Time and Work Problems Shortcut & Tricks (In Hindi)

Поділитися
Вставка
  • Опубліковано 18 лис 2024

КОМЕНТАРІ • 651

  • @itssupriyahere
    @itssupriyahere 2 роки тому +8

    I noticed one thing in this type of question. LCM of 'or' variables will be the ans of the Question

  • @kolkatarchadbagan1090
    @kolkatarchadbagan1090 5 років тому +3

    Great sir..main kitna exam me ye wala question wrong ans kiya hai..lekin ab full clear hai...Math a weak achi ami sir...apnar channel through clear korte prchi aste aste

  • @candyqueen3878
    @candyqueen3878 5 років тому +2

    My language is tamil... I don't know even a small word hindi.. But ur cls clearly expalin.. Hats off u.. Thanks a lot

  • @sig3952
    @sig3952 6 років тому +95

    Excellent sir... I didnt know this from 3 years... I lost 3 jobs in 1 mark and i never attempted this questions.... Thank u soo much sir

  • @sumitpatel4574
    @sumitpatel4574 2 роки тому +1

    This is really hidden TREASURE.....
    I WAS FINDING THIS VERY MUCH DIFFICULT EARLIER

  • @DeepaKumari-si7jx
    @DeepaKumari-si7jx 3 роки тому

    sir ye trick meine kahi nahi dekhi and literally ye bahut acha trick hai jaldi se ans. nikalne kaa thankyou so much

  • @arjungusain7698
    @arjungusain7698 6 років тому +1

    It's working ... Very helpful

  • @shanavassalam8956
    @shanavassalam8956 6 років тому +8

    10 men can do a piece of work in 12 days, then 6 men with half efficiency can do 3/5th of the work in how many days?
    Sir can u expline above question

  • @ayyappanm8021
    @ayyappanm8021 6 років тому

    this model is make rust to me.... but now it's solve clearly .... tq jii

  • @sevasingh9369
    @sevasingh9369 6 років тому +11

    Sir I have a doubt in last line where u write 25/8+9+8/12 where from this last 8 come ist 8 from the multiple of cross 2×4 than 9 from3×3 but 4×4 becomes 16 than where from this 8 come I think it should be 16 can u explain me sir plz

  • @hemantyadav9692
    @hemantyadav9692 4 роки тому +18

    Sir mujhe aapki ek chhej aachi lgi ki aap questions English me putup krte ho or smjhte hindhi me ho that's grand 💯

  • @cmishra391
    @cmishra391 3 роки тому +5

    A can do 1/3 of a work in 5 days and B can do 2/5 of the work in 10 days. In how many days both A and B together can do the work. Please discuss these type questions with trick. 👍

    • @AGV_Prints
      @AGV_Prints 3 роки тому

      bro do you have PGCET tommorow or what .????

    • @manishgupta1692
      @manishgupta1692 3 роки тому

      A in 15day
      B in 25day LCM 75 efficiencies are 5 and 3
      75÷8 days

    • @utkarsh200
      @utkarsh200 2 роки тому +3

      Total work= efficiency X time
      For A: 1/3= eff. X 5days
      Eff of A= 1/15
      For B: 2/5= eff. X 10days
      Eff. Of B= 1/25
      A and B together= 1/15+1/25= 8/75
      Time is inversely proportional to efficiency so , they take 75/8 days to complete the work together.

    • @mouven9945
      @mouven9945 2 роки тому

      Question 4 in ua-cam.com/video/y7bR6hIfM1M/v-deo.html

  • @amrapaliahiwale4549
    @amrapaliahiwale4549 Рік тому

    Very nice sir. Aapke saath padhkar bahut acha laga.

  • @nandinijaiswal1246
    @nandinijaiswal1246 4 роки тому

    Bahut badhiya......sir...maths k aur v quiz ISI Tarah se btaiye🙏🏻🙏🏻🙏🏻🙏🏻🙏🏻

  • @vijayasreepanchikarla9627
    @vijayasreepanchikarla9627 5 років тому +1

    Excellent techniques

  • @khushboopandya9744
    @khushboopandya9744 6 років тому +1

    Thank you sir.....its very easy trick to solve it

  • @soumyaranjanrout1042
    @soumyaranjanrout1042 3 роки тому

    Sir superb technique hai 🙏🙏

  • @SSCKunallll_001
    @SSCKunallll_001 4 роки тому

    Bhai....tumne na ....mera ish chapter ka only problem tha ye questions, usse slove kiya , sabaas

  • @nehasupakar4573
    @nehasupakar4573 3 роки тому +1

    Thank u so much sirrrr....👌👌👌👌👌👍mera problem solve ho gyaaa,

  • @SikandarKhan-rk9wi
    @SikandarKhan-rk9wi 5 років тому +2

    Sir Apka Aik Jawab,,, Lajawab.

