If you find this video good give it a like or share it with your family and friends 😀 And if you didn't find this video good do let me know in the comments what can I do to make the videos more better Please Comment on the video not under this comment it's easy to see them that way
All expressways should connect to each other. We need a beautiful ring of expressways. Thanks for this video. Love from Kerala. I intend to drive the entire length of NH44 which is 4112KM.
@@renjanpai4256 2024 ?? Even if you mean 44, it's quite next to impossible unless all indian citizens miraculously become as civilised as japanese people who adhere to the public laws and respect them
Excellent progress, and all done without imperial loot and the sweat and blood of African slaves. unlike the US/UK/EU roads. All Bharatiyas now need to do is to learn to drive safely. Take pride in BHARAT, take GREAT pride. JAI BHARAT JAI BIHAR!
Congress only added 20,000 km of TWO Lane Highways in 55 years. Not a single 4 lane. Not a single expressway. Only extended British made highways a little bit here and there. BJP adding 50,000km of world class Expressways in 11 years. There is no comparison
Mr Nitin Gadkari ji is quite aggressive with the deadline it has been postponing since very long , gov should give clear picture on these deadlines but they are always very optimistic and aggressive with the Deadlines
Here in Kerala the road development have caused a massive positive attitude towards central government. Even in North Kerala (Muslim league dominated Area) also have people putting flex of Nitin Gadkari.
भाई पूरे देश में चल रहे या नया काम शुरू वाले कार्यो के वीडियो बनाया करो पल्ज़ न कि एक दो राज्यो के ही ।। और जो प्रोजेक्ट शुरू होने वाले हो या चल रहे हो , तो उनकी डिटेल्स पूरी दिया करो ,ये प्रोजेक्ट कहा है , और कौनसी कम्पनी बना रही हैं और हो सके तो उनके ऑफिस की लोकेशन भी बता दिया करो पल्ज़ भाई
I am really excited with Bangalore Chennai Expressay, but I am not really happy with max 8 lane expandable. It must be 8 lane to start with, and expandable to 12 lane. India should plan bullet train tracks in the center of all expressways, so that it is one time land resettlement issue. Get extra real estates like 1/4 kilomter either side.
It was planned to be 8 lanes at first but when traffic was calculated it comes less so it was downgraded to 4 lanes with room left for future expansion to 8 Lanes If it was made 8 lanes now till would have been toll double
Thank you for your Comment 🙏 I will remember it now Next time it will be has Please free feel to comment more for any advise and corrections And thank you for Watching the Video 😀🙏
Your video on these expressways was thrilling, enjoyable and informative. My comments are as below: 1) Inform the viewer about the construction material of the expressways, if it is concrete or bituminous concrete; the public generally and always wants concrete highways and expressways because of high strength and durability; 2) this suggestion has to be passed onto the highways department so that in future all expressways and highways and roads are all concrete; 3) further BRO, Border Roads Organization should always ensure that all its road and bridge constructions are made of concrete because of better durability and utility for our armed forces, who are guardian our frontiers; 4) if the cement companies collectively increase the cost of cement, then a law can be brought in Parliament that all cement companies are mandated to sell cement for roads and highways and infrastructure projects at usual, nominal and standard rates.
Mega Engineering is doing a good job, keep going Waiting for the complettion of Vijayawada Bypass & Vizag - Raiput expressways. Unfortunately Sheela Nagar - Sabbavaram status is not known till now, If it was awarded to Mega Engineering the story would have been different.
Expressways in India are mostly privately owned, where private companies are given free land by government. They build the roads with their own money and collect tolls for a very long time. Do we have believe that the cost of Mumbai Pune expressway is not yet realized? Recently Supreme court ordered the DND toll collectors not to collect tolls anymore.
Sorry sir Majority of Expressways are operated by governments Majority of highways are also operated by goverments Expressway are very expensive private players only operate those Expressways where there is huge traffic like Mumbai Pune Delhi Gurugram I don't know about Mumbai Pune Expressway contract time but it's is now upgrading with huge long tunnels and viaduct so it will be tolled again Private toll should be closed whenever there contract expires their contract can me move forward if corona like thing happened
Video has many errors. Like the map of Amritsar jamnagar expressway. Also delhi mumbai expressway will take atleast two more years to open completely. I don't know about other expressways. Most of the expressways are going to miss the deadline.
