SAP PP Reorder Point Planning. Automatic / Manual Reorder Point Planning

Поділитися
Вставка
  • Опубліковано 15 вер 2024
  • SAP PP Reorder Point Planning. Automatic / Manual Reorder Point Planning
    MRP Type VB,VM
    SAP PP Consumption Base Planning

КОМЕНТАРІ • 35

  • @virendrasinghkandwal
    @virendrasinghkandwal 17 днів тому +1

    thanks for the video, it helped me

  • @RohitMoghe
    @RohitMoghe Рік тому +1

    Thank You, Excellent work highly appreciated

  • @dipakraikwar
    @dipakraikwar 3 роки тому +1

    Hello Sir, you explained the ROP concept in a very nice and simple way. Thank you.

  • @pravinmalve2165
    @pravinmalve2165 2 роки тому +1

    Excellent work highly appreciated

  • @SSAHER12345
    @SSAHER12345 6 місяців тому +1

    I have an issue, we have one material with MRP type as VB, reorder point is 1 and min lot size is 2. Currently Stock is zero for this material, when we run MRP it created the PR for two qty, next day when we again run the MRP it again created the PR for additional 2 qty. As the requirement was already fulfill why system has again created the PR.

    • @YASHTOUCH
      @YASHTOUCH  5 місяців тому

      Hi Could you please mail me your issue with all proper screenshot of Master data all MRP Views and how you take MRP.

  • @mahendrakhandagale7591
    @mahendrakhandagale7591 4 роки тому +1

    Very nice explained.

  • @rajatnandanwadkar4650
    @rajatnandanwadkar4650 7 місяців тому

    Hello Sir,Can you please tell if the proposal can be triggered in the same way you showed but without running md03. i mean whenever stock falls below reorder point automatically system should generate proposal without manually running md03

  • @venkataramanaadapaka9728
    @venkataramanaadapaka9728 3 роки тому +1

    Very nice

  • @nileshbansod4646
    @nileshbansod4646 3 роки тому +1

    Super explanation sir we are waiting for new video of capacity requirements planning...

  • @zakharkoval5740
    @zakharkoval5740 Рік тому +1

    Hello sir! I did the same in my sandbox. But I had a stock of 260 kg. Why, after running the MRP, I didn’t have a need for 400?

    • @YASHTOUCH
      @YASHTOUCH  Рік тому

      Plz send your query in details to me on Mail.Mail Id is available on About section in Channel.

  • @zakharkoval5740
    @zakharkoval5740 Рік тому +1

    hello sir! i did not understand difference beetwen automatic ROP with Fix lot size and manual ROP

    • @YASHTOUCH
      @YASHTOUCH  Рік тому

      Plz send your query in details to me on Mail.Mail Id is available on About section in Channel.

  • @syedaamirraza6065
    @syedaamirraza6065 3 роки тому +1

    how this 65 ROP appears? can you please explain the calculation in automatic ROP.

    • @YASHTOUCH
      @YASHTOUCH  3 роки тому

      Hello ,
      You can run the same in system for understand better.

    • @syedaamirraza6065
      @syedaamirraza6065 3 роки тому

      @@YASHTOUCH Same question from my side. Please explain based on your parameters.

  • @Stocksinnews-bbm813
    @Stocksinnews-bbm813 2 роки тому

    can you explain what happens if goes below min safety level in VB .

  • @prasad2447
    @prasad2447 3 роки тому +1

    How did you calculate reorder point and max stock level

  • @user-dr1th6jb1h
    @user-dr1th6jb1h 11 місяців тому

    Sir, Please explain how system is calculating Automatic Reorder point value behalf of consumption forecasting .

  • @prasad2447
    @prasad2447 3 роки тому +1

    How to download list of materials which is below reorder point ?

    • @YASHTOUCH
      @YASHTOUCH  3 роки тому

      In standard SAP no any Report exist with this requirement. however in table level you can get it.

  • @viji791
    @viji791 11 місяців тому

    Hi sir how to take Old ROP report

  • @niveditamaharana9038
    @niveditamaharana9038 Рік тому +1

    Kindly share you email id to know more about class.

    • @YASHTOUCH
      @YASHTOUCH  Рік тому

      yashrajinamdar90@gmail.com