🚆 2024 November Update: Jurong Regional Line - Progress from Corporation to Bahar & Gek Poh 🚆

Поділитися
Вставка
  • Опубліковано 11 гру 2024

КОМЕНТАРІ • 12

  • @Unteroffizier
    @Unteroffizier 6 днів тому +2

    From 3:02 the overhead rail tracks is quite low. I worry in future if some construction heavy duty vehicle never retract the crane or hoist will sure bang into the structure, then the engineers have to evaluate the integrity of the whole structure, lots of safety lapses and factors not taken into consideration when constructing the JRL.

    • @DavidTay-wi7wv
      @DavidTay-wi7wv 6 днів тому

      Always got some blur sotongs driving on the road

    • @mikekoh1399
      @mikekoh1399  6 днів тому

      Wow you are very observance

    • @mikekoh1399
      @mikekoh1399  6 днів тому

      Let me take a look as well

    • @yangshuozhang4447
      @yangshuozhang4447 4 дні тому +1

      There should be some height limit barriers installed before the tracks.

  • @Unteroffizier
    @Unteroffizier 6 днів тому +1

    From 2:20 see from middle left of screen an F-16 fighter jet fly by. Might be F-15.

  • @priscillaong2315
    @priscillaong2315 6 днів тому

    Outside

  • @priscillaong2315
    @priscillaong2315 7 днів тому

    Traffic

  • @priscillaong2315
    @priscillaong2315 7 днів тому

    Train

  • @priscillaong2315
    @priscillaong2315 7 днів тому

    Car

  • @priscillaong2315
    @priscillaong2315 7 днів тому

    Lorry