Class II Standpipe Hose Connections: Inspection, Testing, and Maintenance

Поділитися
Вставка
  • Опубліковано 29 лис 2024

КОМЕНТАРІ • 12

  • @afs424
    @afs424 Рік тому +1

    Everyone do yourself a favor first remove the cap and install one with a petcock / 1/4” drain valve… perform your open-closing test, then drain off the pressure remove the drain cap perform your visual inspection … reinstall original cap
    perform your visual inspection then replace with the

  • @eduardoysla
    @eduardoysla 3 роки тому +2

    Haha, 5:40... "have your spanner wrench handy" .... really shows how tight these things are.

  • @oneandonlydk2
    @oneandonlydk2 2 роки тому +2

    Very good video/demo. Well said on all points. But how DARE you do this in a suit!! haha.

  • @Chenjiangtao
    @Chenjiangtao 3 роки тому

    Can I assume that we do not need any floor drain nearby?

  • @x2eXu50x
    @x2eXu50x Рік тому

    That was the Class I. What about the annual for the class II?

  • @themechanic4222
    @themechanic4222 8 місяців тому

    Class 1 only fire department 2-1/2 size
    Class2 for occupants 1-1/2 size
    Class3 can be use by fire department and occupants

  • @safeinsound432
    @safeinsound432 Рік тому +1

    Get a testing rig, the cap is under pressure now.

  • @mumtazawan1421
    @mumtazawan1421 2 роки тому

    Regards

  • @BeardedBotanist
    @BeardedBotanist Рік тому

    Fancy uniform 😅