The Mumbai-Pune expressway is a 6 (8) lane wide controlled-access highway that is not a part of the National Highway system in India. It was fully operationalized in 2002 and introduced new levels of speed and safety in automobile transportation in India. This current expansion comprising of two twin tunnels and cable-stayed bridges aims to bypass hairpin turns present in the Khandala Ghat (mountain pass) and reduce travel distance and provide a more straighter route. This tunneling work carried out through controlled blasting method looks stunning. And as always Droneman videos are spectacular !!!!
@@mr.koolkarni4357they are already disturbed. There is no going back now. I strongly believe that after 200 years, mankind will be living on a filthy planet which will not have clean water or air.
@polyglot8946 Outer Road consteuction is easier on a relatively flat land. Mumbai-Pune is a challenging project because of elevation difference of about 600 metres between both cities. Also an expressway connecting two major cities is far more useful and important than an ORR that leads to nowhere. So your comment is very irrelevant and illogical
@polyglot8946 OOR is straight??? U High on pot? How the heck a RING ROAD is straight. I think you meant that Hyderabad OOR is wider than MPE?? If yes, then remember that MPE is built on western ghats so making it wider would 1. Cost more and by more I mean a lot more, probably hundreds of millions if not billions of dollars. 2. Uneven terrain would delay to projects by a lot, as not halting the traffic yet continuing the construction would be nearly impossible.
Great Job Droneman, for providing the info on traffic management as it was looking a bit confusing. Also at the end of the video you divided the project in 5 parts and explained the completion of each, please do this for every video if possible. And as always awesome views :)
Droneman Bhai, This is one of the Best Videos by you till date this far... Let alone make video...flying a drone over this stretch of road is itself a challenge....fantastic work ! Loved the part inisde the tunnel...cant wait to drive on it.
Brother honestly speaking where is Indian Audience your channel deserve More Subscriber as well as view the way you showed these project is just beautiful I am very happy by seeing these infra project progress
Kudos for your team to update this information They can achieve target on time ... As rainy season is about to complete and govt has sanctions a lot of funds as well
Excellent Coverage! Very Good that you got access to cover both the tunnels and viaduct! March 2024 or September 2024 ? I don't think it will be possible. My opinion is that it will be completed March 2025. Thanks Sir 🎉
The good thing about your videos are - they are not only shot well, but nicely presented with great details about the project. Now I always look up to your channel for an update on some crucial projects... Do cover about the bullet train project if possible.
You deserve more than just a like. Making these type of videos requires a lot of patience and money. Moreover very few people take intrest in such valid subjects.
My two concerns with this project: - Runaway vehicle acting as a projectile bomb in downward direction (Mumbai bound) in case of brake failure - Being gassed to death in upward direction (Pune bound) in case of a jam! The project has a 9 km long tunnel (see video). In upward direction heavy vehicles will by revving high on low/medium gear, one can imagine the extent of emission. Hope ventilation is adequate
88 KM is 55 miles. At average speed of 60 MPH or 100 KPH, for example in the US, this would take about one hour. Why does it still take 2 hours to go from Mumbai to Pune??
Good update... Few things that I noticed and would like to comment being a regular traveller on this road. There is considerable amount of traffic increased on this road in last 6 to 7 years. Daily jams is an issue due to heavy vehicles not following lane discipline. New road must be strictly restricted to LMVs and heavy vehicles should be sent via existing ghat road. If heavy vehicles are allowed on missing link, they will create same nonsense traffic and will lead to congestion... Ultimately, no use of having new road. The progress is too slow as compared to other roads. I know the terrain very well but there has been considerable delay...