Map of Amritsar jamnagar Expressway is from the official UA-cam channel of Pm Narendra Modi and Nitin Gadkari Channel The deadline are from NHAI officials. They give deadline by 100% optimisms for example if there is some land acquisition to be acquired it will be done or if there are electrical lines they will be shifted too Bec electrical lines are of state gov and it's their responsibility to shift and if they don't shift on time and if they don't do land acquisition then the project is delayed further These official gives deadline by thinking all these work will be done on time but majority of time it didn't happened
@indiainfrastructure If you look closely even the borders of states are wrong in that map. You are posting something on your your channel. It should be your responsibility that it is correct. Amritsar jamnagar expressway is a very straight expressway with very little curves.
Expressway are more expensive then National Highways so they required high density traffic so toll collection is high That's why you see 8 lane expressway between Delhi and Mumbai and 4 lane expressway between Bengaluru and Chennai and 6-10 lane expressway between Bengaluru and Mysore There is no expressway in himachal but there is one under construction in Jammu Bec Jammu has that required traffic if the traffic density is low and expressway is constructed you will be paying twice the toll in compared to same highway National Highways are more then enough for majority of India 4 Expressway can handle more traffic then 4 lane highway but it's cost would be more then doble of same 4 lane highway it could be upto 2-5 times
Sir your paying less taxes Bec of toll roads if the toll are stops get ready for even more taxes and you won't get the high class highways plus you will get free potholes and traffic just like non toll roads Yes I understand I am with you on high taxes those needs to be decreased but toll system is the best system
Wait for few years Sir Railway budget was 29000 crore in 2013-14 It rose to just 55,000 cr by 2018-19 By 2023-24 it reached 2,46,000 crore Now that was the amazing growth from 2019 to 2024 Your goona see massive railway infrastructure now These doesn't include dedicated freight corridor With Dedicated freight Corridor railway infrastructure is increasing really really fast And for your last time sorry sir your wrong Road & Highways are life of India 70% of all the freight in india goes through road
Sorry sir it's not cheap Bec freight railway charges more then normal so they can subsidized passenger railway which is in heavy loss that's then it's damm slow freight railway have a average speed of 24 km/hr business and industry prefer road then railway Bec of this That's the reason dedicated freight corridor are created as a separate company not under railway so any politicians can't use dedicated freight corridor for subsidizing passenger railway and can provide cheap freight
Sir you are seeing more & better highway Bec they have tolls the toll is used to pay the loan Railway don't have toll that's why you see less railway as compared to highways Remove these tolls and you will see less and less highways and more bad quality highways From 55,000 cr to 2,50,000 cr railway budget growth was very very good but still that 2.5 lakh crore is less
American railway which is 100% private is the cheapest freight railway in the world They charge the cheapest for 1 ton per km even cheaper then China India and Africa
Sir due to toll tax your taxes are low and your getting high quality road + majority of the toll tax comes from Trucks And these toll roads have made our logistics cost less due to which your paying less price for products you buy And I am with you on high income taxes and high GST but toll is fairly charged and is very very good
Industries ko road aur railway chaiye hotte hain China ne 1976 main apni economy of khola par pehle road aur railway banaye tab jakke 1990 ke bad wahan industries badhi Jab road hi nahi hogga too truck Kahan se ayengen?
