  • FOR LIST OF MATERIALS, PLEASE SEE BELOW:
    DESCRIPTION SIZE PCS ITEM COST TOTAL COST
    Angle Bar 2x2 6 680 4,080.00
    Tubular 2x4 13 870 11,310.00
    Tubular 2x2 5 630 3,150.00
    Tubular 1x1 9 310 2,790.00
    Marin Plywood 3/4 7 1050 7,350.00
    ReBar 9mm 5 190 950.00
    ReBar 10mm 2 220 440.00
    Black Screw 1 1/2 200 1 200.00
    Semento (Rizal Brand)2 2 200 400.00
    Buhangin Sack 5 25 125.00
    Welding Rod (Electrodes) e3018-3 80 240.00
    PROJECT TOTAL COST 31,035.00