  • @Notch8
    @Notch8 7 місяців тому

    Superior wall doesn't do the exact layout of where the walls should go and make sure everything is square? That has to be done by builder or other contractor? Surveyor?

    • @TodayIWorkOn
      @TodayIWorkOn  7 місяців тому

      O no. They just show up and drop those panels. The site needs to be properly prepped and if it’s not ready for them and the crane shows up, you pay for their loss in time. They check level and square off with their machines. It’s a process

  • @Nicker000
    @Nicker000 10 місяців тому

    can you rent a Skid Steer Vibratory Roller to attach to the kubota?

    • @TodayIWorkOn
      @TodayIWorkOn  10 місяців тому

      Never looked into that but I sure will next time I do this.

    • @Nicker000
      @Nicker000 10 місяців тому

      @@TodayIWorkOn next time? how many forever homes are you building for yourself?😂
      I saw the poor kid slumped over pushing that tiny compactor around, knew there had to be a better way not just for him but for your foundation to achieve optimal results.