@indiainfrastructure ye baat poori tareeke se sahi nahi hai ki roads achhi hone se industry khadi hojayegi Desh ke paas achhi skills lebur bhi to honi chahiye is or government bilkul bhi dhyan nahi de rahi hi education system Ko acha karne pe jada dhyan dena chahiye
As always with these type of posts EVERYTHING seems amazing India is great Modi works miracles Are these videos OBJECTIVE These are my observations Some parts of the roads are poorly constructed No lanes painted-no lane control All manner of vehicles allowed -many not roadworthy-bicycles-overloaded trucks-rickshaws-horse and cart No night lights No ‘cats eyes’ Unqualified drivers No regular maintenance No adequate stops for toilet breaks-food The access roads to these highways in poor condition India can spend billions on these highways but cannot maintain roads in towns and cities
Lol you have made a similar kind of video in Jan 2024 but the same expressway was yet to operationalise. You should make a video which expressway Should have been completed by 2024 but not completed.
First of all thank you for being my subscribers and watching my videos 😀🙏 Sir I get the data frm India top news channel and they get the information from nitin gadkari and NHAI If they say this expressway is going to be completed by 2024 I will be sharing the same information you know sir there are delays in infrastructure construction in India I have noted your point of Completion of Expressway I did mention it in Amritsar bikaner jamnagar Expressway I should have mention in dwarka and Delhi Mumbai expressway which section of it were completed And don't call me godi youtuber sir it hurts 🤕🙏🥹 This channel is all about infrastructure and minimum politics If you wanna know about politics then I support good policies that's why I support Raghuram Rajan ji who did Bharat jodo yatra with Rahul Gandhi And he says Indian gov need to privatised all the gov companies So I hope you get it now I am not that youtuber I have noted your point will mention which expressways were completed in the last year for my upcoming videos
It's okay Sir except godi youtuber everything you said is okay and I have noted your Advise and will try to implement it Plus I not just only try to give information I also try to give information with good Video and music as a very enjoyable presentation
भाई पूरे देश में चल रहे या नया काम शुरू वाले कार्यो के वीडियो बनाया करो पल्ज़ न कि एक दो राज्यो के ही ।। और जो प्रोजेक्ट शुरू होने वाले हो या चल रहे हो , तो उनकी डिटेल्स पूरी दिया करो ,ये प्रोजेक्ट कहा है , और कौनसी कम्पनी बना रही हैं और हो सके तो उनके ऑफिस की लोकेशन भी बता दिया करो पल्ज़ भाई
If you find this video good give it a like or share it with your family and friends 😀
And if you didn't find this video good do let me know in the comments what can I do to make the videos more better
Please Comment on the video not under this comment it's easy to see them that way
Impressive, Phenomenal, Unprecedented.... govt deserves full appreciation.
YES
I remember 10 years ago it seemed like there were more vehicles than roads and now it's the opposite 😂😂😂
All expressways should connect to each other. We need a beautiful ring of expressways. Thanks for this video. Love from Kerala. I intend to drive the entire length of NH44 which is 4112KM.
Thank you for your comment😊🤗
India needs atleast 50k km expressways before 2040.
Expressway is of no use without fdi and supportting msme and reasearch and local promotion of business this is to be top 1 priority 😅
Bhai bohot jyada bada target rakh diya apne
If Indian people vote for congress this is impossible, absolutely bjp will done this work
Too little an aim. In fact, we have to have 100,000 kilometres of expressways at least by 2040.
If we move at this speed, we can get to this target
@@renjanpai4256 2024 ?? Even if you mean 44, it's quite next to impossible unless all indian citizens miraculously become as civilised as japanese people who adhere to the public laws and respect them
konkan expressway , surat to chennai , nagpur goa expressway
MODIJI workinging tirelessly to make BHARAT a developed nation .
🇮🇳 जय हिन्द 🇮🇳 🇮🇳 Jai HIND 🇮🇳
Nice informative video on Indian express way, thanks & ❤❤❤
Excellent progress, and all done without imperial loot and the sweat and blood of African slaves. unlike the US/UK/EU roads. All Bharatiyas now need to do is to learn to drive safely. Take pride in BHARAT, take GREAT pride. JAI BHARAT JAI BIHAR!
India also needs tunnels in some parts of expressways when there is an impact on the nature and ecosystem!!
Congress only added 20,000 km of TWO Lane Highways in 55 years. Not a single 4 lane. Not a single expressway. Only extended British made highways a little bit here and there.
