Hello sir, What be the standard product cycle time for below case to calculate over all line efficiency. Let assume there are five work station A,B,C,D,E having one operator at each station with cycle time 5,10,15,20,25 sec respectively in an assembly line. Here all work station are in series.
Dear Saurabh thanks for writing me, In your query and in this case Standard product C.T. would be called as Through time that is sum of all cycle times performing by same operator.
So 75 is the throughput time . For more details please see my video on all times terminology and to understanding in details in this week I will put a video on assembly line balancing.
Dear sir again making video of OLE with details.
For easy explain.
Best collection of study materials
Excellent
Hello sir,
Can you please make a video on 'Overall Labour Efficiency' calculation?
It'll be a great help.
Thank you in advance.
Amazing
Sir LPA audit check list ka excel format chahiye
Please share your mailid
Hello sir,
What be the standard product cycle time for below case to calculate over all line efficiency.
Let assume there are five work station A,B,C,D,E having one operator at each station with cycle time 5,10,15,20,25 sec respectively in an assembly line. Here all work station are in series.
Dear Saurabh thanks for writing me,
In your query and in this case
Standard product C.T. would be called as Through time that is sum of all cycle times performing by same operator.
So 75 is the throughput time .
For more details please see my video on all times terminology and to understanding in details in this week I will put a video on assembly line balancing.
Please see this video
ua-cam.com/video/rewT5iGKIpo/v-deo.html
Thanks a million for your support.
25 sec
Bhut lengthy