Gantt Chart Planner for Confluence - Get Started - Full demo - Product Overview
Try it free: marketplace.atlassian.com/apps/1227063/gantt-chart-planner-for-confluence-roadmap-timeline?hosting=cloud&tab=overview&.com&
Visit our official website: www.ricksoft-inc.com/?.com&
0:05 Introduction
0:17 Creating a Gantt Chart
0:40 Creating and Managing New Task
1:36 Managing the Gantt Bar
2:41 Navigating the Gantt Chart View
3:10 Resource Management
4:36 Progress Line
5:16 Critical Path
5:49 Summarized Timeline
6:24 Jira Issues in Gantt Chart
7:33 Context Menu
8:05 Filtering Column
8:20 Data Import, Export, and History
9:07 Publishing and Viewing Gantt Chart
Переглядів: 82

Відео

Effortlessly Manage Jira Reports in Confluence with Jira Issue Sheets
Переглядів 71Місяць тому
Take your Jira reporting to the next level with Jira Issue Sheets by Excel-Like Tables for Confluence! In this video, discover how to seamlessly pull real-time Jira data into Excel-like spreadsheets within Confluence. Learn how to: ✅ Import Jira issues into your spreadsheet with ease ✅ Use advanced features like pivot tables and slicers to enhance your reporting ✅ Use Conditional Formatting to ...
Excel like Tables for Confluence quick start
Переглядів 29Місяць тому
Excel like Tables for Confluence quick start
Introducing Gantt Chart Planner for Efficient Project Planning! 🚀
Переглядів 33Місяць тому
Introducing Gantt Chart Planner for Efficient Project Planning! 🚀
Three Quick Ways to Use WBS Gantt Chart on Your Jira
Переглядів 60Місяць тому
Three Quick Ways to Use WBS Gantt Chart on Your Jira
WBS Gantt-Chart for Jira - Get Started - Full demo - Product Overview
Переглядів 9734 місяці тому
Try it free: marketplace.atlassian.com/apps/1211768/wbs-gantt-chart-enterprise-project-management-for-jira?hosting=cloud&tab=overview&.com& Visit our official website: www.ricksoft-inc.com/?.com& User section 0:05 Introduction 0:16 Opening a gantt chart 1:05 Creating Jira issues 1:31 Deleting Jira issues 1:42 Updating issues hierarchy 2:02 Copying Jira issues 2:15 Undo and redo your changes 2:2...
Excel-like Bulk Issue Editor for Jira - Get Started - Full demo - Product Overview
Переглядів 3224 місяці тому
Try it free: marketplace.atlassian.com/apps/1214580/excel-like-bulk-issue-editor-for-jira-spreadsheet-table?tab=overview&hosting=cloud&.com& Visit our official website: www.ricksoft-inc.com/?.com& 0:17 Opening a spreadsheet 0:38 Hiding and displaying columns 1:05 Sorting and freezing columns 1:21 Sorting and filtering values 1:45 Editing multiple issues 1:57 Creating multiple issues 2:27 Clonin...
Excel-like Bulk Issue Editor for Jira - The Fastest Way to Edit Jira Issues
Переглядів 3319 місяців тому
The days where you’re frustrated with Jira’s bulk issue change function are in the past! Excel-like Bulk Issue Editor for Jira powers you to fly through your backlog and edit multiple issues from a built-in spreadsheet app, without having to leave Jira. With its familiar Excel-like interface and operations (e.g. Sort and Filter, Freeze Columns), get more out of your issue data. Or simply copy a...
Jira admin's guide: How to configure field-level security with Secure Custom Fields for Jira
Переглядів 399Рік тому
Secure Custom Fields for Jira enables Jira admins to control the view and edit permissions at the field level. This allows users to customize projects and issues for specific business requirements regarding data privacy. Try it for free from the Atlassian Marketplace: marketplace.atlassian.com/apps/1226365/secure-custom-fields-security-permission-for-jira?tab=overview
How to set up Jira automation with secure fields
Переглядів 127Рік тому
Jira Automation can’t read secure field values in a normal way since the values are encrypted. This video shows how you can integrate secure custom fields with Jira Automation.
Mastering Jira Backlog Management: Product Manager's Guide with Excel-like Bulk Issue Editor
