El Diablo (Looping Dragon)
Вставка
- Опубліковано 30 вер 2024
- This is the All new spiraling coaster that debuts in the late of Spring 2015 at Six Flags Great Adventure. I took this video today at the park. April 6th-2015. The ride is still under construction. The track is is about 3/4 the way complete as you can see in the video. It's being built next to the El Toro roller coaster in the park.
They couldn't start building this during the winter because of the freezing temps. Can't pour concrete during freezing temps, so they had to wait till weather warmed up.
lol were they sleeping the whole winter? I feel like this could be built in less than 2 weeks honestly.