Transient Stability Using ETAP 18 Lesson (10) for Power System Engineering Courses

Поділитися
Вставка
  • Опубліковано 13 гру 2024

КОМЕНТАРІ • 37

  • @EngrAhmedMahdy
    @EngrAhmedMahdy  3 роки тому +1

    🌟 Access 100+ courses, 1,600+ videos, and 300+ hours of professional lessons!
    Master electrical engineering, renewable energy, and much more with Khadija Academy Student Membership. Learn real-world skills through expertly designed courses on topics like:
    ✅ Solar Energy, Electrical Design, MATLAB Simulink, Power Electronics, Wind Energy, Wave Energy, and more!
    🔗 Explore it all here: www.khadijaacademy.com/p/khadija-academy-student-membership
    💡 Your future starts here-click to join now!

  • @mohd.azeemkhan8308
    @mohd.azeemkhan8308 2 роки тому +1

    اسلام عليكم ورحمة الله وبركاته يا سيدي
    How are you sir
    I hope you will be good
    Sir I'm a big fan of you really you are good instructor.
    I always watch your videos based on etap.
    Sir i have a doubt regarding coordination of relays how to do that.
    Andy if we have a large network with large number of relays so how to do coordinate it.

    • @EngrAhmedMahdy
      @EngrAhmedMahdy  2 роки тому +1

      Hey Azeem,
      In the future, I will add more videos about ETAP including relay coordination. I am currently busy with my master's thesis. That's why I haven't made this lesson yet.

  • @wongsabarchannel1335
    @wongsabarchannel1335 Рік тому

    For Swing Gen is it can shown di Rotor Angle?

  • @arunm4175
    @arunm4175 3 роки тому

    Good teaching...thanyou so much

  • @engrmuhammadsamiullah6010
    @engrmuhammadsamiullah6010 4 роки тому

    Please tell me about the capacitive and inductive rating of SVC

  • @wongsabarchannel1335
    @wongsabarchannel1335 2 роки тому

    Hi.. why i can not plot syn generator rotor angle?

  • @donnyharmaizi7610
    @donnyharmaizi7610 4 роки тому

    Sir, how simulation stability transient load shedding with UFR?

  • @engrluqmanhafeez4049
    @engrluqmanhafeez4049 4 роки тому

    Dear sir A good teacher can inspire hope, ignite the imagination, and instill a love of learning.And you done it sir for us.Its our bad luck that we can not be a part of Your course due to some reasons but i personally appreciate your efforts .Allah Give you more.and Allah help us to become that part of Your Course in Future.Hope so Thank u sir

    • @EngrAhmedMahdy
      @EngrAhmedMahdy  4 роки тому +2

      Thank you Engineer Luqman for your kind words, I really appreciate this, don't worry this would be a free course on UA-cam.

  • @MücahitCihan-j9u
    @MücahitCihan-j9u Рік тому

    Thank u so much sir!

  • @vishnuchandran243
    @vishnuchandran243 4 роки тому

    sir, how to find the derivative of a bus voltage angle in etap, pls reply!!

  • @SaminHosanAnik
    @SaminHosanAnik 3 роки тому

    Sir. In generator, MW rate changing but inertia WR^2 value not changed. In inertia, RPM 1500 Always fixed here.

  • @maas2825
    @maas2825 2 роки тому

    Hi AHMED , How can I get or install etap. Is that free program or need to make account. Thank you in advance

    • @maas2825
      @maas2825 2 роки тому

      @@EngrAhmedMahdy Thank you so much

  • @مازنصلاح-ر1ل
    @مازنصلاح-ر1ل 2 роки тому

    Can i ask what about wind turbine generator in the transiant stability i have a massge bob up says wind turbine generator model is none at t = 0.000 sec can you help me

    • @EngrAhmedMahdy
      @EngrAhmedMahdy  2 роки тому

      You mean this error?
      ua-cam.com/video/w_Kvy0IPmRA/v-deo.html

    • @مازنصلاح-ر1ل
      @مازنصلاح-ر1ل 2 роки тому

      @@EngrAhmedMahdy yes thanks very very much it was very helpful

  • @abdussemiiabuali3585
    @abdussemiiabuali3585 2 роки тому

    Thank you very much for the video.
    But, I couldn't run the power flow. The error encountered was "Calculation process terminated abnormally exit code C0000135.
    Kindly help please!

    • @EngrAhmedMahdy
      @EngrAhmedMahdy  2 роки тому

      I would like you to try something, I believe that I have encountred this error long time ago. Try applying the crack again to Etap program.

  • @abdulazizal-barrak4525
    @abdulazizal-barrak4525 2 роки тому

    هل ممكن تقديم دورة باللغة العربية حسب الطلب ؟

    • @EngrAhmedMahdy
      @EngrAhmedMahdy  2 роки тому

      اتمنى يا اخي ولكن صعب بسبب ضيق الوقت
      المحتوى باللغة الانجليزية للوصول الى اكبر عدد ممكن من الناس

  • @Mehrab_Mjn
    @Mehrab_Mjn 8 місяців тому

    That is great.
    but one mistake that you have : secent transformer is 12.5MVA but you put 125MVA

    • @EngrAhmedMahdy
      @EngrAhmedMahdy  8 місяців тому

      Thank you! I wish ETAP says "Hey you can't do that "😂How are you using a 125MVA transformer for a 10MW generator :)

  • @NaveenP-h5p
    @NaveenP-h5p Рік тому

    good

  • @sanghitadas6844
    @sanghitadas6844 3 роки тому

    Sir, make more videos👏👌

  • @mohamedsaied3572
    @mohamedsaied3572 4 роки тому

    Hi, I am facing problem when trying to run TS for my network this message appeares "TS calculation aborted due to excessive equivalent cable length at t=0.000 sec" Please i need a support Thanks...

    • @egramrt6812
      @egramrt6812 3 роки тому

      i faced the same issue do u know what is the exact problem????

  • @kiriellelilas
    @kiriellelilas 4 роки тому

    I have this error while running the study : calculation process terminated abnormally- exit code 9. And i don't know how to solve it can you please help me solve it?

    • @asmaanasser7394
      @asmaanasser7394 3 роки тому

      Open the project file and drag the OTI file directly to ETAP

  • @raimonbawazir5449
    @raimonbawazir5449 3 роки тому

    thank you for this video. I have a problem with my system. I need some help. can I have your email?