El Diablo (Looping Dragon)

Поділитися
Вставка
  • Опубліковано 30 вер 2024
  • This is the All new spiraling coaster that debuts in the late of Spring 2015 at Six Flags Great Adventure. I took this video today at the park. April 6th-2015. The ride is still under construction. The track is is about 3/4 the way complete as you can see in the video. It's being built next to the El Toro roller coaster in the park.

КОМЕНТАРІ • 2

  • @zeppone4045
    @zeppone4045  9 років тому

    They couldn't start building this during the winter because of the freezing temps. Can't pour concrete during freezing temps, so they had to wait till weather warmed up.

  • @dizzybone2000
    @dizzybone2000 9 років тому

    lol were they sleeping the whole winter? I feel like this could be built in less than 2 weeks honestly.