How to "De Stressing" of Long Welded Rail using Supper Puller

Поділитися
Вставка
  • Опубліковано 15 вер 2024
  • This is the process of "De-Stressing" of Long Welded Rail on Track. After Laying of long welded Rail as 260 meter and it converted in LWR by Flash Butt Welding. After that its long welded rail as 2500mtr. or 3000 mtr. long rail on track How to de-stress to free of lucked up stresses.
    Here, We have used many of Indian Railway Standard, Specification, Manual, QAP and OEM advised to complete the de stressing work. Mobile Flash Butt Welding Machine, Supper Puller and Inspection instruments and many more accessories are used.

КОМЕНТАРІ • 2