Right. But grid current is 5 rs per unit, so recovery of 5 lakh investment is impossible. Govt should give 50% subsidy on solar. Even then solar is too much bother.
मुझे 12 इंच वाली छोटी वाली 5 आरा मशीन डेली 12 घंटे चलानी है, इनका टोटल लोड 3.5 kw होगा, क्या सोलर electricity से ये मशीनें चल पाएंगी ? यदि हां तो कितने kw का system लगवाना पड़ेगा?
@@MrKhabbu sir,we are going for 7.5 kva system with 8 batteries. Can u please explain that how long will 5 years warranty batteries last if 5 bend saw machine continue to run daily for 12 hours. And kya poore 12 ghante daily (when sun light is available) 5 machine sirf solar electricity se chal payengi? Ya fir itni electricity solar se nahi ban payegi?
@@MrKhabbu Bhai, ek doubt aur door karo, mere town me kisi ne bola hai ki pura system ek hi company ka lena, agar sab kuch alag alag company ka loge to koi fault aane par battery wala bolega panel se problem hai, panel wale ko complaint karoge to wo bolega battery ki problem hai, aise hi inverter wala bolega battery/inverter me problem hai.. mujhe off grid 7.5 kva lagwana hai, small scale wood workshop ke liye, jisme bijli meter me load 3 kw tak ata hai, chhoti 12 inch wali ara machine , lakdi ki sanding ke liye 750 watt ki grinder motor etc.. please mera ye doubt clear aur karo
Your explanation of installation of a Solar system and ROI is VERY INFORMATIVE to the general public BUT due to the ever rising costs and technological progress a) I feel this blog MUST be periodically updated. b) Kindly make an EXCLUSIVE & COMPREHENSIVE series on EACH(INDIVIDUAL) of the 'Components' required to install a residential Solar system which will include i)AC/DC Earthing. The types and number of Earthings specific to AC and DC current ; ii) Architectural Drawings (Concealed,for a to-be-constructed house) or the Conduiting path (Exposed,for an already constructed house) ; iii) Specific DC wiring, guage, colour coding and a general Circuit diagram universal to all installations; iv) a complete set of DC Protection devices, which is VERY, VERY IMPORTANT (lined-up in order of which Device comes first, second, third etc.from the PCU. Please include in this list SPD, RCCB/RCBO, Hi/Lo cut-off(perhaps when exclusively operating from Solar Panels without Battery backup or from AC grid)Inverter technologies AC, Washing machine, Fridge and NOT referring to be launched branded Solar ACs, Washing Machines, Fridges ; v) Steel grade and design for the structure for the String of Panels. Method of constructing the base for this structure. I technically totally disagree on the prevailing method of breaking a portion of the Roof upper surface till the exposed steel bars to construct a PCC base for the Solar panel structure base plate for the reasons of the number Solar panels to be installed South facing(not all roofs can accomodate this number and, therefore,a compromise), affecting the CALCULATED tensile strength of the exposed steel and Roof Load in cubic feet, Seepage during the monsoon and wherever Fastners have been clamped to hold down the Conduit piping. These shortcomings will be avoided for a to be construed house as the Plan will have incorporated DC Wiring details worked out in collaboration with a Technically skilled Solar technician(who can decide the best Location for the PCU and Batteries)for best results; vi) The different types of Solar panels, their pros and cons ; vii) Different types of Lithium batteries, their pros and cons ; viii) Types of PCU, Transformer and Transformerless (and which Type suits who and for what Appliances, pros and cons of Off Grid, On Grid and Hybrid. 2. I have enumerated only a few notably precautions and there are OVER 30 Points/Precautions to be borne in mind BEFORE considering installing a near perfect Solar System Set-up. 3. RSVP and regards.
First off all thanks for all this appropriate comment I am glad to inform you. If u are my regular viewer then u know very well I explained mostly home roof top systems in those systems customer have not big Budgets and most of my video's explain from 1 kw to 10kw systems in a initial stage like as a 1 or 2 kw systems customers don't have need excessive amount of money spend on this so I can't at this Budget on this system. But it's necessary and the second thing is that AC & DC earthing is much important in megawatt systems. Thanku very much ....
