The bots at headquarters were doing way better than the ones falling apart at the stores! They had them set with random movements all day at the stores with no cool down period like they were designed for.
I’ve been introducing my little sister to the Chuck E Cheese animatronics and the Rock-afire Explosion. She’s not scared of any of them, and she actually really likes them! This is one of the videos I’m going to show her, along with a playlist I made for her.
Its a shame Chuck E Cheeses is getting rid of them. I went to Chuck E Chuck for the first time since I was a little kid and I watched the show almost the whole time while I was there. Ill admit when I first got there the size of the animatronics was a bit off putting and I can see why I was terrified of them when I was little. My Chuck E Cheese unfortunately has a Cu1 stage so I didnt get the full experience , but all the bots seemd to be running well, but they all had some minor wear and tear. Chuck E Cheese is really missing out on an opportunity to make money. They need to atleast keep them throughout 2024 because when the FNaF movie comes out many people are going to want to see animatronics in real life, but unfortunately they are gonna probably all be gone by October at most.
maybe kids would actually like the animatronics if they were all in this good of shape the 2 stage bots are also probably more creepy than anything to kids tho.
they also have a mini model of a Circles of Light stage, formerly used to program the lights on it, now because of the Navori changeover and the fact Studio C-based systems can't play the signals, COL stages have an auto-light feature
@@kyliechavis182 this video was filmed at CEC Entertainment's headquarters in Irving, Texas. The Entertainment Department has a programming studio that features a 3-Stage (on a single stage to save space) and a Studio C Alpha (only Chuck E.'s stage, also to save space). There is also a mini model of a Circle of Light stage that was used to program the lights for that stage until last year when the Navori system was introduced, making all Studio C SD and HD-based stages non-functional (Studio C SD and HD run on special file formats and Navori is unable to play them). There is no Cyberamic stage as there is no space for one, as well as Corporate's programming Cyberamic show having been removed in 1999 when they were at their old headquarter's to make room for office space. To make up for the absence of a programming Cyberamic show, 3-Stage character signals are translated to the Cyberamic characters by way of the CEC Stage Rosetta.
No, according to most people. After most of the animatronics are removed from the stores, these will be preserved and won’t be destroyed. Also in case you’re wondering, Dept. 18 is located in Irving, Texas
They removed their Pizzacam, his programming used to be done at the Wilmington, North Carolina location I believe, but then that closed, so Pizzacam's programming was reassigned to the Laurel, Maryland location, but then their air compressor exploded and now only Chuck E. functions, and I believe the Huntsville, Alabama location currently serves for Pizzacam's programming. Long Story Short, Pizzacam was removed and Huntsville Alabama programs him now.
No when they moved I guess they never took stage size into consideration and for space they there away pizza cam and munch Jr because they can still program them since they have less movements.
Where did department 18s stage come from originally? Was it at a store? And how do they keep it in such good shape? Where do they get the replacement parts from? I’m sure half of the CEI parts they used for the rock afire were made specifically for CEI
Liam J mbta and rail fan You don’t need them to physically lay signals for them. They’re only 3-6 movements each. You can easily program them blindly, which is what’s done.
Top 3 Best 3 Stages
3. Department 18
2. Charolette, North Carolina
1. Huntsville, Alabama
department 18 is literally corp, it should be at the top.
What about Raleigh nc? There in pretty good shape too
huntsville is now gone 😢
It’s so cute how Helen waves at the end!
Yeah
jasper totally didn’t do that too-
@@SimplyBetterDouchebag ok
@@SimplyBetterDouchebag ok
@CEO_Of_Weenie_Hut_Jrs. ok
Looks like pasqually is really playing
Edit : OMG! Helen is waving bye bye!
Jasper: am i a joke to you?
Everyone is forgetting jasper lol
0:00 helen: i love it here chuck e. here: a literal office
I love Mitzified Helen ❤
Note that Moon and Building aren't Programmed in this version.
Usually, Building, and Moon appear during the first chorus and the Children's Part.
They are programmed, at this video they were disabled due to some air leaks
I love this stage !!
The bots at headquarters were doing way better than the ones falling apart at the stores! They had them set with random movements all day at the stores with no cool down period like they were designed for.
That's what mine has. I just discovered another CEC in my erea that has a 3-stage.
Awesome! Is it still their??
