy2938 4 місяці тому

      Sasa Zippy, what was the issue? Curious about your experience. Camping here to read your response because was considering using him.

  • @ogolarickie2971
    @ogolarickie2971 8 місяців тому

    The architect in sandals/slippers????!!! Aaahhhh.. this is wrong.!!

    • @jaynewkhwatenge9375
      @jaynewkhwatenge9375 8 місяців тому +2

      This was my first concern.... hard hat yes, but sandals...No! then the lack of safety equipment for our construction workers. God have mercy (and I'm certain they have no life or medical insurance. PREZO Ruto, kindly regulate.

    • @zippynjeri8984
      @zippynjeri8984 7 місяців тому

      Wait until you give her a job..utalala hosi. I regret to the grave. Makosa

  • @memmaina1473
    @memmaina1473 6 місяців тому

    over engineered!

  • @zippynjeri8984
    @zippynjeri8984 8 місяців тому

    I've been trying to reach you guys hampatikani

    • @PropertyNoma
      @PropertyNoma  8 місяців тому

      You can reach me here: 0790165523 or propertynoma5@gmail.com

    • @wasitahacoolwaters1752
      @wasitahacoolwaters1752 6 місяців тому

      @zippynjeri8984 It is so unfortunate that someone took your money and is now not responding. Nick sounds like he is a genuine guy and I am sure he does not want to tarnish his reputation. Have you contacted him for help?

    • @GeeksGumbot
      @GeeksGumbot 6 місяців тому +1

      Sometimes people pretend