Переглядів 300Рік тому
In this video, you will learn how product managers can efficiently manage backlog using an Excel-like Bulk Issue Editor for Jira. We will explore everyday Jira tasks such as creating Jira issues, conducting quick analyses, and performing bulk edits with a real-world scenario. Chapters 0:03 Challenges as a product manager 0:49 Bulk issue creation 1:43 Conditional formatting 2:21 Column configura...
Excel-like Tables for Confluence - App Demo - Gonna Document 'Em All! 🍂 Apptoberfest 2023 🥨
Переглядів 100Рік тому
Excel-like Tables for Confluence - App Demo - Gonna Document 'Em All! 🍂 Apptoberfest 2023 🥨
Secure Custom Fields for Jira - App Demo 🍂 Apptoberfest 2023 🥨
Переглядів 86Рік тому
Secure Custom Field for Jira lets you control the Jira issue's security permission at field level, compatible for both Team-managed and Company-managed projects. 🔒 Get 30-day free trial now: marketplace.atlassian.com/apps/1226365/secure-custom-fields-for-jira?hosting=cloud&tab=overview.
Excel-like Bulk Issue Editor for Jira - Get Started
Переглядів 643Рік тому
Atlassian Marketplace: marketplace.atlassian.com/apps/1214580/excel-like-bulk-issue-editor-for-jira-spreadsheet-table?tab=overview&hosting=cloud&.com& Visit our official website www.ricksoft-inc.com
Space Sync for Confluence - Sync content across Confluence spaces
Переглядів 552Рік тому
Space Sync for Confluence helps you sync contents between spaces, including external Confluence sites. You'll only need to configure the synced spaces once, then you can push any page to keep them updated across multiple locations. Get your 30-day free trial from the Atlassian Marketplace: marketplace.atlassian.com/apps/1227063/gantt-chart-planner-for-confluence-fast-roadmap-timeline?hosting=cl...
WBS Gantt-Chart for Jira Quick Guide To Manage Your Project
Переглядів 9 тис.Рік тому
WBS Gantt-Chart for Jira Quick Guide To Manage Your Project
Webinar - A Buyer's Guide to Jira Agile Project Management Apps
Переглядів 3302 роки тому
Webinar - A Buyer's Guide to Jira Agile Project Management Apps
WBS Gantt-Chart for Jira - Get Started
Переглядів 7 тис.2 роки тому
WBS Gantt-Chart for Jira - Get Started
Excel-like Tables for Jira - Get Started
Переглядів 2,5 тис.2 роки тому
Excel-like Tables for Jira - Get Started
Excel-like Tables for Confluence - Spreadsheet and Chart
Переглядів 1 тис.2 роки тому
Excel-like Tables for Confluence - Spreadsheet and Chart
Gantt Chart Planner for Confluence - Fast and Easy Charts for Everyone
Переглядів 2,3 тис.2 роки тому
Gantt Chart Planner for Confluence - Fast and Easy Charts for Everyone
Use a spreadsheet on a global template
Переглядів 5462 роки тому
Use a spreadsheet on a global template
Simplify the table appearance - Excel-like Tables for Confluence
Переглядів 8002 роки тому
Simplify the table appearance - Excel-like Tables for Confluence
How to output a long horizontal sheet as a single PDF sheet - Excel-like Tables for Confluence
Переглядів 3222 роки тому
How to output a long horizontal sheet as a single PDF sheet - Excel-like Tables for Confluence
Excel-like Tables for Confluence Demo
Переглядів 3,2 тис.2 роки тому
Excel-like Tables for Confluence Demo
Demo: How to use Drop down list on your table: Excel-like Tables for Confluence
Переглядів 7 тис.2 роки тому
Demo: How to use Drop down list on your table: Excel-like Tables for Confluence
Using Gantt Chart Planner for your projects
Переглядів 1,6 тис.2 роки тому
Using Gantt Chart Planner for your projects
Gantt Chart Planner for Confluence Tutorial
Переглядів 5 тис.2 роки тому
Gantt Chart Planner for Confluence Tutorial
Import CSV file of Gantt Chart Planner into Jira Advanced Roadmaps
Переглядів 1,8 тис.2 роки тому
Import CSV file of Gantt Chart Planner into Jira Advanced Roadmaps
Gantt Chart Planner for Confluence Demo
Переглядів 6 тис.3 роки тому
Gantt Chart Planner for Confluence Demo