BJP adding 50,000km of world class Expressways in 11 years.
There is no comparison
Great job and worth the drive looking forward to these eways will buy a bigger better suv jai hind
Your gonna love the drive on these Expressways Especially during Monsoon
Tell about surat chennai express way ❤❤❤
Open 2026
Most likely by next year
Not even land equation started yet in maharashtra part
Expressway Pradesh.... Uttar-pradesh 😊
Delhi Mumbai expressway never going to complete before 2027 many reaches in Maharashtra works going very slow and land acquisition not completed yet
Mr Nitin Gadkari ji is quite aggressive with the deadline it has been postponing since very long , gov should give clear picture on these deadlines but they are always very optimistic and aggressive with the Deadlines
Here in Kerala the road development have caused a massive positive attitude towards central government. Even in North Kerala (Muslim league dominated Area) also have people putting flex of Nitin Gadkari.
Actually Nitin Gadkari is the only respected politician from BJP in Kerala... Most non bjp allying keralites dislike Modi & Amit Shah.
भाई पूरे देश में चल रहे या नया काम शुरू वाले कार्यो के वीडियो बनाया करो पल्ज़ न कि एक दो राज्यो के ही ।।
और जो प्रोजेक्ट शुरू होने वाले हो या चल रहे हो , तो उनकी डिटेल्स पूरी दिया करो ,ये प्रोजेक्ट कहा है , और कौनसी कम्पनी बना रही हैं और हो सके तो उनके ऑफिस की लोकेशन भी बता दिया करो पल्ज़ भाई
वो अगली video मैं बताऊंगा इसमें मैने सिर्फ उन Expressway के बारे में बताया है जो इस साल खुल सकते हैं
Government needs to now go for 2nd phase of expressway development:
1. Gorakhpur-Shamli expressway
2. Gorakhpur-Silliguri Expressway
3. Pune-Bengaluru expressway
4. Bengaluru-Hyderabad Expressway
5. Odisha Eastern Coastal Expressway
6. Nagpur Hyderabad expressway
7. Delhi-Gwalior-Bhopal expressway
8. Bhopal-Kanpur Economic Corridor
9. Hyderabad-Vizag expressway
10. Narmada Expressway
India needs 1lakh km expressway before 2035
😂😂😂😂 ye jyada ho gya gadgari ji ko nind lene ka time to doge na 😹 I wish My india is Developed nation one day ❤
But jurman Shepard didn't understand. He says we really need this 😂😂
Bhai bhai ye thoda jyada ho raha hai vaha pe insaan Hai robot nahi😂😂
is there the latest update about the Amritsar - Jamnagar Expressway?
In all expressway maharashtra samruddhi expressway looks more beutifull because its looks white and surrounding greenery
Yes it looks so amazing 😍
Narmada Expressway, That should be started ASAP
India is becoming more like China, and I welcome it ❤❤❤
Mp me vindhya expressway kab tak shuru hoga
Things are actually getting done!
Why are you showing the pre-existing Bengaluru-Mysuru expressway (timestamp 1:03), for the Bengaluru-Chennai expressway?
I am really excited with Bangalore Chennai Expressay, but I am not really happy with max 8 lane expandable. It must be 8 lane to start with, and expandable to 12 lane.
India should plan bullet train tracks in the center of all expressways, so that it is one time land resettlement issue. Get extra real estates like 1/4 kilomter either side.
It was planned to be 8 lanes at first but when traffic was calculated it comes less so it was downgraded to 4 lanes with room left for future expansion to 8 Lanes
If it was made 8 lanes now till would have been toll double
any update on Indore Hyderabad expressway?
Nice video 🚗👍🏿📌
Thank you so much for your comments 😀
Another from...
mangalore to kanyakumari... NH 66..
South india..by may 2025..
Few sections could be possible. entire sections will be completed by next year..
next year only several parts are not completed mainly mallapuram and some areas
Good job of updating 🎉
Friendly advice: Pls check your grammar and spelling. For example:
India has 6000 km of highways NOT
India have 6000 km ...
