  • Visiting the inside of Hoa Binh hydroelectric power plant - With the guide's narration.
    Hoa Binh Hydropower Plant was built in Hoa Binh province (from 1979 to 1991, Ha Son Binh province), on the Da river in the North. This is the largest hydropower plant in Vietnam and Southeast Asia from 1994 to 2012 (Breaking the record in 2012 by Son La Hydropower Plant).
    About Hoa Binh hydropower plant
    Completed in 1994, it is one of the largest hydropower plants in Southeast Asia.
    Hoa Binh Hydroelectricity was built with the help of the former Soviet Union.
    In addition to being an important industrial project of the country, contributing to electricity output equal to 1/3 of the total electricity output in the country,
    Hoa Binh Hydropower Plant is also an attractive tourist attraction not to be missed for tourists near and far when visiting Hoa Binh.
    Generator sets
    8 generator sets are located underground in the heart of a hill. Inside the tunnel are installed orange light bulbs. Very convenient for traveling and operating machinery. Not only that, the lights also help the tunnel become mysterious and romantic. Because it is closed, so when you step inside, you have a cool and pleasant feeling. When visiting this building, visitors will be introduced to the process of operating the units to generate electricity and how to put electricity into the national electricity grid. Therefore, providing more understanding capital for visitors.
    Ticket price for sightseeing at Hoa Binh hydropower plant
    According to the announcement from Hoa Binh Hydropower Plant 2023, from July 1, 2018, Hoa Binh Hydropower Company, address Tan Thinh Ward, Hoa Binh City, Hoa Binh Province will open ticket sales to enter Hoa Binh Hydropower Plant. Average to the present in 2020 is as follows.
    Adults: 50,000 VND to visit the complex of works or 20,000 VND to visit the open construction.
    Children from 6 to 14 years old: 35,000 VND to visit the complex of works or 10,000 VND to visit the open construction. Primary and Secondary Students (Free for children under 6 years old).
    Elderly people and people under the policy regime: 25,000 VND to visit the complex of works or 10,000 VND to visit the open construction.
    Car parking for less than 12 seats: ticket price is 15,000 VND.
    Car care for 12 seats or more: ticket price 20,000 VND
    Caring for motorbikes, mopeds and electric scooters: 4,000vnd ticket price.
    Caring for bicycles and electric bicycles: ticket price is 2,000 VND.
    The main parameters of the Factory:
    - Hoa Binh hydropower plant has a design of 117 m high normal water level rise;
    - Reinforced water level: 120 m;
    - Dead water level: 80m (the above parameters measure altitude above sea level);
    - Area of reservoir: 208 km2.
    - Capacity of the entire reservoir: 9.45 billion cubic meters of water;
    - Installed capacity: 1,920 MW, including 8 units;
    - Average annual electricity: 8.6 billion KWh
    - Hoa Binh hydroelectric dam has 12 discharge gates and 8 generating sets;
    - Each unit has a capacity of 240 MW;
    - Investment capital: 1,904,783,458,926 VND (150 million USD) - Exchange rate in 1994.
    Hoa Binh Hydropower Plant Construction Process:
    Hoa Binh hydropower plant was started construction on November 6, 1979 and inaugurated on December 20, 1994 (15 years of construction).
    - November 6, 1979: Clearance on the river side
    - January 12, 1983: Blocking the Da River phase 1
    - January 9, 1986: Blocking the Da River phase 2
    - December 30, 1988: Unit 1 connected to the national power grid.
    - April 4, 1994: Unit 8 connected to the national power grid.
    - December 20, 1994: After 15 years of construction, including 9 years of managing and supervising the construction of power units, Hoa Binh Hydropower Plant was inaugurated.
    During the construction process, the construction units have dug more than 20 thousand m3, filled nearly 27 thousand m3 of soil and rock; spray drilling 205,000m; installed nearly 47,000 tons of equipment and metal structures.
    It can be said that the process of building Hoa Binh hydropower project is a very difficult and arduous process. There have been more than 30,000 officials and workers; 5,000 soldiers of the engineer army, 1,000 managers, and 750 Soviet experts participated in the construction of Hoa Binh Hydropower Plant.
    Contact Info
    Email: cachhaynhat@gmail.com
    Linkedin.com/in/cachhaynhat
    Facebook.com/CachHayNhat.Official
    CachHayNhat
    #cachhaynhat
    #best_way
    #cachhaynhat.com
    #best_how to do
    #best_how to

КОМЕНТАРІ • 8

  • @BachHoangTravel
    @BachHoangTravel Рік тому

    Đến thủy điện Hòa Bình nhiều lần rồi mà chưa vào bên trong nhà máy lần nào. Bên trong rộng lớn thật

    •  Рік тому

      Bên trong rộng lắm, khách tham quan chỉ được xem 1 phần nhỏ thôi

  • @CuocSongBinhYen02
    @CuocSongBinhYen02 11 місяців тому

    bên trong nhà máy rộng thật sự, đi mỏi chân luôn. Mà Đây chỉ là nơi dành cho khách tham quan, còn những nơi khác nữa

  • @cuocsongtuoiep8119
    @cuocsongtuoiep8119 Рік тому

    Công trình thế kỷ của Việt Nam

  • @TheBestWay-VN
    @TheBestWay-VN Рік тому

    Lần đầu thấy bên trong nhà máy thuỷ điện Hoà Bình. 1 tua bin mà nặng 2100 tấn, khiếp thật

  • @QuangDuong-vc8iz
    @QuangDuong-vc8iz 9 місяців тому

    Vào bên trong xem có mất tiền mua vé ko

    •  9 місяців тому

      Bây giờ vào thủy điện Hòa Bình là mất tiền tham quan. Tham công trình bên ngoài 20.000đ. Tham quan cả bên trong nhà máy nữa là 50.000đ. Ngoài ra còn tiền hướng dẫn viên nữa. Mình cũng không nhớ là tiền hướng dẫn viên bao nhiêu, hôm bữa đi cùng đoàn khác nên 4 người đưa họ 50k.

    •  9 місяців тому

      Đi tham quan công trình bên ngoài thì mình đi ô tô hay xe máy đều được. Vào trong nhà máy thì đi bộ, gửi xe ở ngay cửa nhà máy.