  • @adilbatt8009
    @adilbatt8009 5 років тому

    Sir how is it possible
    If we reduce the no. of labourer in 2nd case then it will take more days to done the work..means it will take more than 25 days to do the same...

    • @MemesMafia007
      @MemesMafia007 5 років тому

      Bhai question thiek sai phad lai kya keh raha hai

  • @ahamadxaveel1383
    @ahamadxaveel1383 5 років тому +1

    well done job i salute u

  • @simarpreetsaluja3176
    @simarpreetsaluja3176 Рік тому

    Nice trick sir plz make video on efficiency based question of time and work

  • @ayeshakhatoon1129
    @ayeshakhatoon1129 3 роки тому

    Sir tha k u so much...math is just like nightmare for me...but after ur teaching technics its vry easy for me to solve ths question ...thank u so much

  • @ishtasinghal5362
    @ishtasinghal5362 3 роки тому

    Excellent... Really nice tricks ..

  • @b_0_5_s7
    @b_0_5_s7 Рік тому

    Sir plz upload videos on time and work who leaves first sums sir

  • @keerthankrishna9269
    @keerthankrishna9269 3 роки тому

    Thanks for creating new problem

  • @KuldeepSingh-rj4wj
    @KuldeepSingh-rj4wj 5 років тому

    Aapna meri time and work ki problem door ki bhaut bhaut thanks

  • @yoonkongb
    @yoonkongb 3 роки тому

    Sir i can't solve this question using the same method that you've used,please help...
    1) If 1 man or 2 women or 3 boys can complete
    a piece ofworkin 88 days, then 1 man, 1 women
    and 1 boy together will complete it in how many days.???

  • @sumitshah1814
    @sumitshah1814 6 років тому

    bhut accchaa h ye trick sirrr....Mst

  • @rubuyabyang1420
    @rubuyabyang1420 6 років тому +1

    Very simple... appreciate it

  • @sanchayeedebnathrollno3816
    @sanchayeedebnathrollno3816 6 років тому

    bas yehi trick aap ka acha laga n hope kaam aayega thank u sir.

  • @If_you_hvae_noticed
    @If_you_hvae_noticed 6 років тому +3

    It was great,Got the technique finally... thanks

  • @gudduchugwani1954
    @gudduchugwani1954 4 роки тому +1

    Amazing and thank u sir.

  • @GAMERNO.420
    @GAMERNO.420 5 років тому

    Thankyou sir simple interest with simple method

  • @roshansah958
    @roshansah958 6 років тому +1

    X, Y, Z can finish a piece of work in 20 ,30, and 40 days respectively. If X left the work after working for 5 days, in how many days can Y and Z together complete the remaining work ?

    • @DR-kc2vh
      @DR-kc2vh 6 років тому +1

      Roshan Sah ans is 47 1/4 or 47.5 days

    • @rupeshraj7423
      @rupeshraj7423 6 років тому +2

      Correct ans is 55/7 days

    • @DR-kc2vh
      @DR-kc2vh 6 років тому +1

      Rupesh Raj how???🤔

    • @rupeshraj7423
      @rupeshraj7423 6 років тому +4

      Take lcm of 20 30 and 40 =120 which gives total number of works. So x can complete 6 units work in 1 day ,y can complete 4 units work in 1 day and z can do 3 units a day. Together they can do 13 units work a day.after working 5 days together they complete 65 units work .when x left work after 5 days,
      Remaining work is 120-65=55units and y and z can do 7 units per day together so they can complete remaining work in55 /7 days.

