CE 540 Module 9.1 Tieback overview

Поділитися
Вставка
  • Опубліковано 22 січ 2025

КОМЕНТАРІ • 4

  • @mattclinton5351
    @mattclinton5351 3 роки тому +2

    Really great content, Prof Kitch. Thanks

  • @MageMager-mm9ie
    @MageMager-mm9ie 7 місяців тому

    What's the 3 points of pressure 's the 3 bulbs in unbounded zone in relivence to structure barrier of the drilling prior to grouting what was with the symbolism of the 3 points of contact in the structure wall, question what is grouting in this construction does it have properties and how are the properties stores and then handled prior to pumping grout thru the granulated drilling what form of mechanics will be used when intact with rotary. Is it like as to rotary hammer or drill and if it is rotary hammer or drill what is the mechanics, are the heads of the tips in similarity and what are it's metrics if applicable. Not to miss lead but what tool is used in the demolishoned constructruction of the instillation. So a drill rig

  • @zaararkhan8051
    @zaararkhan8051 3 роки тому

    Very helpful

  • @Imranhssn159
    @Imranhssn159 6 років тому +1

    Sir how to design the anchor bearing plate, bolt and conical wedge. Kindly guide me.