You left openings in the ribs for water to drain down the keel, but it looks like the box you built at the aft end for the sump pump is sealed, How is the water going to drain into it?
I used the heavy duty construction adhesive, same stuff i used in the last video to glue down the last cedar strip piece. it has a waterproof rating! definitely nice to have the floor in that's for sure!
That is a contour Guage. I'm learning as I may need to replace a floor in the near future.
oh right! that's what it's called, it worked really well!
Good decision on the floor sealer! I used exterior paint on my first project with good results
thanks, just glad i found it on the clearance self! 🙂 otherwise exterior paint was a thought i had as well.
You are getting there!
Yes sir! it feelings good, i can see the end in sight! 👍
Should use cardboard to make a template of your final size then transfer to your plywood. Measure many time cut once.
was planning on that method until i realized how much cardboard i would need 😂
You left openings in the ribs for water to drain down the keel, but it looks like the box you built at the aft end for the sump pump is sealed, How is the water going to drain into it?
I did drill two holes on either side for water to drain through 😎
How was your lunch? Also you have quite the cricket problem over there.
that was my pet cricket, he hides under the truck in the heat of the day
Luke, what kind of adhesive and caulk were you using? Sure is nice to see it come together!
I used the heavy duty construction adhesive, same stuff i used in the last video to glue down the last cedar strip piece. it has a waterproof rating! definitely nice to have the floor in that's for sure!