Fastest ROI Solar PV System, Pinagaralan muna ni Sir. 8kW Solax error Bus Volt Fault - Bay Laguna
Вставка
- Опубліковано 5 лип 2022
- If you find this video informative and helpful, please subscribe to our channel so we can upload more videos. Comment down below if you have any questions about solar and we will try to answer them as much as we can.
/ topsolarcare
www.topsolarphil.ph
Nice
Dito sa Ilocos Sur, it took me less than 2 weeks for the net metering application and installation. Mabilis po sila (ISECO) and syempre, special thanks to Sir Top Solar Philippines for the technical assistance.
Nice
ano setting binago nyo po to solve bus volt fault.?
salamat
Sir can you also do net metering with a hybrid system that has a battery?
Yes po basta hybrid on grid
Let's admit that net metering application is very tedious and doesn't "ease doing business" in the Philippines. The statistics show that it takes longer and the list of requirements is way overboard!
Hello atty. Sorry ngayon lang nakapag reply sa mga comments. Dami ng nagagalit hindi daw ako sumasagot
Sir, balak ko po ay nasa meralco p rin ang big loads ko tulad ng 2.5HP aircon at dalawang water heater.. yung iba naman po n appliances ay naka solar.. pwede ko pa rin po ba iapply ng net metering yung ganun seyup..?
Kung may export function ang inverter nyo pwede po. Basta may certification ang inverter
Gudeveng po nagbibinta po ba kayo ng panels at ibang mga gamit sa
Solar.
Pamessage po kami sa Facebook.com/topsolarcare
sir pwde pala maghybrid system khit walang net metering?
Basta may limiter sir
hindi pala require ni meralco yung net metering sir?
ilan months po inabot yun net metering sa laguna?
Mabilis po dyan eh. 2 months to 3 months
@@TopSolarPhil how much inaabot po yun net metering sa inyo? Ty po