Khandala ghat was a part of nostalgia if you're 90's or early 00's Yeah I know this ghat also creates traffic jam and accident After the tunnel It will reduce time and traffic jam but honestly we won't see any hill view, waterfalls and khandala ghat anymore Still I will prefer to travel in khandala ghat if there is a another diversion for ghat
@@dronemanYT also if possible please also make detailed video on sabarmati bullet train station.. that how it will join bullet train station , metro station , standard railway station. ( Sabarmati bullet train station is ready )
Cinematic looks awesome sir
it's not recorded by him. he had taken it away from another video
@@tausifhussain5459 you are dumb or what 😂😂
His channel name literally is drone man
You are real infra news creator because you visit actual places 👏👏👏
The Mumbai-Pune expressway is a 6 (8) lane wide controlled-access highway that is not a part of the National Highway system in India. It was fully operationalized in 2002 and introduced new levels of speed and safety in automobile transportation in India. This current expansion comprising of two twin tunnels and cable-stayed bridges aims to bypass hairpin turns present in the Khandala Ghat (mountain pass) and reduce travel distance and provide a more straighter route. This tunneling work carried out through controlled blasting method looks stunning. And as always Droneman videos are spectacular !!!!
I just hope it doesn't disturb the flora and fauna.
@@mr.koolkarni4357they are already disturbed. There is no going back now. I strongly believe that after 200 years, mankind will be living on a filthy planet which will not have clean water or air.
Used to watch it taking shape every week...... Very helpful for Mumbai-Pune travelers..... Thanks for the great views....
I'm amazed how wide the tunnels are. 🇮🇳
Yes sir ,but , mumbai underground metro 3
Mumbai coastal road
Mumbai trand hourbour will be game Changer for Mumbai ,and Mumbai economy
@@sumitshukla1 Yes, I can't wait to see a video on the Trans harbour link when it is completed.🇮🇳
Oo bhai your best video until today🤘🤘Droneman OP, Government OP🔥🔥
13km straight 8 lane road.......it's like a micro autobahn for Mumbai-Pune
@polyglot89461350kms delhi Mumbai expressway …300 plus operational
@polyglot8946 Toh hum kya kare?
@polyglot8946Hyderabad ORR is not straight. ORR can't be straight, supposed to encircle the city.
@polyglot8946 Outer Road consteuction is easier on a relatively flat land. Mumbai-Pune is a challenging project because of elevation difference of about 600 metres between both cities.
Also an expressway connecting two major cities is far more useful and important than an ORR that leads to nowhere.
So your comment is very irrelevant and illogical
@polyglot8946 OOR is straight??? U High on pot? How the heck a RING ROAD is straight. I think you meant that Hyderabad OOR is wider than MPE?? If yes, then remember that MPE is built on western ghats so making it wider would
1. Cost more and by more I mean a lot more, probably hundreds of millions if not billions of dollars.
2. Uneven terrain would delay to projects by a lot, as not halting the traffic yet continuing the construction would be nearly impossible.
Great Job Droneman, for providing the info on traffic management as it was looking a bit confusing. Also at the end of the video you divided the project in 5 parts and explained the completion of each, please do this for every video if possible.
And as always awesome views :)
okay,, will do that for other videos too
@@dronemanYTtarget date kya hai full project complete hone ka
The intro was amazing, it easily competes with lot of movie grades drone shots. Kudos to the team
Glad you liked it!
Thank you Droneman for providing regular updates on this critical expressway.
Just awesome update. Didn't expect this video to come up so soon for the missing link project. More power to you Drone man 💪🏻😊😊
Thank You Dada 😃
I am so proud that I am one of them who build is beautiful project
Looks like the speed of work of project's in Maharashtra is getting faster.
Your filming 📽️ talents is very impressive ❤
Thank you so much!!
Eye-popping coverage
Superb incredible breathtaking
Thank you Sir
Keep up the good 👍 work
My pleasure
Droneman Bhai, This is one of the Best Videos by you till date this far... Let alone make video...flying a drone over this stretch of road is itself a challenge....fantastic work ! Loved the part inisde the tunnel...cant wait to drive on it.