    • @Funfactpro_f16
      @Funfactpro_f16 6 років тому +1

      55/7 is ans

  • @faby_makeupartist1205
    @faby_makeupartist1205 5 років тому +1

    Yo sir you are the best 💯💪💪💪 thanks for this formulae

  • @beingnavn5532
    @beingnavn5532 5 років тому

    Very Good Trick... 👍👍👍

  • @ajitbehera4357
    @ajitbehera4357 3 роки тому +1

    It's is the most concept.thank u so much sir

  • @musiclovers9386
    @musiclovers9386 5 років тому +12

    Finally the lcm of men or women or boys is the ans. Of question do you notice this

  • @luckymine5214
    @luckymine5214 6 років тому +1

    Easy to understand....well explain👏👏👏👏👏

  • @dineshhans191
    @dineshhans191 5 років тому +4

    I have seen a lot of vids but u just taught simply....osm sir great

  • @srinathjohn2075
    @srinathjohn2075 4 роки тому

    Trick is fantastic...thanqu

  • @abineetsharma877
    @abineetsharma877 2 роки тому

    Sanjeev can build a wall in 20 days and
    Parveen can demolish the same wall in 30 days. If they work
    on alternate days with Sanjeev starting the job on the 1st day,
    then in how many days will the wall be built for the first time

    • @itssupriyahere
      @itssupriyahere 2 роки тому

      S +20 +3
      60
      P -30 -2
      --------
      1
      In 2 days 1 unit is done
      In 120 days 60 units will be done
      Is this the correct answer?

    • @mouven9945
      @mouven9945 2 роки тому

      Productivity = Work / Time
      S = W/20
      P = - W/30
      let's say sanjeev worked for 'x' days, Parveen worked for 'y' days
      S * x + P * y = W
      we need to find x+y
      W/20 * x - W/30 * y = W
      x/2 - y/3 = 10
      3x - 2y = 60
      since we need to find two variables, but we have only one equation : we should go for trial and error.
      let's say they worked for equal number of days ( x==y)
      3x - 2x = 60 … so 'x' & 'y' are close to 60
      ok. let's try x=60, y=60 and check whether LHS = RHS
      LHS = 3x - 2y
      = 3*60 - 2 *60
      = 60
      = RHS
      so, x=60, y=60 are correct
      answer is x+y = 120 days.
      for more explanation, checkout the playlist
      ua-cam.com/video/k7I_KvoM0gE/v-deo.html

  • @santhanakumari2487
    @santhanakumari2487 3 роки тому

    Excellent sir 👌 very nice and tricks ....thank u sir ..

  • @salestenanithiyasalestenan9285
    @salestenanithiyasalestenan9285 3 роки тому

    super short cut thank you very much

  • @vinayakkolakar1304
    @vinayakkolakar1304 5 років тому +3

    Excelent sir ...thank u

  • @prashantimagoudanavar7506
    @prashantimagoudanavar7506 6 років тому +2

    A,B and C can do a piece of work in 20,30 & 60 days respectively.in how many days can A do the work if he is assisted by B and C on every third day?

  • @yeasminnilufa5536
    @yeasminnilufa5536 4 місяці тому

    This trick r relly helpful ❤❤❤❤❤

  • @bhandariajay2002
    @bhandariajay2002 4 роки тому

    Sir ye bhot easy trick sikhayi aapne thanku aapka❤️

  • @soyabahasan3999
    @soyabahasan3999 6 років тому +1

    From your first example if I twist the question to
    "If 20 men or 24 women or 40 boys can do a job in 12 days , how many men working with 6 women and 2 boys can complete the work in 32 days? What is the trick or solution?

    • @jahidhasan3860
      @jahidhasan3860 6 років тому

      I also need this question's solution

    • @jaat5302
      @jaat5302 5 років тому +1

      You have to apply the same trick for this question also.
      Just put x where you need number of man and put this equation = 32 , and solve it.
      Your answer will be 1.5 man.

  • @vinaymor6497
    @vinaymor6497 4 роки тому +1

    Sir very good formula

  • @ruchithakur5117
    @ruchithakur5117 3 роки тому

    Excellent trick 👌👌

  • @sanchayeedebnathrollno3816
    @sanchayeedebnathrollno3816 6 років тому

    sir ji i m sorry but agar 58 and 1/3% agar A n B banda work finish kare in 7 days jabki B is 40% more efficient than A then iss type ka faster tricks specially for qty 1 and qty 2 comparison tricks ho to pllz bataiye sir.

  • @amreshnayak7981
    @amreshnayak7981 5 років тому

    Wow...very good trick

  • @cutejarru9929
    @cutejarru9929 6 років тому

    What is the largest six digits number which when divided by 3,8,10 &15 leaves the remainder 1,6,8&13 respectively. Please sir , explain as soon as possible with trick its urgen.