@@The_Original_Alex_Channel right!! I would love to know
@@mrscott6602 they are still there
@@RuinsOfHistoryYT real life? That's cool
I’ve been introducing my little sister to the Chuck E Cheese animatronics and the Rock-afire Explosion. She’s not scared of any of them, and she actually really likes them! This is one of the videos I’m going to show her,
along with a playlist I made for her.
Aww thats cute!
I also really like them
Whos her favorite
Its a shame Chuck E Cheeses is getting rid of them. I went to Chuck E Chuck for the first time since I was a little kid and I watched the show almost the whole time while I was there. Ill admit when I first got there the size of the animatronics was a bit off putting and I can see why I was terrified of them when I was little. My Chuck E Cheese unfortunately has a Cu1 stage so I didnt get the full experience , but all the bots seemd to be running well, but they all had some minor wear and tear. Chuck E Cheese is really missing out on an opportunity to make money. They need to atleast keep them throughout 2024 because when the FNaF movie comes out many people are going to want to see animatronics in real life, but unfortunately they are gonna probably all be gone by October at most.
Do you realize how rare the cu 1 stage is lol
maybe kids would actually like the animatronics if they were all in this good of shape the 2 stage bots are also probably more creepy than anything to kids tho.
They think they are ALL boring and/or creepy
Kylie Chavis shut the fuck up
@@NaturallyInspire it’s a sad but painful truth. Compared to kids these things are HUGE. Not to mention that they are broken
@@NaturallyInspire Oh my god..:"0
idk why studio c even exist it’s trash we would have lots of 3 stages in all state’s the three stage is one of the rarest stages
Best 3-Stage ever
Hi munch
*No way* Wilmington NC is the best!
I been there. They still got their munch jr. lol
tho Wilmington mechanically isn’t in as good of shape
tho i guess if were being technically its a really good cu1 stabe
This is awesome!
Idk but 3 stage bots with rockstar clothes might actually look good especially in good condition
I went there on spring break
Is this 3 stage EVER going to play songs again sometime?
LOVE CHUCK E'S PLACE
SUE!
It’s you sue!
I just noticed something a little up with Jasper, throughout the whole video his eyes become cross-eyed. Had that glitch always been there?
Its meant to on 3 stages because jasper is using beach bears mech from when it used to be showbiz pizza place
Awesome video I love dept 18 I wish I could go and visit
Just go visit your local Chuck E. Cheese with a 3 stage
@@funecheeseofficial3576 my local isn't a 3-Stage lol
I said the closest location with s 3 stage to you
@@funecheeseofficial3576 lol I wish but we only got 2 3-Stage in New Orleans and baton rouge, I rather go see corp stage
Oh
When did they remove the prop characters?
Moon and building
They still have them, but they were disabled for repairs when this was filmed.
Along with that, they are programmed separately from the main characters due to lack of space.
@@bagofgroceries same with pizzacam? Or is he programmed in stores?
He’s programmed blindly.
Well soon as they get new mask its going look weird maybe
Film Chuck E.'s Place 2004.
Jay Ringel Demand whatever the video isn’t.
I doubt Department 18 will even allow that to be played for guests nowadays.
This is actually Balls Michigan
Are the characters actually concept unification animatronics that used to be the rock-a-fire explosion?
Yes
@@CECFlorida also another thing, these were the animatronics used in the chuck e cheese 3 stage diagnostic video?
Did anyone see chuck has shoes
And I hope in a Chuck E. Cheese they have that some day
I’m worried about these
This Is Actually Used For UA-cam Videos On The Chuck E Cheese UA-cam Channel
and programing
@@Ethans_trains_and_CECOhio_Ent True dat
Dep.18 looks a protype of the cu 1 stage
Dept.18. Only place with a fully functioning, best condition animatronics.
Exactly! If only mechanics everywhere were like that
ikr
Pineville
AM I A JOKE TO YOU
@@chrishaushalter6983 yea except for pasqually's arms at pineville (they don't move at all)
Chuck e cheese 🎉
2:53 it’s so cute
Cool!
Dept 18 has 2 stages a 3 stage and a studio c alpha
What I didn’t know they them
they also have a mini model of a Circles of Light stage, formerly used to program the lights on it, now because of the Navori changeover and the fact Studio C-based systems can't play the signals, COL stages have an auto-light feature
What about the Studio C?