Thanks a ton
Brother honestly speaking
where is Indian Audience your channel deserve More Subscriber as well as view
the way you showed these project is just beautiful I am very happy by seeing these infra project progress
So nice of you
Awesome video. Looks like it will open next summer
Hope so!
Kudos for your team to update this information
They can achieve target on time ...
As rainy season is about to complete and govt has sanctions a lot of funds as well
Coastal road par video laao sir apka progress update bahut jbbrdst rhta hai❤
koshis jaari hai
Excellent coverage, deserves appreciation for the hard work done by your team.
Thanks a ton
Always interesting to see infra thru drones...
And amazing research done by u
I am from khopoli and this is going to be very helpful for people travelling lonavala and pune
This is a masterpiece 👏
Beautiful scenery and great engineering work. Thanks for the drone view video..
Glad you enjoyed it
Bhai kafi acchi experience hai ap ka behad umda dron shot. Beautiful pictures and good videos
Best update ever. Modi ji is moving at the speed of light covering the infrastructure gap created by incompetent governments in the last 60-70 years.
pune is very beautiful😊
Really great videos like ur other videos..Thank you for giving all the informative updates 😊👍🙏
My pleasure 😊
खूप सुंदर व्हिडीओ....👍👍❤❤
धन्यवाद 🤓
Proud to be an indian 🇮🇳
Can you imagine. The landscape in whole of china is like this and infra there 😳
The drone shots are amazing ❤
Thank you 🙌
Honored to be the Team Leader of Authority Engineer of this prestigious project.🙏😎
Thanks a lot Droneman for all your efforts to show progress with such a detailing.. Hats off
So nice of you
My favorite project❤
Very nice
Samruddhi mahamarg update too
will update soon
Awesome
thanks bhai
Hats off to ur good work … keep it up
Thanks a lot
Nice work most needed project
You are right
Very nice information and well shoot.
Excellent Coverage!
Very Good that you got access to cover both the tunnels and viaduct!
March 2024 or September 2024 ?
I don't think it will be possible.
My opinion is that it will be completed March 2025.
Thanks Sir 🎉
I think dec 2024 is attainable . Only RHS tunnelling might take time and cable stayed bridge will take a year more max.
Hats off to your efforts!🫡
🤓
The good thing about your videos are - they are not only shot well, but nicely presented with great details about the project. Now I always look up to your channel for an update on some crucial projects... Do cover about the bullet train project if possible.
Bhai, please make updated video on kambatki ghat tunnel and satara kagal laning work.
stunning!! reminded me of some elevated bridges in Italy.
Vow, superb video dear Droneman. Fantastic work.
This is an important projevt for ensuring seemless connectivity for Pune-Mumbai connectivity.
You deserve more than just a like. Making these type of videos requires a lot of patience and money. Moreover very few people take intrest in such valid subjects.
I appreciate that!
Delhi Mumbai expressway godhra to dahod section
Appreciate your hard work
Great Job, .. Can you details of the ventilation in the tunnels..
Will discuss this on our next update
thank u so much for this type of video such a great job 🙏 ❤
Thankyou so much for bringing this video.. and that opening view at 00:10 is just amazing😍
Great content as always.
👍👍
Thanks 😃
Cover railway projects also..👍
Amazing visuals of the tunnel. Cant wait to drive through. Thanks for these amazing videos and updates.
Glad you like them!
Beautiful Maharashtra 😍
Yes 😊
super crisp !
Thank you 😋 Dada
Very nice information 👌
Excellent video. Thank you!
Glad you enjoyed it!
Excellent coverage. Keep updating us on a quarterly basis of possible
Presentation quality is better now.
thanks
Excellent. Very informative. Good job. Keep it up❤
Maharashtra is India No.1 state
Very nice and informative VDO.
Salute for your hard work.
sanjay PUNE
Thanks a lot
Beautiful views with video capture video,
All details fully explain❤
Thanks a lot 😊
Nice update! Very commendable job of going there and taking these videos. Nice work !!
Glad you enjoyed it!
Wow....
