Our Metricon Zita 25 - Lock Up Stage

Поділитися
Вставка
  • Опубліковано 6 січ 2025

КОМЕНТАРІ •

  • @bradleypayne543
    @bradleypayne543 Рік тому

    looking good! im building a zita 27 in healesville

    • @drivingwithmissdaisy3127
      @drivingwithmissdaisy3127  Рік тому

      Hi Bradley thanks for watching our video - we are nearly finished with our build. I got to go inside last Saturday and have an update on the inside or our Zita 25. I'll will post soon.

    • @JeraldBravo
      @JeraldBravo 7 місяців тому

      Hi @bradleypayne543, we are also gonna build a zita 27 soon. How was it? Can't find any display homes for zita 27 here in Melbourne.

    • @bradleypayne543
      @bradleypayne543 7 місяців тому

      @@JeraldBravo the build process was a lot longer than we thought overall pretty good a lot of defects after handover. Metricon have been pretty good and fixing them. there is no display for the Z 27 but The ala 27 is the exact same floor plan and there is a display home in Truganina I believe

    • @JeraldBravo
      @JeraldBravo 7 місяців тому

      Thanks so much for the info! All the best!

  • @jeanvonbarberode2377
    @jeanvonbarberode2377 Рік тому

    I am not sure, but if I would be in the age of those people I would go for single level home, because of the stairs. Also single level is cheaper and easy to repair and not so many construction faults.

    • @drivingwithmissdaisy3127
      @drivingwithmissdaisy3127  Рік тому

      Yeah thanks for your comment Jean - we are in our 60's and yes we have thought about the future and moving around the house. Our block of land forced us to build a house with a small footprint. To pass our planning permit we had to make room for a sewerage treatment plant and water disposal - that took up half the block which didn't leave much for the house - hence the two storey. We love the place so far and the stairs are not a hassle.