I'm sorry I was not a subscriber to your content (though am now) was, therefore, unaware of your covered Topics. Being a Honorary Consultant on Home Products and miscellany essentials, both Time and Inclination permitting do comment on Articles needing further clarity, clarifications and in most cases exposing these fly-by-night Cut & paste UA-camrs who are given tutored scripts by sponsoring companies where in most cases is suppressing the cons, termed as gross misinformation to the Consumer's misfortune and where laws to Consumer protection is merely a paper tiger encouraging Manufacturers/Sellers to adopt such sophistry because of the government's accomodating attitude which reminds the Customer of the Caveat Emptor unwritten clause which consequent to this apathy leads the Customer/end user to be sceptical and eventually distrustful of reality. So ultimately from the aforesaid there are only two losers, the Customer AND the honest UA-cam, in your case (lost being in the utmost minority). Reason MY NOT BEING A UA-camR. Hope you enjoy reading the above AND in conclusion Honesty is NEVER the best policy. REGARDS
@@greensolarindia west Uttar Pradesh me Jahan winter me minimum temperature 3 degrees Tak jata hai, kya annual average 6 unit per day west Uttar Pradesh me banega same video me bataya hua aapka wala system lagaane par?
@greensolarindia west Uttar Pradesh me Jahan winter me minimum temperature 3 degrees Tak jata hai, kya annual average 6 unit per day west Uttar Pradesh me banega same video me bataya hua aapka wala system lagaane par?
Sir, 1 refrigerator, 4 AC, 2hp Water Pump, 3 TV for summer season and 1 refrigerator, 4 Room Heater , 2hp Water Pump, 3 TV, 1 Gesear for winter season. Isme kitne Kv ka solar lagwaye. Plz reply karre
Sar mujhe please bataiye mujhe ek induction cooker chalana hai jo bijali se chalta use Mujhe solar system se chalana hai sirf induction cooker hi chalna hai Tu Mujhe kaun sa solar system lagana chahie please guide kar dijiye
Ajkal garmi bohot jada sabse main need AC ki h. 1.5 ton Inverter AC k liye setup kam s kam kitne ka lagega without grid system direct battery s chal jaye.. matlab sirf 1.5 ton inverter AC k liye seprate system lagana ho to
Agr sirf AC CHALANI HAI TO HYBRID SOLAR AC IS BEST OPTION YE DIN ME DIRECT SOLAR PANEL SE CHALEGI ( 1.5 ton AC KE LIYE 3.5kva system chahiye cost approx 1.8 lac
@@entertainmentzone9919 iske 2 reason hai 1- 1Ton ac is 1200 watt and 1.5 ton ac is 1800 watt and 2kva inverter safe load running capacity is 1300 watt that’s a fist problem 2- 2kva 24 volt system use hota hai mostly aise me ac pr backup nhi milega aur 2 battery hone se per battery load high rhega to battery kharab hone ke chance bd jayege . I hope ka confusion clear hua hoga
electricity board/company purchasing at Rs.2.25 per unit only , not ar Rs.10.00 per unit in Gujarat. Return calculation is not correct for solar panel.
@@greensolarindia Which solar company is best ? I personally have Loom solar. I want buy 3 kw solar panel again, should i buy any other or Loom solar ❓🙏
Solar panel को साउथ डायरेशन में टिल्ट किया जाता है। मान लीजिए मेरा घर साउथ ईस्ट फेसिंग है। तो मुझे सोलर पैनल का टिल्ट घर के राइट कॉर्नर में देना पड़ेगा। पर मैं अपने सेटअप को तिरछा नही लगाना चाहता। तो क्या में अपने सेटअप को सीधा लगा कर उसको कॉर्नर से टिल्ट कर सकता हूं? जैसे मेरा साउथ कॉर्नर का पिलर 2 फीट का ईस्ट और वेस्ट के पिलर 3 फीट के और नॉर्थ वाला पिलर 4 फीट का। क्या इस प्रकार का स्ट्रक्चर संभव है? क्या आपने लगाया है?
Good explaination. Now I know the basics atleast. Thank you for your sincere efforts.
Right. But grid current is 5 rs per unit, so recovery of 5 lakh investment is impossible. Govt should give 50% subsidy on solar. Even then solar is too much bother.
ধন্যবাদ দাদা
Solar panel installation is a one time(long term) investment which can significantly lower 30k rupees each year ...
Itni detail me jankari dene ke liyeBahut bahut dhanyawad bhai.
मुझे 12 इंच वाली छोटी वाली 5 आरा मशीन डेली 12 घंटे चलानी है, इनका टोटल लोड 3.5 kw होगा, क्या सोलर electricity से ये मशीनें चल पाएंगी ? यदि हां तो कितने kw का system लगवाना पड़ेगा?
@@MrKhabbu sir,we are going for 7.5 kva system with 8 batteries. Can u please explain that how long will 5 years warranty batteries last if 5 bend saw machine continue to run daily for 12 hours. And kya poore 12 ghante daily (when sun light is available) 5 machine sirf solar electricity se chal payengi? Ya fir itni electricity solar se nahi ban payegi?
