This is an odd argument, I could make the curve tighter or possiby at a 90, but believe it or not, while locating the construction manager paints a white line on the ground, within 3 days the locators will finnish there job, then I plow no further than 1 ft fron this line, if I stray from this line then the blueprint has been ignored, and could be a possible costly mistake
Should always pre-cut gravel driveways. Even if you get through, there is a high chance the vibrations will pound the cable against the rocks, causing damage to the cable.
@Someone13426 I don't, I can explain some things if u need help, the first thing we had to do is upgrade the blade to a heavier and more reinforced one, with a bigger "toe". Also if your tracks are spinning your not doing any good, try to creep the machine, the slower the better when it comes to packed gravel or ground, the creep option helps alot, u can also turn down each track individually, making it creep even more, I hope this helps as this is a light weight machine, but fits in anywere and saved us alot of time and effort 👌
that is just what you want is to have a big curves in your yard so it is harder not to hit if you need to something else in the ground latter.
No one cares besides the customer.
This is an odd argument, I could make the curve tighter or possiby at a 90, but believe it or not, while locating the construction manager paints a white line on the ground, within 3 days the locators will finnish there job, then I plow no further than 1 ft fron this line, if I stray from this line then the blueprint has been ignored, and could be a possible costly mistake
Should always put conduit in gravel driveways
Do one pass on the driveway without the wire and 2nd pass with it attached
That's fair
Should always pre-cut gravel driveways. Even if you get through, there is a high chance the vibrations will pound the cable against the rocks, causing damage to the cable.
Is it gas or diesel?
Gas
@@WorkingBeard it does take gasoline I promise I use the machine every day
@@ImPlayydo you have a good guide to learn how to use one of these?
@Someone13426 I don't, I can explain some things if u need help, the first thing we had to do is upgrade the blade to a heavier and more reinforced one, with a bigger "toe". Also if your tracks are spinning your not doing any good, try to creep the machine, the slower the better when it comes to packed gravel or ground, the creep option helps alot, u can also turn down each track individually, making it creep even more, I hope this helps as this is a light weight machine, but fits in anywere and saved us alot of time and effort 👌
Mine is gas, but I believe they have a diesel option or a possible swap
Do they make a version that can lay pipe?
Lol that doesnt even make sense
@@officialaustenmorpho3224 with a 12 inch length of chain and a pull grip
@@imtheonevanhalen1557 unless youre putting in rolled conduit theres absolutely no way this machine can install pipe. How tf you gonna bend 4inch ABS
heee... at 30cm it was not possible on the road. only sand and soft soil
Order the heavier blade and its much better!!!
@@ImPlayy There is no chance of going deeper in hard. I had to test and it is not suitable above 30 max 35cm
What is the price on that machine?
~30k
35k
What is the price in us dollars
Quiero saver el precio
35k
The way they ran the machine was wrong.
Should never let it sit while itd plowing. That's how cable is damaged.
Still breaks pipes
That part requires skill. You'll get there.