It’s across from the 3 stage
@@ceclife wait what
@@kyliechavis182 this video was filmed at CEC Entertainment's headquarters in Irving, Texas. The Entertainment Department has a programming studio that features a 3-Stage (on a single stage to save space) and a Studio C Alpha (only Chuck E.'s stage, also to save space). There is also a mini model of a Circle of Light stage that was used to program the lights for that stage until last year when the Navori system was introduced, making all Studio C SD and HD-based stages non-functional (Studio C SD and HD run on special file formats and Navori is unable to play them). There is no Cyberamic stage as there is no space for one, as well as Corporate's programming Cyberamic show having been removed in 1999 when they were at their old headquarter's to make room for office space. To make up for the absence of a programming Cyberamic show, 3-Stage character signals are translated to the Cyberamic characters by way of the CEC Stage Rosetta.
0:29 oh no jasper lost his hat
The best condition I've seen these animatronics in recent years
Is this stage still out there? Or the dep 18 got 2.0?
its gone...
@@THAIIIGUYno its not 💀
@@noobethgamingtonthethird they stopped programming the animatronics so the stage would be trash according to corporate
No, according to most people. After most of the animatronics are removed from the stores, these will be preserved and won’t be destroyed. Also in case you’re wondering, Dept. 18 is located in Irving, Texas
@@THAIIIGUYit's not in a public place so it's still there
Wow I they are in just as good of condition as when they were rae animatronics!
The Original Alex Channel I wish they had the latex masks on them
Mechai the racer 25 yeah that would be pretty cool
Captain Quirk what! Where!?
Captain Quirk but what happened to chuck e and Munch latex molds doesn’t Aaron have them too?
Captain Quirk and what about the mr.building and munch.jr where are they?
I hope they make that a real stage
It is a real stage
from the 90s
Location?
Department 18
@@harryfoley2294 it's really called the Entertainment Department. They haven't called themselves Department 18 in years
If all shows looked like this animatronics wouldn't be scary
That is true! Kids would just get used to it and eventually like them!
It’s why people loved showbiz so much!
They never did look scary, even if they were put in a dark / scary state of view they still wouldn’t be creepy
☆ *Wow!* ☆
Did they use to have munch jr and pizza cam
I have a munch jr air cylinder
Yes But They Were Removed
@@colamations5066 they're still there, in this video they were disabled for repairs, check "Watoosi Jenkins" videos for see them!
I think is a 1 in a half 3 stage
Question: Did they have Pizza Cam?
They do they just keep him turned off to save power
They removed their Pizzacam, his programming used to be done at the Wilmington, North Carolina location I believe, but then that closed, so Pizzacam's programming was reassigned to the Laurel, Maryland location, but then their air compressor exploded and now only Chuck E. functions, and I believe the Huntsville, Alabama location currently serves for Pizzacam's programming. Long Story Short, Pizzacam was removed and Huntsville Alabama programs him now.
@Brennan Wahler Oh my mistake.
No when they moved I guess they never took stage size into consideration and for space they there away pizza cam and munch Jr because they can still program them since they have less movements.
Where did department 18s stage come from originally? Was it at a store? And how do they keep it in such good shape? Where do they get the replacement parts from? I’m sure half of the CEI parts they used for the rock afire were made specifically for CEI
It was a brand new show
I think since it's at the actually cec offices they can always afford to keep them in good condition.
don't know how they took care of pizza cams mask
@@showbizpizzainternational245personally I thought they were from Dallas Montfort, but that makes more sense
Dose the dept. 18 have a Chuck E. Cheese 2 stage
Late, they actually convert the 3 stage movements into cyberamic movements.
Nice
Coolio
how can we plan a visit
You need to be invited
@@weridmix2137 how can we be invited
@@angelawatts2176 not sure
"Oh, Chuck E, I just love it here! All the kids, the *gays* , the fun!"
The pizza!
#CEC_Blender
🐭🐭🐭 me gustaaaaaaaaaaaaaaaaaaaaaaaaa
Ami iguaaaaaaal
Helen henny is my favorite
Do locations with with moon,building,pizzacam and munch jr program them themselves
Nope. Still are programmed in house.
@@bagofgroceries then were are they?in the back?
Liam J mbta and rail fan You don’t need them to physically lay signals for them. They’re only 3-6 movements each. You can easily program them blindly, which is what’s done.
@@CECFlorida bro imagine being the absolute chad who just blindly programs perfect lip sync into a pizzacam
this is more a CU 1-stage but with 3 stage props
Yes. It used to be a three stage but they moved into a new location with not as much space
First
What city is this located at?
Irving, Texas. Sorry if you have already found out by now, but it you didn't, here it is.
There is one in my area I has a studio c cappa
0:27 my favorite part