@@MrKhabbu moradabad uttar pradesh
@@MrKhabbu Bhai, ek doubt aur door karo, mere town me kisi ne bola hai ki pura system ek hi company ka lena, agar sab kuch alag alag company ka loge to koi fault aane par battery wala bolega panel se problem hai, panel wale ko complaint karoge to wo bolega battery ki problem hai, aise hi inverter wala bolega battery/inverter me problem hai.. mujhe off grid 7.5 kva lagwana hai, small scale wood workshop ke liye, jisme bijli meter me load 3 kw tak ata hai, chhoti 12 inch wali ara machine , lakdi ki sanding ke liye 750 watt ki grinder motor etc.. please mera ye doubt clear aur karo
Thank you sirji for solar system. ❤❤❤❤❤❤❤❤❤❤❤❤❤
5kw k liye penal kitani jagah chaiye.
Your explanation of installation of a Solar system and ROI is VERY INFORMATIVE to the general public BUT due to the ever rising costs and technological progress a) I feel this blog MUST be periodically updated. b) Kindly make an EXCLUSIVE & COMPREHENSIVE series on EACH(INDIVIDUAL) of the 'Components' required to install a residential Solar system which will include i)AC/DC Earthing. The types and number of Earthings specific to AC and DC current ; ii) Architectural Drawings (Concealed,for a to-be-constructed house) or the Conduiting path (Exposed,for an already constructed house) ; iii) Specific DC wiring, guage, colour coding and a general Circuit diagram universal to all installations; iv) a complete set of DC Protection devices, which is VERY, VERY IMPORTANT (lined-up in order of which Device comes first, second, third etc.from the PCU. Please include in this list SPD, RCCB/RCBO, Hi/Lo cut-off(perhaps when exclusively operating from Solar Panels without Battery backup or from AC grid)Inverter technologies AC, Washing machine, Fridge and NOT referring to be launched branded Solar ACs, Washing Machines, Fridges ; v) Steel grade and design for the structure for the String of Panels. Method of constructing the base for this structure. I technically totally disagree on the prevailing method of breaking a portion of the Roof upper surface till the exposed steel bars to construct a PCC base for the Solar panel structure base plate for the reasons of the number Solar panels to be installed South facing(not all roofs can accomodate this number and, therefore,a compromise), affecting the CALCULATED tensile strength of the exposed steel and Roof Load in cubic feet, Seepage during the monsoon and wherever Fastners have been clamped to hold down the Conduit piping. These shortcomings will be avoided for a to be construed house as the Plan will have incorporated DC Wiring details worked out in collaboration with a Technically skilled Solar technician(who can decide the best Location for the PCU and Batteries)for best results; vi) The different types of Solar panels, their pros and cons ; vii) Different types of Lithium batteries, their pros and cons ; viii) Types of PCU, Transformer and Transformerless (and which Type suits who and for what Appliances, pros and cons of Off Grid, On Grid and Hybrid.
2. I have enumerated only a few notably precautions and there are OVER 30 Points/Precautions to be borne in mind BEFORE considering installing a near perfect Solar System Set-up.
3. RSVP and regards.
First off all thanks for all this appropriate comment I am glad to inform you. If u are my regular viewer then u know very well I explained mostly home roof top systems in those systems customer have not big Budgets and most of my video's explain from 1 kw to 10kw systems in a initial stage like as a 1 or 2 kw systems customers don't have need excessive amount of money spend on this so I can't at this Budget on this system. But it's necessary and the second thing is that AC & DC earthing is much important in megawatt systems.
Thanku very much ....
I'm sorry I was not a subscriber to your content (though am now) was, therefore, unaware of your covered Topics. Being a Honorary Consultant on Home Products and miscellany essentials, both Time and Inclination permitting do comment on Articles needing further clarity, clarifications and in most cases exposing these fly-by-night Cut & paste UA-camrs who are given tutored scripts by sponsoring companies where in most cases is suppressing the cons, termed as gross misinformation to the Consumer's misfortune and where laws to Consumer protection is merely a paper tiger encouraging Manufacturers/Sellers to adopt such sophistry because of the government's accomodating attitude which reminds the Customer of the Caveat Emptor unwritten clause which consequent to this apathy leads the Customer/end user to be sceptical and eventually distrustful of reality. So ultimately from the aforesaid there are only two losers, the Customer AND the honest UA-cam, in your case (lost being in the utmost minority). Reason MY NOT BEING A UA-camR. Hope you enjoy reading the above AND in conclusion Honesty is NEVER the best policy. REGARDS
@@greensolarindia west Uttar Pradesh me Jahan winter me minimum temperature 3 degrees Tak jata hai, kya annual average 6 unit per day west Uttar Pradesh me banega same video me bataya hua aapka wala system lagaane par?
