I have seen how to do post tension specially in this balance cantilever bridge construction but you have not explained in this video and also where this balance cantilever bridge span is complete from both sides and also from the other side also how to complete the joint between the two spans when the span is complete.
Exactly what I'm looking for! Thanks you guys for making this fantastic video :)
this method i tried before. for concreting right and left side takes 10-15 days. Thank you. CCAA Production
Thanks sir
I have seen how to do post tension specially in this balance cantilever bridge construction but you have not explained in this video and also where this balance cantilever bridge span is complete from both sides and also from the other side also how to complete the joint between the two spans when the span is complete.
thanks boo
Thanks for watching
Awesome..
Thanks sir
pls tell name of backgroup music
Sorry, I don't sure.
good
ขอบคุณครับ
Regret no detailed post tension working procedures demonstrated.
Thank you for your comments, I will trial.