КОМЕНТАРІ

  • @micahw-r8n
    @micahw-r8n 5 місяців тому

    all child issues are duplicated.

    • @RicksoftInc
      @RicksoftInc 5 місяців тому

      Hi @micahw-r8n Duplicating issues effortlessly is the purpose of the Template feature. ;) As show in the video, this feature helps you to create the same Test Case multiple times for different versions. That would make sense, if you consider if the tests are mostly the same for each version released. To avoid duplicates in a sense where every issue has the same name, you can replace “$<Any string>$” in the template's issue summary with the wording of your choice. You can find out more details at docs.ricksoft-inc.com/wbs-gantt-chart-for-jira-cloud/managing-an-issue-template or contacting our support team at ricksoft-support.atlassian.net/servicedesk We will be happy to help!

  • @MunirAfridi-km9qi
    @MunirAfridi-km9qi 7 місяців тому

    can we update custom fields here

    • @RicksoftInc
      @RicksoftInc 7 місяців тому

      Yup, you can update the custom field using this app. For more details, please refer to our documentation to see which fields are supported. :) docs.ricksoft-inc.com/excel-like-issue-editor-for-jira-cloud/supported-fields

  • @rugbyrick
    @rugbyrick 7 місяців тому

    How do I add Sprints from Jira into the chart?

    • @RicksoftInc
      @RicksoftInc 7 місяців тому

      Thank you for your comment :) At this moment, there is no feature available to add Sprints from Jira into the chart. However, a feature request has been created for this functionality. You can track its progress and updates at the following link: trello.com/c/WQjEJZoS/123-add-jira-sprint-and-version-on-timeline-header We appreciate your patience and understanding. Please stay tuned for future updates.

  • @JuanCarlosSoriaOliva
    @JuanCarlosSoriaOliva 8 місяців тому

    Hi. I wan to know if the GANTT can be updated automaticaly, when I close a task from JIRA or the % has to be updated manually

    • @RicksoftInc
      @RicksoftInc 8 місяців тому

      Hi @JuanCarlosSoriaOliva, Thank you for watching the video! Although the features differ between the Cloud and Data Center versions, WBS Gantt-Chart for Jira has the feature to change the percent done value of a closed issue to 100%. Cloud There is an option to treat the percent done of resolved issues as 100% on the Gantt-Chart. docs.ricksoft-inc.com/wbs-gantt-chart-for-jira-cloud/gantt-issue-settings#Ganttissuesettings-(Option)Whenanissueisresolved,thepercentdoneautomaticallybecomes100% Data Center There is a feature that automatically updates the value stored in the percent done field to 100% when an issue is resolved. docs.ricksoft-inc.com/wbs-gantt-chart-for-jira-data-center/global-issue-view-settings-display-mode-start-fini#Globalissueviewsettings-displaymode,start/finishdate,andpercentdone-(Option)Whenanissueisresolved,thepercentdoneautomaticallybecomes100% Does this answer your question? Let me know if you need any further assistance. Best, Ricksoft team

  • @whoami-bl6ed
    @whoami-bl6ed 9 місяців тому

    Hey! I want to know how we can share the view of WBS Gantt-Chart for another person in my team? I have been struggling a lot to find out but ended nothing. Thanks!!!

