END MID Vu (N) = 55,536 27,768 f = 0.60 0.60 Vu/f (N) 92,560.0 46,280.0 Vc (N) = 109,919.8 109,919.8 Vs (N) = Tidak perlu sengkang Tidak perlu sengkang No of tied = 2 2 S (mm) = S-min S-min Used Stirrups : D10 - 250 D10 - 250 Diameter = 10 10 Jarak = 250 250
Itu temen saya yang pasang nya
shear conector & baja nya apakah nnti di cor? pekerjaan nya selnjutnya apa ya ? apakah seperitu saja. lalu di finishing facade?
hallo kak ijin bertanya, untuk perhitungan share conectornya seperti apa ya kak?
terimakasih.
END MID
Vu (N) = 55,536 27,768
f = 0.60 0.60
Vu/f (N) 92,560.0 46,280.0
Vc (N) = 109,919.8 109,919.8
Vs (N) = Tidak perlu sengkang Tidak perlu sengkang
No of tied = 2 2
S (mm) = S-min S-min
Used Stirrups : D10 - 250 D10 - 250
Diameter = 10 10
Jarak = 250 250