Thank you for your Comment 🙏 I will remember it now
Next time it will be has
Please free feel to comment more for any advise and corrections
And thank you for Watching the Video 😀🙏
We need to connect Chandigarh (Capital of two States) to Delhi and Nepal - Kolkata via the UP and Uttarakhand terai
Delhi Chandigarh already under construction it's a highway though but still it's good
Your video on these expressways was thrilling, enjoyable and informative. My comments are as below:
1) Inform the viewer about the construction material of the expressways, if it is concrete or bituminous concrete; the public generally and always wants concrete highways and expressways because of high strength and durability;
2) this suggestion has to be passed onto the highways department so that in future all expressways and highways and roads are all concrete;
3) further BRO, Border Roads Organization should always ensure that all its road and bridge constructions are made of concrete because of better durability and utility for our armed forces, who are guardian our frontiers;
4) if the cement companies collectively increase the cost of cement, then a law can be brought in Parliament that all cement companies are mandated to sell cement for roads and highways and infrastructure projects at usual, nominal and standard rates.
Nice video.
Thank you very much🙏😀
I am interested about Surat - chennai expressway
varanasi ranchi kolkata expressway
Mega Engineering is doing a good job, keep going
Waiting for the complettion of Vijayawada Bypass & Vizag - Raiput expressways.
Unfortunately Sheela Nagar - Sabbavaram status is not known till now, If it was awarded to Mega Engineering the story would have been different.
When will Kasaragode - kollam, kerala project to be completed
next year nh66
Bangalore Vijayawada Expressway
What if they connect each other
3:51 than* 😶🌫
Most of the expressways you mentioned will open only partially.
Delhi to Mumbai
❤❤❤❤❤❤❤❤❤❤❤❤❤❤❤❤❤❤❤❤❤❤
Loot machao
What about NH 66 progress
Expressways in India are mostly privately owned, where private companies are given free land by government. They build the roads with their own money and collect tolls for a very long time. Do we have believe that the cost of Mumbai Pune expressway is not yet realized? Recently Supreme court ordered the DND toll collectors not to collect tolls anymore.
Sorry sir Majority of Expressways are operated by governments
Majority of highways are also operated by goverments
Expressway are very expensive private players only operate those Expressways where there is huge traffic like Mumbai Pune Delhi Gurugram
I don't know about Mumbai Pune Expressway contract time but it's is now upgrading with huge long tunnels and viaduct so it will be tolled again
Private toll should be closed whenever there contract expires their contract can me move forward if corona like thing happened
Video has many errors. Like the map of Amritsar jamnagar expressway. Also delhi mumbai expressway will take atleast two more years to open completely. I don't know about other expressways. Most of the expressways are going to miss the deadline.
Map of Amritsar jamnagar Expressway is from the official UA-cam channel of Pm Narendra Modi and Nitin Gadkari Channel
The deadline are from NHAI officials. They give deadline by 100% optimisms for example if there is some land acquisition to be acquired it will be done or if there are electrical lines they will be shifted too Bec electrical lines are of state gov and it's their responsibility to shift and if they don't shift on time and if they don't do land acquisition then the project is delayed further
These official gives deadline by thinking all these work will be done on time but majority of time it didn't happened
@indiainfrastructure If you look closely even the borders of states are wrong in that map. You are posting something on your your channel. It should be your responsibility that it is correct. Amritsar jamnagar expressway is a very straight expressway with very little curves.
Ok Sir Noted next Time I will make Sure to use better or the best version of the map
ALL projects except 1 ... in North &.West India...❗️
Why.... rest of Indian not paying Tax & Vote...❓️❓️😐..😐
Expressway are more expensive then National Highways so they required high density traffic so toll collection is high
That's why you see 8 lane expressway between Delhi and Mumbai and 4 lane expressway between Bengaluru and Chennai and 6-10 lane expressway between Bengaluru and Mysore
There is no expressway in himachal but there is one under construction in Jammu Bec Jammu has that required traffic if the traffic density is low and expressway is constructed you will be paying twice the toll in compared to same highway
National Highways are more then enough for majority of India
4 Expressway can handle more traffic then 4 lane highway but it's cost would be more then doble of same 4 lane highway it could be upto 2-5 times
Kolkata - Delhi Expressway when 🥹 ?