  • @kpbhowmik3446
    @kpbhowmik3446 5 років тому +3

    Best video ever thank you sir . Make some more for the poor students living in village areas🙏

  • @Peace_Of_Garden
    @Peace_Of_Garden 5 років тому

    Concept are very good sir

  • @SantoshBachhavSir
    @SantoshBachhavSir 3 роки тому

    nice method.. Thank you sir

  • @nadnad5891
    @nadnad5891 6 років тому +1

    Sir. The question is 2 men 3 boys can do a piece of work in 10days while 3 men 2 boys can do same work in 8 days. In how many days can 2 men and 1 boy do work?

  • @ladakhitribalboy
    @ladakhitribalboy 6 років тому +1

    Thanks alot sir awesome God bless you

  • @manjumanju-tf2rj
    @manjumanju-tf2rj 5 років тому +1

    hi sir how it will take 8+9+8

  • @thedremersdiary2865
    @thedremersdiary2865 6 років тому +1

    Thank you so much sir.........

  • @battingmaster4623
    @battingmaster4623 3 роки тому +1

    Nice sir!!!!!

  • @anilraju3468
    @anilraju3468 5 років тому +2

    3*4 how it can be 8 bro can u plz explain,,,in 3 table how many times 12 goes = 4 like diz 4+3+2=9

  • @Jesuslovesyou.7808
    @Jesuslovesyou.7808 6 років тому +2

    Sir how you calculated 8+9+8.
    Please tell me

    • @sunainapandey6624
      @sunainapandey6624 5 років тому

      Me too I didn't get it

    • @sunainapandey6624
      @sunainapandey6624 5 років тому

      Where from 898 Cam??

    • @shyamchauhan6765
      @shyamchauhan6765 5 років тому

      Take LCM

    • @wills2618
      @wills2618 5 років тому

      Check the table of biggest number to take Lcm i.e 6
      12 comes in table of 3,4,6 so lcm 12
      2*4=8
      3*3=9
      4*2=8
      By multiplying numerators

  • @mrnadir9106
    @mrnadir9106 6 років тому +3

    Thank you sooooo much

  • @ShivaKumar-yl4ne
    @ShivaKumar-yl4ne 6 років тому +1

    Wow , amazing, sir,nice, explanation.sir

  • @mahimabajaj3675
    @mahimabajaj3675 4 роки тому +4

    acc to the ques,
    3M = 4W = 6B (as all can do the work in 25 days)
    2M + 3W + 4B =?
    let's convert this whole equation into women
    then
    3M = 4W
    Multiplying by 2 and dividing by 3 on both the sides
    2M = 8/3 W
    now let's take out the value of 4B
    6B = 4W
    multiplying by 2 and dividing by 3
    4B = 8/3 W
    putting the values in the equation
    2M + 3W+ 4B
    8/3W + 3W + 8/3 W
    25/3W
    now.
    4W X 25days = 25/3 W X ?days
    = 12days

    • @itsnotvenus
      @itsnotvenus 3 роки тому

      Thank you so much. I was looking for the logic and got this! thank youuuu

  • @sachinakumar0987
    @sachinakumar0987 3 роки тому

    Q)8men or 10women or 10children were earn Rs1024. In how many days 6men or 5women and 4children will earn Rs768?🙏🏼🙏🏼🙏🏼🙏🏼🙏🏼Sir Plzz answer this question.❤️❤️its my kind request.I have asked many but none can answer.
    ANSWER: 2

  • @maderakeshrakesh3534
    @maderakeshrakesh3534 2 роки тому

    Thank you sir,thank you so much

  • @banamalidoley6231
    @banamalidoley6231 6 років тому

    A and B undertake to do a piece of work for Rs.600. A alone can do it-in 6 days while B alone can do it in 8 days. With the help of C, they finish it in 3 days. Find the share of each.

    • @ravinderrs2552
      @ravinderrs2552 2 роки тому

      Eff(A)=8, Eff(B)=6. Total work=48
      Let Eff(C)=x
      work done by (A+B+C) in 3 days=Total work
      => (8+6+x)3=48
      42+3x=48
      3x=6
      x=2
      Eff(C)=2
      Share will be Distributed acc to Eff.
      Share of C=(600/8+6+2)2=Rs 75

  • @sathaninkah2928
    @sathaninkah2928 Рік тому

    Excellent 👍👍👍👍👍👍

  • @the_wanderer2099
    @the_wanderer2099 2 роки тому

    Thank You Sir.