Very good information thank you
Pl.suggest 5 kw grid solar system having three phase domestic eb connection
Ok sir
@greensolarindia west Uttar Pradesh me Jahan winter me minimum temperature 3 degrees Tak jata hai, kya annual average 6 unit per day west Uttar Pradesh me banega same video me bataya hua aapka wala system lagaane par?
Good explanation but what about On Grid and Hybrid. You did not tell anything about all those. So incomplete video.
Very nice
Very good information sir 🙏
Very Nicely Explained. Kindly let us about the Govt Subsidy which is available
Ok sir
सबसे अच्छी ड्यूरेबल कंपनी कौन सी जिसका
सोलर सिस्टम लेवे
Bahot Shandar Tarike Se samjhaya Bhai Apne 👏👏
In west bengal cese area rooftop solar not available for on line.
Thank you very much for this great information
Easy to calculate
Total expense-MNRE Subsidy is the real expense
MNRE is eaten by the solar installers 🙂
Personal Flate me karsake hai kya
Good information sir thanks Jai Hind Jai Bharat
🇮🇳 Jai Hind Jai bharat
Good 👌👍
Very well explained.
Please give info on hybrid system
Sir, 1 refrigerator, 4 AC, 2hp Water Pump, 3 TV for summer season and 1 refrigerator, 4 Room Heater , 2hp Water Pump, 3 TV, 1 Gesear for winter season. Isme kitne Kv ka solar lagwaye. Plz reply karre
पता चला क्या.. Jldi बता
Sorry, not interested to tell you, First behave yourself after that ask someone
Minimum 15kw system day me complete load run ho jayega battery ka calculation night load ki time ke according hi kiya ja skta hai
Aree sir zara space ke bare me bhi batadete mere chaht 150sqft hai
Kitne half cut or poly laga sakta hoon
Ok sir next video full details ka hoga
Thanks bhai
Good explanation but costly
3kw ka b ek detailed video banaye 🙏🙏
Most useful video
Good information
Thnxx
Sar mujhe please bataiye mujhe ek induction cooker chalana hai jo bijali se chalta use Mujhe solar system se chalana hai sirf induction cooker hi chalna hai Tu Mujhe kaun sa solar system lagana chahie please guide kar dijiye
Sir sirf induction ke liye solar lgwana bahut mhga pdega
Kya instalment me lagwa sakte hai??
Yes
Ongrid system me battery लगता h?
Nhi BT Hybrid system me lgti hai
100 watt ka solar plate me kitne ka battery lagegs
5.5 kw da kina unit ban da aa
Pls suggest details for 3 kva complete solar system in hyderabad RURAL AREA
Ok sir
Nice explanation
Good video
Latest technology lithium ion phosphate battery ka sath bhi 3&5 kw video banayea
Ok sir
उचित नहीं है पाचं साल के बाद बैटरी की लागत क्या होगी जम नही रहा
Very Good.. Really well explained
Thanks a lot
If we take lithium battery what will be the cost and advantage?
Solar lagwana hai YA Govt ka Solar Project Finance karna hai.
Itna Kharcha
Bhai government subsidies ka bhi to kuch batao.
Off grid me subsidiary nHi milti
Battry bhi to badalna padega
Pura plant ka 20unit daily?
Yes, if use mono perc then 30 unit per day
ongrid or hybrid to bataye hi nahi
Ajkal garmi bohot jada sabse main need AC ki h.
1.5 ton Inverter AC k liye setup kam s kam kitne ka lagega without grid system direct battery s chal jaye.. matlab sirf 1.5 ton inverter AC k liye seprate system lagana ho to
Agr sirf AC CHALANI HAI TO HYBRID SOLAR AC IS BEST OPTION YE DIN ME DIRECT SOLAR PANEL SE CHALEGI ( 1.5 ton AC KE LIYE 3.5kva system chahiye cost approx 1.8 lac
@@greensolarindia 1.5 ton ac 5star 1200-1500 watt ka rehta hai for 3.5kv ka setup kiyun 2kv me bhi to ho jana chahiye
@@entertainmentzone9919 iske 2 reason hai
1- 1Ton ac is 1200 watt and 1.5 ton ac is 1800 watt and 2kva inverter safe load running capacity is 1300 watt that’s a fist problem
2- 2kva 24 volt system use hota hai mostly aise me ac pr backup nhi milega aur 2 battery hone se per battery load high rhega to battery kharab hone ke chance bd jayege .
