Thank you so much for all your efforts
Welcome for always comments on my videos
Thanks for sharing ! very useful you are ın hurry.
Welcome
How can we make copy of existing wbs without any internal changes? Becouse I’m doing this but it’s going to messy .
Just copy the WBS remove other WBs relationships just if you want
Thanks, but i need to make relationships as it is. And when I’m copying these are changing there sequence.
@@rahulnagarwal4990 just check the option under Relationships (only between copied activities)
@@SoftEdemy sir I'm making copy of a WBS but after copying activities had been changed there sequence. So how can I fix it?
@rahulnagarwal4990 please contact to my whatsapp wa.me/+923155537580Share screenshots their
sir kindly make vedio on how to create WBS from BOQ .
Check other interview assignment videos . Already some useful tips are their
sir i am unable how to get experience over Primavera please Guide me as I am regular listener of your You Tube channel Regard
Thanks for your comment. Please ask the question or problem you are facing
Sir Behfore Starting any kind of project Ie villas project what are pre requsit requirements how to start work on primavara
@@shriafwazirkhanwazir1747 BOQComplete with measurement sheets if available Detailed drawings Specifications Contract Complete For baseline, Tendering schedule.
Sir have prepared any such lecture on this
Allah bless you many more happiness for your kind response
Thank you so much for all your efforts
Welcome for always comments on my videos
Thanks for sharing ! very useful you are ın hurry.
Welcome
How can we make copy of existing wbs without any internal changes? Becouse I’m doing this but it’s going to messy .
Just copy the WBS remove other WBs relationships just if you want
Thanks, but i need to make relationships as it is. And when I’m copying these are changing there sequence.
@@rahulnagarwal4990 just check the option under Relationships (only between copied activities)
@@SoftEdemy sir I'm making copy of a WBS but after copying activities had been changed there sequence. So how can I fix it?
@rahulnagarwal4990 please contact to my whatsapp wa.me/+923155537580
Share screenshots their
sir kindly make vedio on how to create WBS from BOQ .
Check other interview assignment videos . Already some useful tips are their
sir i am unable how to get experience over Primavera please Guide me as I am regular listener of your You Tube channel Regard
Thanks for your comment. Please ask the question or problem you are facing
Sir Behfore Starting any kind of project Ie villas project what are pre requsit requirements how to start work on primavara
@@shriafwazirkhanwazir1747 BOQ
Complete with measurement sheets if available
Detailed drawings
Specifications
Contract Complete
For baseline, Tendering schedule.
Sir have prepared any such lecture on this
Allah bless you many more happiness for your kind response