- 118
- 215 148
Salvatore Ferrara
Приєднався 11 січ 2013
IMG 3871 2
Jason Nandlal taking our Electrical Program Started on 7.29.2024 who is also our new Media Assistant Interviewing William McDearmon taking our HVAC/R Program started on 7.29.2024
Video Taken by Michael Ponzio is Our New Media Apprentice
Video Taken by Michael Ponzio is Our New Media Apprentice
Переглядів: 5
Відео
IMG 3867
Переглядів 59 годин тому
Jason Nandlal taking our Electrical Program Started on 7.29.2024 who is also our new Media Assistant Interviewing Michael Mariano-Conceicao taking our Electrical Program started on 7.29.2024 Video Taken by Michael Ponzio is Our New Media Apprentice
Placement video
Переглядів 432 місяці тому
Stop Paying for Online Job Sites. Get Your Helper Today! Get Electrical and HVAC/R Helper Resumes Fast & Free Contact us at: (631) 226-8021 Ext. 4
3D House Interview
Переглядів 272 місяці тому
Our electrical students working on the first 3D Printed house on Long Island.
“What does a digital manifold do differently than an analog manifold?”
Переглядів 1096 місяців тому
“What does a digital manifold do differently than an analog manifold?”
RHEEM PLUMBING SUPPORT TO THE ELECTRICAL & HVAC/R TRAINING CENTER
Переглядів 102Рік тому
Stephen Bissinger highlights he partnership with The Electrical & HVAC/R Training Center and how he contributes to the Trades. He goes over training with new Rheem products and also shares his personal experience being a plumber and a business owner.
Electrical and HVAC/R Training Center Overview
Переглядів 1,2 тис.Рік тому
Rob McLaughlin - Assistant Director What can an Electrical Program Student expect to learn from Electrical and HVAC/R Training Center? What can a HVAC/R Program Student expect to learn from Electrical and HVAC/R Training Center?
HVAC/R Program
Переглядів 283Рік тому
Today we had Steve from Venco Sales talking about our HVAC/R Program and the HVAC/R Industry. Stephanie our Career and Marketing Assistant conducted the interview with Steve.
HVAC/R Program Instructor going over HVAC electrical Board controls.
Переглядів 765Рік тому
HVAC/R Program Instructor going over HVAC electrical Board controls.
Spolan Zoom Lock Max with Electrical and HVAC/R Training Center
Переглядів 1772 роки тому
Spolan Zoom Lock Max with Electrical and HVAC/R Training Center
Mod 0 8 Overview of TAFTOG Electrical Estimating Program
Переглядів 1512 роки тому
Mod 0 8 Overview of TAFTOG Electrical Estimating Program
Mod 0 7 Adjusting Labor Units for Uneven Productivity
Переглядів 942 роки тому
Mod 0 7 Adjusting Labor Units for Uneven Productivity
Mod 0 6 Who Needs to Know Estimating and Why
Переглядів 463 роки тому
Mod 0 6 Who Needs to Know Estimating and Why
Mod 0 2 Calculating and Applying Overhead
Переглядів 453 роки тому
Mod 0 2 Calculating and Applying Overhead
First time? lol
Wtf is going on here
I clicked on this looking for an interview with a house that was 3D. I did not even know what that was so I wanted to find out. Definitely clickbait.
Model tools
This course still available?
When replacing the 7505 is it plug and play or do you have to program it?
Muy eficiente la explicación 👏
someone is talking in the background. hard to hear.
I have trouble with a 2 way. Good job boys. Teacher got be badass! Good program. Gives me hope in next generation
What is the point of this
Shit goes hard
Amazing, truly amazing. Yall both will be fine in the future
Like and a sub from the UK, purely for the enthusiasm 😂
Good job multi switch wiring can be hard
These boys seem proud, keep up the hard work and in this day and age it will take them far.
Not bad, i like it
3-4-4-4-4-3 way
Wemt to ETC just over 9 years ago, greatest thing I've ever done. 9 years with TAP Electric. Fiber Optic specialist. High voltage, 3rd rail caldwelding. Circuit breaker houses. 2000 kcmil cable, shielded and Unshielded. Data/comm , also have done a lot of residential besides industrial. 5 year apprenticeship completed through TAP. I have learned a helluva lot. And it wouldn't have happened without ETC. My name is John Longinotti. Thank you guys!
I'm 32 years old looking for a career change. I live on long Island. Came across this school . Do you recommend ele tric or hvac
How to wire a Field controls CK-63 control box to a Beckett Genisys 7505P primary control
How to wire a Field controls CK-63 control box to a Beckett Genisys 7505P primary control
thanks for the content. However you wrote 3382 instead of 33821 when adding up your loads on the white board. The answer is correct, just not the math you showed on the board.
Can you explain the difference between coated and uncoated?
I have an older fuel oil furnace without all of these safety's on it. Is there a way to adapt these to an older unit ??
thanks for the help going through jatc/ibew apprenticeship
Mr. B Great instructor !!! Great person as well !!!
Thank you 🙏
Wouldn’t the ground count as 1/4 of the largest volume conductor
Up to four count as 1 conductor and each additional after that count as a quarter each
Did he say he is "Mr. . . ." Pass.
Keeps going to softlockout
Fantastic video. Excellent explanation.
Sal is a Great instructor ! He motivates people ! 🎉 !
Unfortunately, mr Salvatore you are wrong if you look at 128.75 amps that you got is not a standard size based on Table 240.6 you will have to go to the next standard size available being that 150amps your wire size in this case on the 75 degree column will be 1/0.
So I can break that site up to two 200 amp panels, and I would be golden? Seems a bit of a stretch. I understand, but it can't be THAT simple. the demand factors are based on what equipment?
Awesome video were can I find 10,000 to detuct in the articles
Is there any way without any expensive tools of telling whether or not the freon is still inside the unit? I found one i wanted to take apart to scrap for copper and aluminum but I stopped breaking at down before compromising any of the pipes because luckily at the best time imaginable i learned that its illegal and dangerous to release freon, i wanna continue breaking it down it seems old so im not sure what to do or if theres even freon inside
Cioa, Salvatore. According T240.6(A) breakers size billable on the market are - ..., 125A or 150A. So, what is the justification for using one over the other, according to NEC2020? Graze Mile!
Thanks for the info.
great video. I learned a lot. thank you.
5/16" is not a correct dimension. Regards, Beckett dealer since 1987.
Very very informative video and easy to understand. Thanks
What if it just make buzz noise and won't start furnace
Thank you! I'm studying for my NICET and ran into this taking practice quizzes. I had no idea what I was looking at.
Are 7284 no ignition
What should the "TT" setting be on if you operating a furnace with a programable thermostat (ecobee) be set on? My configuration has an internal jumper. If I'm reading the instructions properly I should set it to "Yes" with no wires connected to "TT".
Thanks. It would be interesting to know how they do load calculation for skyscrapers.
The head with the rope needed some tape.
Hi Brothers, how are everyone doing? I see the was not made properly.
first time i've found something that explains this! i appreciate it
the guy at end of pull... 😆 will catch it especially on bigger Guage of wire...