MPML...MPE..chirle extension...MTHL...sewree worli connector....
...impact is going to be huge...
I see a lot of work behind every video ! Great work man.
More to come!
More updates pls....6 months is too long for such pretty scenery
Excellent coverage and update. Thank you. Please keep sending.
More to come!
Bohot hi sundar 😲💥👌💪👍🚩🇮🇳🎉🙏
My two concerns with this project:
- Runaway vehicle acting as a projectile bomb in downward direction (Mumbai bound) in case of brake failure
- Being gassed to death in upward direction (Pune bound) in case of a jam! The project has a 9 km long tunnel (see video). In upward direction heavy vehicles will by revving high on low/medium gear, one can imagine the extent of emission. Hope ventilation is adequate
Important point, authorities must take a note.
I feel missing like will allow LMV only.
88 KM is 55 miles. At average speed of 60 MPH or 100 KPH, for example in the US, this would take about one hour. Why does it still take 2 hours to go from Mumbai to Pune??
This is wonderful piece of work Droneman. 3 Cheers !!!
Thank you! Cheers!
Nicely Covered drone man, I Live near to this road from Khalapur Till Naka, thank you...
Glad you liked it
Good work. Your videos are a delight to watch
Thank you very much!
Bro your background music is just nuts
Where do you get it from?
NUTS matlab ,,, accha ya bura ? 🤓
@@dronemanYT bhot achha
Good update... Few things that I noticed and would like to comment being a regular traveller on this road.
There is considerable amount of traffic increased on this road in last 6 to 7 years. Daily jams is an issue due to heavy vehicles not following lane discipline. New road must be strictly restricted to LMVs and heavy vehicles should be sent via existing ghat road. If heavy vehicles are allowed on missing link, they will create same nonsense traffic and will lead to congestion... Ultimately, no use of having new road.
The progress is too slow as compared to other roads. I know the terrain very well but there has been considerable delay...
GREAT VIDEOS BY YOU 🙏
Thank you 🙌
missing link wasn't carried out back then due to lack of technology and capability to execute
truly the nation is progressing
Droneman Bhai Kalyan to ahmadnagar rail project ke bare Mai bato na
Okay,, plan karta hu
@@dronemanYT thik hai
....plz update on chirle to mumbai pune expressway extension ......
Samruddhi ka update kya hai sir , bhiwandi se ghtoti tak ka... Ueka ek video banao
5:58 nice shot brother 😍😍
Coastal road Mumbai dikhavo....plz ❤❤
You r the best drone man
I appreciate 🙏🙏🙏
Very nice informative video sir. Please make similar video on Mumbai Goa highway and remaining part of Samrudhhi Highway. Thanks.
Nice drone shots
Thanks 👍
Excellent video presentation. Thanks for the update.
Thanks for watching!
Khandala ghat was a part of nostalgia if you're 90's or early 00's
Yeah I know this ghat also creates traffic jam and accident
After the tunnel It will reduce time and traffic jam but honestly we won't see any hill view, waterfalls and khandala ghat anymore
Still I will prefer to travel in khandala ghat if there is a another diversion for ghat
Great job sir 👌
But i requested ki ahmednagar beed parli vaijnath new railway line ke progress per ek video banao please
खूप छान माहिती देताय, सर😊
Wow for videography, even it completed Dec 24 is fine, but work quality must be best as taking a lot of amount
Your videos are simply spectacular 🎉
Thank you so much 😀
Thanks for informing about missing link High way
ফাটাফাটি হয়েছে।
ধন্যবাদ দাদা 🙂
Awesome camera work😮better than some production houses.
Thanks! 😃
It's all happening because of BJP, thanx to MODI ji and Nitin Gadkari for this development.❤️💫
Dholera Ahmedabad expressway video please
will visit soon
@@dronemanYT also if possible please also make detailed video on sabarmati bullet train station.. that how it will join bullet train station , metro station , standard railway station. ( Sabarmati bullet train station is ready )