Zip system is great, and I like the fact that you're going to liquid flash the nail holes. The product doesn't make sense for my spec builds, but I'd like to try it for my personal build.
The framing crew enjoyed working with the Zip system. It was a breeze to install. The cost makes it tough for a lot of people to justify. Hopefully Huber can work on better distribution to drive costs down.
Anything can be done when you have a group of guys dedicated and responsible like we see here. Great job !.
That’s for sure. Thanks 👍🏽
Zip system is great, and I like the fact that you're going to liquid flash the nail holes.
The product doesn't make sense for my spec builds, but I'd like to try it for my personal build.
The framing crew enjoyed working with the Zip system. It was a breeze to install. The cost makes it tough for a lot of people to justify. Hopefully Huber can work on better distribution to drive costs down.
I'm doing the same to my remodel and addition (stucco over zip). How does the foam adhere to the sheathing in this case?
I believe I emailed you in this topic. I hope the info helped.
Oh boy that’s a lot of work filing them nail holes
Luckily it’s only for the addition portion of the home. It will probably take an extra four hours.
Pretty sure that’s Kefier on that call
Mr0143329 hahaha you guessed right