    • @AlessandrofromRicksoft
      @AlessandrofromRicksoft 9 місяців тому

      Hello @@whoami-bl6ed, Alessandro from Ricksoft here. You should be able to share your Gantt with anyone with access to your Jira instance by directly sharing your Gantt-chart URL. After openinig your Gantt-chart, copy its URL and send over to your teammate. The format should be something like this: yourjira.atlassian.net/plugins/servlet/ac/jp.ricksoft.plugins.wbsgantt-for-jira/main?ac.filter=GANTT_-10233 Hope that helps! If there is anything you would like to ask, please don't hesitate to ask either here or in our support channel at www.ricksoft-inc.com/support/ Thank you for watching!

    • @whoami-bl6ed
      @whoami-bl6ed 9 місяців тому

      @@AlessandrofromRicksoft thanks you very much!

  • @omosteve
    @omosteve 10 місяців тому

    Hello, can you disable the "Jira Field Mapping" feature? I would like to just edit the data imported into the Excel sheet but have it not update Jira fields. Thanks.

    • @RicksoftInc
      @RicksoftInc 10 місяців тому

      Great suggestion! We've added your request to our backlog and we will take a look into this in Q1 FY25. Meanwhile, you can click 'Watch App' on the marketplace to get the latest update. marketplace.atlassian.com/apps/1223727/excel-like-tables-for-jira-sheet-import-export?hosting=cloud&tab=overview Have a great weekend!

  • @earljames9514
    @earljames9514 Рік тому

    P r o m o s m 😜

  • @bioinformatics73
    @bioinformatics73 Рік тому

    How do you connect Excel-like macro to dynamic data from a Jira query?

    • @RicksoftInc
      @RicksoftInc Рік тому

      It is currently impossible to get dynamic data from Jira to use it in Excel-like Tables for Confluence macro. It is, however, in our roadmap to integrate with Jira. I'm not sure if this can answer to your question. Alternatively, you can try Excel-like tables for Jira to get dynamic data from Jira fields. You can create a Jira field mapping and then create charts and reports using those data. You can try it here: marketplace.atlassian.com/apps/1223727/excel-like-tables-for-jira-sheet-import-export?hosting=cloud&tab=overview

    • @omosteve
      @omosteve 10 місяців тому

      @@RicksoftInc Is this feature available now "get dynamic data from Jira to use it in Excel-like Tables for Confluence macro"?

    • @RicksoftInc
      @RicksoftInc 10 місяців тому

      @@omosteve Unfortunately, we are still working on this. If everything goes well, we potentially can release it at the end of April.

    • @RicksoftInc
      @RicksoftInc 2 місяці тому

      @omosteve @bioinformatics73 Thank you for your interest! We've released the Jira Issue Sheets feature for Excel-like Tables for Confluence Cloud, you could easily get pull jira issue list to your spreadsheet with this feature. You can check it out here how it works here: docs.ricksoft-inc.com/excel-like-tables-for-confluence/jira-issue-sheets. If you're using Data Center, let us know! We're currently gathering interest for future developments.

  • @sql6081
    @sql6081 Рік тому

    Quick. To the point. Thanks.

  • @E4MCloud
    @E4MCloud Рік тому

    I want to do overall Project Planning with Gantt Chart, all issues has planned start/end date. To implement the project, I run Scrum sprint and move issues between sprints, each issue will have actual start/end date. Then I want to see how these issues actually run in sprints compared with planned start/end date. Can we do that with WBS Gantt Chart?

    • @RicksoftInc
      @RicksoftInc Рік тому

      Hi Thuy, WBS Gantt-Chart will help in this case. You can use Baseline to manage the origin plan. When you update the actual plan, no effect to origin plan (Baseline). And you can see your 2 plans on gantt chart. For more information about baselines, check out our documentation. docs.ricksoft-inc.com/wbs-gantt-chart-for-jira-cloud/viewing-the-plan-and-the-baseline

  • @E4MCloud
    @E4MCloud Рік тому

    Can we run Scrum sprint in WBS Gantt Chart? The actual start/end date of issue in a sprint is not going to affect the planned start/end date in Project Plan?

