Correction on Studio C Cappa: It was actually installed in Joplin Missouri in July 2003, and was the first one to be installed according to Showbiz Pizza wiki.
Anyone remember that short period of time when everyone was upset at COL for taking out good stages and deemed it a threat.... haha well we sure as heck didn't expect this dance floor disaster now did we?
The 2-Stage Cyberamic animatronics is the only location left in my area. I used to have the 3-Stage concept unifications but that sadly closed down years ago.
Green Bay did have a Gen1 studio C Beta, but I could've also opened in South Portland, Maine seeing as that also had Gen1 and opened the same year Studio C Beta was made.
One of my favorite stages is the studio c beta with a 32 movement bot it just looks cool with it I want to know how much 32 movement bots on studio c betas exist in California.
@@supersonicadam3002 I am pretty sure it is just a display and no longer functional, we do have pictures though, I think. I would like it to be functional though, as for In like the layout.
studio c beta was first opened in grapevine tx my first cec and studio c alpha was opened in monfort btw kansas got the 3 stage first idk which area is kansas but yeah.
I thought so too until I looked up cec’s in my state and I realized a lot of them had either studio c or munches make believe band, it’s sad the my location replaced studio c with the live stage though 😕
Correction on Studio C Cappa: It was actually installed in Joplin Missouri in July 2003, and was the first one to be installed according to Showbiz Pizza wiki.
R.I.P the shelf portrait style show 1977-1991
Anyone remember that short period of time when everyone was upset at COL for taking out good stages and deemed it a threat.... haha well we sure as heck didn't expect this dance floor disaster now did we?
I wish they got the shows back😢 when I went to my location and saw the dancefloor it didn't feel like a Chuck e cheese...
The Shelf is my favourite, studio c beta is my favorite outfits studio c, and their favourite overall.
I swear they should’ve just stopped at circle of lights, the dance floor sucks
the dance floor is bogus
#dancefloorisworst #welovemmbb
They should make a 3 stage with the 2 1 and road stage animatronics and the cu 2 stage
They actually did
I wish they still had a balcony stage and a c stage
The 2-Stage Cyberamic animatronics is the only location left in my area.
I used to have the 3-Stage concept unifications but that sadly closed down years ago.
I guessed that the first beta was opened in Green Bay, WI. But not entirely sure
Green Bay did have a Gen1 studio C Beta, but I could've also opened in South Portland, Maine seeing as that also had Gen1 and opened the same year Studio C Beta was made.
prob grapevine tx cuz they installed in 2002 green bay got it in 2003 i belive oh and grapevine tx has a 32m bot
I know you!
One of my favorite stages is the studio c beta with a 32 movement bot it just looks cool with it I want to know how much 32 movement bots on studio c betas exist in California.
2 now😢
What about the Hollywood stage, winter stage and playroom stage
All opened in Alabama 0 remain in operation 1993 - 1995
3:44 I Forgot To Put How Many In Operation So Currently There Are Three CU 1-Stages
One of them is in Springfield, Illinois
My favorite one is c stage 😀
My 2 local Chuck E. Cheese’s have a studio c beta and the 3 stage
You live in Richmond
Studio C Alpha in Lone Tree, CO. It’s planned to be updated to live stage 2.0 April 2022
I got road stage there’s only 15 left
1:37 the first road stage was actually installed in Springfield, PA
Ceiling Fan That’s The Test Stage The First Stage Was Mississauga, Ontario, Canada
the finalized version was installed at Jonesboro, lol.
also yeah technically, Springfield, PA was in fact the FIRST road stage in existence.
I Like The Galaxy Stage And The Shelf
Yes
My location in brick township has the studio c beta stage it used to be a 2 stage then It’s got the studio c stage in 2006
I Once heard that 3 stage cec animatronics are placed in a glass above a prize area can someone search that for me?
that’s Chuck E. Cheese gua last place with latex mask
ik but im looking for pictures and videos of the balcony
@@supersonicadam3002 I am pretty sure it is just a display and no longer functional, we do have pictures though, I think. I would like it to be functional though, as for In like the layout.
studio c beta was first opened in grapevine tx my first cec and studio c alpha was opened in monfort btw kansas got the 3 stage first idk which area is kansas but yeah.
There is a studio c alpha in fort Wayne
what happened to the Awesome Adventure Machine chuck E cheese animatronic A. SCRAPPED B. LEFT TO ROT OR C. IT'S FACE AND LIMBS WERE USED FOR PARTS
Devi Fazbear it maybe got turned into studio c bot
Rip chuck e cheese
Nope it's still alive
@@kidtomme he means the animatronics
Huh? There are that many 3 stages left well closure and 2.0 loves them
Who else is lucky?Galaxy Stage visitor gang here.
1987 to present 0:38 hmmmm
yeah there is still one rocker stage in operation today
Damn I thought there were more live stages. Apparently I was heavily wrong. I need to stop thinking so negative
I thought so too until I looked up cec’s in my state and I realized a lot of them had either studio c or munches make believe band, it’s sad the my location replaced studio c with the live stage though 😕
There’s 200 now
Road stage is so incorrect it was installed in Springfield pa
That image of the Chuck E. Cheese circles of light stage what is the name of that location
Mistake it’s somewhere in Chicago not Texas
For what stage?
You forgot Playhouse stage
And
Hollywood Stage
The new version: ua-cam.com/video/HWim12wmSfU/v-deo.html
YOU FORGOT ONE
the baloncy stage was out intill 1992 or 3
Tem que ter um br nos comentário
The portrait is wrong it was 1984 and balcony never made it to cool Chuck it was 1984
1 stage was 1991 2 stage was right and AAM was only 1997