  • @swarnalatasahoo4226
    @swarnalatasahoo4226 6 років тому

    2 men and 3 women can finish a piece of work in 10 days,while 4.men can do it in 10 days.in how many days will finish it in.

  • @hemlatakaushik8713
    @hemlatakaushik8713 6 років тому

    wow.... Sir Kiya trick h....
    thank you so much sir......

  • @premanandabehera6837
    @premanandabehera6837 6 років тому

    Excellent...sir.......

  • @asharafkhatana3121
    @asharafkhatana3121 3 роки тому

    Sir acha padhato ho smj ate ha thankyou sir

  • @priyankatomar7541
    @priyankatomar7541 5 років тому

    Does it work in very type of men women children ques??

  • @akashgaurav9068
    @akashgaurav9068 4 роки тому

    Very good trick .. brother

  • @vijaykumarsinghvijaykumar5629
    @vijaykumarsinghvijaykumar5629 6 років тому

    you are fantastic sir

  • @RavinderKumar-we9io
    @RavinderKumar-we9io 5 років тому +1

    Tell us only trick ..which vll save time

  • @johnykamei8118
    @johnykamei8118 6 років тому

    Sir..i dont get 2+3+4
    3+4+6=8+9+8 this point not understndng..??? Pliz explain sir..tq.

  • @Okaxis-d2v
    @Okaxis-d2v 6 років тому

    Mast trick sir.... Thnq so much

  • @sherazsabri5355
    @sherazsabri5355 6 років тому

    It takes Ali 30 minutes to mark a paper. Aslam only needs 25 minutes to mark
    a paper. If they both start marking papers at 10:00 AM, at what time they will
    finish marking at the same time?

  • @pankajmallik5427
    @pankajmallik5427 6 років тому

    awesome sir...you made it simple

  • @musiclovers9386
    @musiclovers9386 5 років тому

    भाइयो जरा गौर से देखो की जो शुरू में जो बन्दे or वाले हैं उनका lcm ही उत्तर आ रहा है ।।। that's the amazing trick...😊😊😊

  • @s.aishwarya5952
    @s.aishwarya5952 6 років тому

    Super idea bro... Congrats

  • @RajeshKumar-th8ej
    @RajeshKumar-th8ej 6 років тому

    Very nice sir thanks

  • @soumyaranjanrout1042
    @soumyaranjanrout1042 3 роки тому

    Kamal kardiye🔥🔥🔥👑👑👑

  • @pangisrinivas1217
    @pangisrinivas1217 5 років тому

    excellent job sir

  • @samibehera3651
    @samibehera3651 6 років тому +3

    wow simple method thanks sir

  • @ashutoshpatel2478
    @ashutoshpatel2478 6 років тому +1

    Thank you very much sir its super trick for this type questions

  • @Ashokpatel-iq3ee
    @Ashokpatel-iq3ee 5 років тому

    Your are god of tricks

    • @Smartstudyforcareer
      @Smartstudyforcareer  5 років тому

      No friend. I'm a math teacher. You can say Math Tricks Teacher.

  • @gulshanverma1281
    @gulshanverma1281 5 років тому +1

    Thanks for best trick....

  • @Pradeepgourfitness
    @Pradeepgourfitness 4 роки тому

    Bahut saandar sir ji

  • @athirachinju1997
    @athirachinju1997 Рік тому

    Thank you...👍

  • @jasbirsingh7760
    @jasbirsingh7760 3 роки тому

    Great sir..

  • @pankajinimallick7759
    @pankajinimallick7759 5 років тому +1

    A can do a work in 15 days and B in 30 days. If they work on it together, then in how many days will they be able to do 50%of the work

    • @defence2403
      @defence2403 5 років тому

      5days

    • @ssr2014
      @ssr2014 4 роки тому

      @@defence2403 how ?

    • @defence2403
      @defence2403 4 роки тому

      @@ssr2014 total work 30
      Both efficiency 3
      Half work do in 15/3=5days

  • @poojithahegde6057
    @poojithahegde6057 6 років тому +2

    A and B working separately can do a piece of work in 9 and 12 days respectively, If they work for a day alternately, A beginning, in how many days, the work will be completed?