SETTING OUT - How to use a Total Station "Survey" program. Step by step guide on surveying.

Поділитися
Вставка
  • Опубліковано 17 січ 2025

КОМЕНТАРІ • 32

  • @mukisajoshua2026
    @mukisajoshua2026 8 місяців тому +1

    So educative.

  • @negotiummeum9643
    @negotiummeum9643 3 роки тому +2

    ha ha I remember a few years back was doing slab survey using rotating laser with staff (or sometimes just a measure tape) and manually putting data on A2 size drawing ... comparing to this method I was like a dinosaur LOL
    Thanks for the upload!

    • @SITENG
      @SITENG  3 роки тому +1

      Hi Negotium! Yeah it's all changing fast, even TS06 becomes a dinosaur's tool now 😊 If you set a robotic one it will do all survey for you as per nice set grid etc. Whatever it is I really love TS06 as you can really do everything with it😁

  • @rasalih9200
    @rasalih9200 2 роки тому +1

    Thank you so much for your effort engineer!

    • @SITENG
      @SITENG  2 роки тому

      My pleasure! Happy to have you here in our community 👍👍

  • @manimumin7972
    @manimumin7972 4 роки тому +1

    Wow this is amazing

    • @SITENG
      @SITENG  4 роки тому

      Thank you Mani :)

  • @onearder2887
    @onearder2887 2 роки тому +2

    Hi can please tell me can you do levelling with doing face left and face right of the points. Many thanks

    • @SITENG
      @SITENG  2 роки тому

      Hi! Not really sure what do you mean by that. Once your resection is ready you can use EDM for levels (providing your control targets have set height)

    • @iyceintegrated9062
      @iyceintegrated9062 11 місяців тому

      How do you get the height of Instrument

  • @onearder2887
    @onearder2887 3 роки тому +1

    I didn't knew you Can level only on one face. Thanks

    • @SITENG
      @SITENG  3 роки тому +1

      Hi One Arder! I always using one face. Sometimes for resection I am using both faces to reduce the error, but 99% I use 1 face :)

  • @sergisergi8497
    @sergisergi8497 4 роки тому +2

    Hi !! Can you please show us how will look all the points that did you take the masures in Autocad? And is not clear how to check verticality of the pillars! Thanks!!

    • @SITENG
      @SITENG  4 роки тому +2

      Sergi, I will soon start site videos so I'll show this.
      The easiest way to check verticality is to 'shoot' the bottom and top, your co-ords should be the same, when using ref. line your offset should be the same.

  • @TheMrasimqureshi
    @TheMrasimqureshi 3 роки тому +2

    Another fine video. I was not clear about in which job did you record all the survey measurement of the floor. Did you created another job or was it included in the same job. You said previously that your method saves the memory of the instrument with this method. Please define it.

    • @SITENG
      @SITENG  3 роки тому

      Hi Asim! When doing a survey I always open a new job so when I am taking it from edm there is no mess :)

  • @fesocanman
    @fesocanman 3 роки тому +3

    Hi, Please is it possible you train someone how to use the Total Station, I already had a degree in Civil Engineering, but am struggling to get work experience. I am based in Essex, so travelling to London shouldn't be an issue for me. I will be eagerly waiting for your response. Thanks

    • @SITENG
      @SITENG  3 роки тому +2

      Hi fesocan! Keep looking for junior engineer/ assistant engineer job and you will learn the quickest way after watching my videos about setting out of course😊 I am outside UK now and will be back in few weeks. Unfortunately can't promise anything as I will be probably too busy, but working on a course for all you guys 😁

    • @fesocanman
      @fesocanman 3 роки тому +1

      @@SITENG Thanks for your quick response. It's just been a bit challenging to getting a job without experience. I hope to get something sooner

    • @SITENG
      @SITENG  3 роки тому +1

      All the best!!! If I know something I'll let you know 😁

    • @fesocanman
      @fesocanman 3 роки тому +1

      @@SITENG Thanks

  • @DanielZergaw
    @DanielZergaw Рік тому +1

    Survey setting out

    • @SITENG
      @SITENG  Рік тому

      survey program, setting out

  • @andreirafaila3604
    @andreirafaila3604 3 роки тому +1

    Interesting videos. You should do this for a living mate!(see you on site)

    • @SITENG
      @SITENG  3 роки тому

      HAHA! That's the plan ;) see you!

  • @ruijackson7697
    @ruijackson7697 4 роки тому +1

    Approximately what is your salary? please share as this is a big question for those entering the field.

    • @SITENG
      @SITENG  4 роки тому

      Hi Rui! I will do a video soon about the salary for engineers :)

    • @ruijackson7697
      @ruijackson7697 4 роки тому +1

      @@SITENG and also what are your working hours

    • @SITENG
      @SITENG  4 роки тому

      Hi Rui! It's typically 10h a day (8-6), I will do the video soon :)

  • @Myway1920-sj
    @Myway1920-sj 3 роки тому +1

    Hai sir i am from kerala iam a surveyor i just started a company but i fail due to with out a totalstation. My family contition is very poor i cant buy a totalstation due to money is my problm i request you to give me a old total station for working my company
    Its my request sir pls save my life

    • @SITENG
      @SITENG  3 роки тому +1

      Sorry, but I don't have any old station to help you. You don't need one to find a job though. All the best with your company!