I have a Project Checklist built in Microsoft Lists, can I export the List as a master copy through "Export to BI" option to a specific location so I can load it into another project channel as it own "new" list? Currently when we try to copy the Project Checklist from one channell to another, its the same original copy as its built through the Sharepoint platform.
Book a FREE Fabric consultation here 👉 Https://www.valto.co.uk/UA-cam
I have a Project Checklist built in Microsoft Lists, can I export the List as a master copy through "Export to BI" option to a specific location so I can load it into another project channel as it own "new" list? Currently when we try to copy the Project Checklist from one channell to another, its the same original copy as its built through the Sharepoint platform.
This sounds possible 👍