I hope ka confusion clear hua hoga
electricity board/company purchasing at Rs.2.25 per unit only , not ar Rs.10.00 per unit in Gujarat. Return calculation is not correct for solar panel.
In Assam 8/- per unit electric ka kharch domestic connection me ata hain. Company job hamse kharidega tob sayad 3/4 rupiya tok mujhe dega.
Maharashtra me 12 rs par unil hai
5kva = 4kw and you confuse calculation, correct units heading
Sir Inverter is 5 KVA bt panel installed completely 5kw I hope u understand if I have little bit technical knowledge
Nhi lagna itna mehnga bijli ka bill de denge
Great sir🎉
Thank u sir
Very well explained in simple language .
Thanks and welcome
5k.v me ek sath kitne a. C chal sakte hai
Day time 2 AC
How to get subsidy, please make a step by step video ❓
Ok sir
@@greensolarindia
Which solar company is best ?
I personally have Loom solar.
I want buy 3 kw solar panel again, should i buy any other or Loom solar ❓🙏
Loom is gud bt panel price is to high . Warree is a gud option according price and generation
Poor man smiling in the CORNER....😁😁😁
Kya sir ji 390000 ka to hybrid lagwaya hai poly panal 5700 watt k sath
Aray sir ji koi subsidy nhe le hum ny na hee koi subsidy hai
Hybrid hai bhai
👍👍👍👍
Single 1.5 ton ac पूरे रात chla देगा.. Tb to koi mtlb है
गलत कैलकुलेशन जनता को मत दे दीजिए... Pl save India... 208000 Me Tata solar 5 Kva Ka Rate after Govt Subsidies
Sir off grid pr koi subsidy nhi milti hai
Bhai mujhe lagwana h 5kwt ka plz btao konsa best h on grid lagwana h
Jo ap kh rhe ho wo on grid hai
Solar panel को साउथ डायरेशन में टिल्ट किया जाता है।
मान लीजिए मेरा घर साउथ ईस्ट फेसिंग है।
तो मुझे सोलर पैनल का टिल्ट घर के राइट कॉर्नर में देना पड़ेगा।
पर मैं अपने सेटअप को तिरछा नही लगाना चाहता।
तो क्या में अपने सेटअप को सीधा लगा कर उसको कॉर्नर से टिल्ट कर सकता हूं?
जैसे मेरा साउथ कॉर्नर का पिलर 2 फीट का
ईस्ट और वेस्ट के पिलर 3 फीट के
और नॉर्थ वाला पिलर 4 फीट का।
क्या इस प्रकार का स्ट्रक्चर संभव है? क्या आपने लगाया है?
सर बिना साइट देखे बताना थोड़ा मुस्किल है ।
Usme subsidy kitni milegi
Off grid m subsidy ni milega
Bhau pen konsi h
Mujhe dekhna pdega vidoe tb bta skta hu 😃 ab yaad nhi hai
Pls explain on grid prices
Ok
4 lack ka interest 8000 per month
Sir itna interest rate mile to mujhe bhi Bata dena mai bhi invest krna chahuga 😃
@@greensolarindia bhai jisko jrurt hoti h paise ki usko isi ROI se paisa milta h
2kw ka kitna
May jun me GENERATION KAFI KAM ho jati hai 😢
Panel heating ki vjh se
@@greensolarindia sir koi upay
Rooftop system pr koi solution nhi hai .
Fir kayabfaida
@@MrKhabbu Brother aap kis state me rehte hai?
Hybrid... Ongrid ka to kuch bataya hi nahi
Next time I will explain
5-6 AC chalani ho toh
15 KVA
Aja Bhai Meri Traf me 2.5L me Lgwadunga
Etna manhga kyo bta rahe ho
5 saal hi chalte h ye, bss. Fir to warranty khtm and ye kaam krte nahi
Sirf battery change krna pdta hai panel 20 saal tk axa perform krte hai don’t worry va panel axi company ka purchase kre
bhai solar ki warranty 25 year ki hoti hai
@@greensolarindiaola mein agar panel damage ho jaye toh
@@MrKhabbu mere pass on grid h. Inme battery nahi lagti.
Abhi 4 yrs hue h. Kyaa kru ki aage Warrenty bdd jaaye
@@MrKhabbu 15 kw kaa h. 44 plates lagi h. 5 saal hone ko h. New inverter kitne kaa aayega
Bhai mujhe solar system lena hai agar sambhav ho to hme apna number de sakte ho kya
App apni need btade I will explain every thing
Sir aap number dijiye mujhe kuch jankari krni hai
Amritsar punjab Dealer phone number send Karo