Also Kalyani Express Way not mentioned ?
It's varanasi kolkata expressway
Bec it's not opening this year
Wait for 1 or 2 more years for it
@@indiainfrastructure ok and Kalyani Express Way ?
Toll charges are too high for these roads to drive. I pay taxes still o need to pay toll charges too.
Sir your paying less taxes Bec of toll roads if the toll are stops get ready for even more taxes and you won't get the high class highways plus you will get free potholes and traffic just like non toll roads
Yes I understand I am with you on high taxes those needs to be decreased but toll system is the best system
Mumbai -delhi will take another 3 years to complete
Majority of its section will be completed this year some patches can take more time
small expansion in rail network.
sad to see.
rail is life of india
Wait for few years Sir
Railway budget was 29000 crore in 2013-14
It rose to just 55,000 cr by 2018-19
By 2023-24 it reached 2,46,000 crore
Now that was the amazing growth from 2019 to 2024
Your goona see massive railway infrastructure now
These doesn't include dedicated freight corridor
With Dedicated freight Corridor railway infrastructure is increasing really really fast
And for your last time sorry sir your wrong
Road & Highways are life of India 70% of all the freight in india goes through road
@indiainfrastructure rail freight is cheaper, faster and greener than road freight. govt focuses on road because toll collection 💰
Sorry sir it's not cheap Bec freight railway charges more then normal so they can subsidized passenger railway which is in heavy loss that's then it's damm slow freight railway have a average speed of 24 km/hr business and industry prefer road then railway Bec of this
That's the reason dedicated freight corridor are created as a separate company not under railway so any politicians can't use dedicated freight corridor for subsidizing passenger railway and can provide cheap freight
Sir you are seeing more & better highway Bec they have tolls the toll is used to pay the loan
Railway don't have toll that's why you see less railway as compared to highways
Remove these tolls and you will see less and less highways and more bad quality highways
From 55,000 cr to 2,50,000 cr railway budget growth was very very good but still that 2.5 lakh crore is less
American railway which is 100% private is the cheapest freight railway in the world
They charge the cheapest for 1 ton per km even cheaper then China India and Africa
Why everything is in north india
what is mysore chennai
chennai surat
nh66 in kerala
visakapatnam raipur
first sothern states are 20% of indian land.and 80% are other states
DELHI MUMBAI EXPRESS WAY
WE NEED MINIMUM 1 LAKH KM MULTIMODAL MULTILATRAL EXPRESS WAY IN NEXT 5 YEAR IF WE WANT TO BE SUPER POWER UP TO 2047
What about Bangalore Chennai Expressway??
Sir I have mentioned in the video it's gonna be completed by August 2025
@ ohh my bad. Please don’t call me sir. Thanks a lot for your videos :)
Lets be serious. Delhi Mubai expresway is more likely to be closer to 2030.
Majority of its section will be completed by this year some patches can take more time
@ not even close..closer to 2030
Very high Toll Tax middle class pay hefty income tax , then GST then Toll tax what is the Government meant for, why we give so high income tax
Sir due to toll tax your taxes are low and your getting high quality road + majority of the toll tax comes from Trucks
And these toll roads have made our logistics cost less due to which your paying less price for products you buy
And I am with you on high income taxes and high GST but toll is fairly charged and is very very good
Where is the land???? Soon India will have no forests
Kolkata is missing since everytime
Kya Sach me India ko expressway ki jarurat he doston-German Shepherd
Think Nagour- Thane Mahamarg is missing here..
You meant Mumbai nagpur Expressway?
@indiainfrastructure yeah
The final stretch will take another 2 months according to the official of Maharashtra State Road Development Corporation (MSRDC)
@indiainfrastructure thanks bro
Jai modi ji...
Full credit to Gadkari ji for amazing work. He should be the PM.
Modi's contribution is zero.
