19/10/2019 KTM Kluang

Поділитися
Вставка
  • Опубліковано 5 сер 2024
  • The loop siding and other sidings are now gone; in their place is the new elevated bridge under construction. The old loco shed sidings have been temporarily reconstructed to park track machinery.
    0:00 Southern Shuttle 41
    1:32 Rakyat Timuran Express 27
    3:28 Southern Shuttle 40
  • Авто та транспорт

КОМЕНТАРІ • 41

  • @deghihderaman3572
    @deghihderaman3572 3 роки тому

    Lama dah tak naik Keretapi. Last naik tahun 2009.

  • @anthonychan272
    @anthonychan272 4 роки тому +1

    When I was little, I always used to take the train from kluang to Sentral paloh (this station had been dismantled long time ago)when visiting my grandmother, the railway is just right beside my grandmother house, I always like to sit beside the window to watch the train passing by whenever I heard the train sound. I like the old diesel locomotives and truck and it is very hard to catch it now as the frequency of train is reduced much more compared to the pass. I believe it will be lesser chance to ride and catch this type of old diesel locomotive train once the ets project in Johor is commissioned.

  • @nurulharlina5322
    @nurulharlina5322 4 роки тому +1

    5 tahun berkeja di stesen kluang sebagai p.a terbaik shoot video 👍👍 bkl tgl kenang tk lme lagi..

  • @amarancrewz955
    @amarancrewz955 4 роки тому +3

    Terbaik bro nice shooting memang favourite loco class 25 sejak kecik. Bunyi enjin edm mantapppp

  • @didinfriends7826
    @didinfriends7826 4 роки тому +3

    Lama tunggu video baru kereta api dr saudara daniel..tq 😊

  • @azizahosman1244
    @azizahosman1244 4 роки тому +1

    Kali terakhir saya ke kluang pada tahun 1980 kerana pergi kerumah pakcik disana

  • @hamiltonastan
    @hamiltonastan 4 роки тому +3

    it's glad that you are back in Kluang! i can see the railway flyover being constructed in this video. fyi, there will be another railway flyover to be built in Segamat since both Segamat and Kluang will be elevated in this southern region's double-tracking project. you can meet up with your trainspotting buddy who came up to Gurun earlier in Segamat and see both trains and the construction activities.

    • @mafiaboy87
      @mafiaboy87 4 роки тому

      Yong De Tan in fact, the next station south, Renggam, will also be elevated. The viaduct at Kluang is 2.8km long while the one at renggam is close to 2km

    • @hamiltonastan
      @hamiltonastan 4 роки тому

      @@mafiaboy87 how long will the segamat railway flyover be?

    • @mafiaboy87
      @mafiaboy87 4 роки тому

      Yong De Tan can’t say. Not in my sector.

    • @mafiaboy87
      @mafiaboy87 4 роки тому

      Yong De Tan found out for you: there are actually two in segamat. One 4km and the other 2km

  • @abdulhalimmossmohsmaad6936
    @abdulhalimmossmohsmaad6936 4 роки тому +4

    Oh my kluang ...

  • @SamsulBahri-tz1sh
    @SamsulBahri-tz1sh 4 роки тому

    Kluang Rail Coffee, tempat saya selalu singgah minum petang - petang

  • @kingfitrah93game
    @kingfitrah93game 4 роки тому +1

    Nice Terbaik boss

  • @muhammadammaranuar
    @muhammadammaranuar 4 роки тому +3

    Nampaknya awak lagi laju dari Usain Bolt berlari ke lintasan rata :P

  • @mohdshahril1265
    @mohdshahril1265 4 роки тому +1

    Ade brp stesen jejambat di johor?..

  • @kimhokitarot
    @kimhokitarot 4 роки тому

    verry nice looking Daniel,,, new friends

  • @fauzanbriliantv5157
    @fauzanbriliantv5157 4 роки тому

    Bro ade sape"yg tau tk kalau dari KTM kluang ni boleh sampai kL ke tak k husus area jb jer?? Yg tau please bagi impo🙏saye dari yong peng nk kL tapi x tau nk naik trasnport ape

    • @HBC101TVStudios
      @HBC101TVStudios 2 роки тому

      Kena tukar tren kat Gemas bro kalau nak gi KL.
      Kalau ke JB ada train direct.

  • @afiziazhan8560
    @afiziazhan8560 4 роки тому +2

    Bayangkn min dh lm xdatang tgk ii dah ada jalan atas sebelah rail

    • @aimang.1361
      @aimang.1361 4 роки тому

      Itu dah terbengkalai. Sbb katanya yg BN nak buat dulu tu, bila PH menang, diorg cancel. Apa ntah nama projek tu.

    • @nightmaremangle3597
      @nightmaremangle3597 4 роки тому +1

      Aiman G. bukan bodoh itu edtp tengah buat

  • @azmilpride
    @azmilpride 4 роки тому

    Terbaik bro

  • @Amirul4488
    @Amirul4488 4 роки тому

    i like it

  • @naveenrachagan9720
    @naveenrachagan9720 4 роки тому

    I bet that flyover at 5.03 will be demolished and replaced with an underpass, right?

  • @fuckhgjjjjjggfgggfffj
    @fuckhgjjjjjggfgggfffj 4 роки тому +1

    Malaysia punya kereta bagus...tapi yg model lama gini kok kyal Kotor banget ya body nya

  • @prasetyoutm9202
    @prasetyoutm9202 4 роки тому +1

    This line still use the token ? capture the moment before it's gone, good video 👍🏼

    • @DanielQihuaiNg
      @DanielQihuaiNg  4 роки тому

      The token system was replaced with the Relay Automatic Block system in 1995. Now only the East Coast Line uses the token system.

    • @prasetyoutm9202
      @prasetyoutm9202 4 роки тому

      Thank for your information, another time i want to meet you for the hunting trains at the east coast line hehe

  • @nightmaremangle3597
    @nightmaremangle3597 4 роки тому +1

    buruk nya keretapi

  • @mochsobari6273
    @mochsobari6273 4 роки тому

    Made in indon PT inka

    • @DanielQihuaiNg
      @DanielQihuaiNg  4 роки тому +2

      No. Only the power generator cars on the Shuttles are made by PT INKA. Most of the coaches were made by Hyundai and others. Please don't claim everything. 🙂