East West Line Closure Day 3 - KHI C151 Trains joins the show + Paya Lebar bound trains!

Поділитися
Вставка
  • Опубліковано 1 лют 2025

КОМЕНТАРІ • 11

  • @TimothyMokCJ
    @TimothyMokCJ Місяць тому

    13:57 I actually want to tompang off service train to Eunos but during peak hour.
    I was NOT there in the first place. I was at Bedok and Tampines.
    On 24 and 31 December 2024, there is NO alternate train trips to Yishun and Jurong East from Marina South Pier. It is ALL trips from Jurong East to Marina South Pier.

  • @ZhaoZimingPl
    @ZhaoZimingPl Місяць тому

    It's a good thing that a LVDT KSFA has been used for the testing of the newly installed tracks! This is especially so that the LVDT sensor is able to scan the NEWLY INSTALLED Third Rail without any defects, allowing the new section of the Third Rail to be compatible with the existing LVDT sensor which has been equipped on the train in 2013.

  • @ZhaoZimingPl
    @ZhaoZimingPl Місяць тому

    19:49 Test train 533/534 spotted again in the video!

  • @Youz46plays
    @Youz46plays Місяць тому

    There is also the brochure about the train disruption that I got for free and it is available in english, Chinese, malay and tamil languages

  • @TheRexLowGamingDev
    @TheRexLowGamingDev Місяць тому +1

    UPDATE: SERVICES RESUMES ON 10 DEC 2024!

  • @ivideotrain
    @ivideotrain Місяць тому

    15:35 SIR

  • @christopheryongmenglee7569
    @christopheryongmenglee7569 Місяць тому

    What is C151 doing EWL

  • @AmmartubeLOL
    @AmmartubeLOL Місяць тому

    I though smrt took the c151 down why is it here