No north east
Mere hisab se desh Ko pehle industries Ko khada kar na chahiye jis se logo ko jobs mile
Industries ko road aur railway chaiye hotte hain
China ne 1976 main apni economy of khola par pehle road aur railway banaye tab jakke 1990 ke bad wahan industries badhi
Jab road hi nahi hogga too truck Kahan se ayengen?
@indiainfrastructure ye baat poori tareeke se sahi nahi hai ki roads achhi hone se industry khadi hojayegi Desh ke paas achhi skills lebur bhi to honi chahiye is or government bilkul bhi dhyan nahi de rahi hi education system Ko acha karne pe jada dhyan dena chahiye
Delhi Mumbai is delayed at least by 2 years if not more.. and from the list only 50 percent expressway will open in 2025 rest are delayed
राष्ट्रपति नरेंद्र मोदी के नेतृत्व में सरकार के लिए भारत की जनता को बधाई. थाई लोगों से भारत की चतुराई
PM Narendra Modi
@ tanyawas
mumbai delhi 2025 not possible
Bjp respect button 🤞🚩
Modiji ❤ gadghari ji❤
All tax money going into roads...😂😂😂hope they will putmore taxes soon to maintain them😂😂😂
These roads are self funded with toll
Gov just give seed money
As always with these type of posts EVERYTHING seems amazing
India is great
Modi works miracles
Are these videos OBJECTIVE
These are my observations
Some parts of the roads are poorly constructed
No lanes painted-no lane control
All manner of vehicles allowed -many not roadworthy-bicycles-overloaded trucks-rickshaws-horse and cart
No night lights
No ‘cats eyes’
Unqualified drivers
No regular maintenance
No adequate stops for toilet breaks-food
The access roads to these highways in poor condition
India can spend billions on these highways but cannot maintain roads in towns and cities
Lol you have made a similar kind of video in Jan 2024 but the same expressway was yet to operationalise.
You should make a video which expressway Should have been completed by 2024 but not completed.
First of all thank you for being my subscribers and watching my videos 😀🙏
Sir I get the data frm India top news channel and they get the information from nitin gadkari and NHAI
If they say this expressway is going to be completed by 2024 I will be sharing the same information
you know sir there are delays in infrastructure construction in India
I have noted your point of Completion of Expressway I did mention it in Amritsar bikaner jamnagar Expressway I should have mention in dwarka and Delhi Mumbai expressway which section of it were completed
And don't call me godi youtuber sir it hurts 🤕🙏🥹
This channel is all about infrastructure and minimum politics
If you wanna know about politics then I support good policies that's why I support Raghuram Rajan ji who did Bharat jodo yatra with Rahul Gandhi
And he says Indian gov need to privatised all the gov companies
So I hope you get it now I am not that youtuber
I have noted your point will mention which expressways were completed in the last year for my upcoming videos
@@indiainfrastructure wow you are very humble guy.
Sorry if this hurts you
It's okay Sir except godi youtuber everything you said is okay and I have noted your Advise and will try to implement it
Plus I not just only try to give information I also try to give information with good Video and music as a very enjoyable presentation
@@indiainfrastructure don't call me Sir bro my name is Anuj.
And I watch all your videos.
People with such manners should be leading Bharat. @@indiainfrastructure
Where aamas darbhanga exoressway
Patna kolkata expressway
Under Construction Will complete next year or after
In this video I have only mentioned those Expressways which are opening this year
Still poor States in India only Kerala people are rich
😂😂😂 Bhikari kerala ka bhikari mullla
भाई पूरे देश में चल रहे या नया काम शुरू वाले कार्यो के वीडियो बनाया करो पल्ज़ न कि एक दो राज्यो के ही ।।
और जो प्रोजेक्ट शुरू होने वाले हो या चल रहे हो , तो उनकी डिटेल्स पूरी दिया करो ,ये प्रोजेक्ट कहा है , और कौनसी कम्पनी बना रही हैं और हो सके तो उनके ऑफिस की लोकेशन भी बता दिया करो पल्ज़ भाई