    • @RicksoftInc
      @RicksoftInc Рік тому

      You can also run the scrum sprint with WBS Gantt-Chart. The actual start/end date of issue in a sprint is not going to affect the planned start/end date in project plan when you set your baseline.

    • @E4MCloud
      @E4MCloud Рік тому

      @@RicksoftInc Cool. Thanks

  • @luzkarimeomana
    @luzkarimeomana 2 роки тому

    excelente!!! muchas gracias!

  • @xavierrigau3130
    @xavierrigau3130 2 роки тому

    8:50 In my experience task duration during planning rarely change. If there is a overallocated resource, MS Project, will automatically reschedule the tasks so that no resource is above 100% of utilization. Why do I have to do resource leveling manually? Is the demo using the current version? It doesn't look like.

    • @RicksoftInc
      @RicksoftInc 2 роки тому

      For WBS Gantt-Chart, we allow our users to resource level manually because our users have many ways to task plan so it's quite difficult to have the feature that fits all. WBS Gantt-Chart does not support automatic task planning now. While this demo is for version 9.2, our current version is 9.14 so it is a bit different. We will take your feedback into consideration.

  • @xavierrigau3130
    @xavierrigau3130 2 роки тому

    0:40 Where is this now? I don't see it. I am using the Cloud eval In my experience task duration during planning rarely change. If there is a overallocated resource, MS Project, will automatically reschedule the tasks so that no resource is above 100% of utilization. Why do I have to do resource leveling manually?

    • @RicksoftInc
      @RicksoftInc 2 роки тому

      Hi Xavier, for the timestamp that you are referring to, that is our auto-correct schedule feature which is different from resource leveling. We have the resource leveling on manual because our users have many ways of task planning so it is quite difficult to find a feature that fits all. You can learn more about our auto-correct schedule feature here - docs.ricksoft-inc.com/wbs-gantt-chart-for-jira-data-center-and-server-0914/creating-plans-baselines-and-due-dates#Creatingplans,baselines,andduedates-Auto-correctschedule

  • @VishInSydney
    @VishInSydney 2 роки тому

    Does 7.16.3 support this please?

    • @RicksoftInc
      @RicksoftInc 2 роки тому

      Hi Embers, unfortunately 7.16.3 does not support this. Gantt Chart Planner for Confluence is only available on the Cloud version

    • @VishInSydney
      @VishInSydney 2 роки тому

      @@RicksoftInc thank you. Your tutorials are like oxygen for some of us.😊

  • @gracielachavez4407
    @gracielachavez4407 2 роки тому

    Yyyyyyyyyyyyyyyyyyytyyyyyyyyyyyyyyyyyyeah yyyyyyyyyyyyyyyyyyyyyyyyyyyygyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyya yyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyy6yyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyya yyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyth yyyyyyyyyyyyyyyyyyyy yyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyy7yyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyygyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyytyyyyyyy7yyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyy7yyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyeah yyyyyyyyyyyyyyyyyyyyyyyyyyyyyy7yyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyy7yyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyy7yyyyyyyyyyyyyyyyyyyyyyyyyyyyyyygyyyyyyyyyyyyyyyyyyyyyygyyyyyyyyyyyyyyygyyyyyyyyyyyyyyyyyy7yyyyyyyyyyyyyygyyyyyyyygyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyy7yyyyyyyyyyyyyyyyyyyyyyyyyy7yyyyyyyyty7yyyyyyyyyyyyyyyyyyyyyyyyyyyytyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyy7yyyyyyyyyyyyyyyyyyyyeah yyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyy77yyygyyyyyyyyyyyyyyyyyytyyygyyyyyyyyyyyy7yy7yyyyeah yyyyyyyyygyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyy7yyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyytyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyygyyyyyyyyyyyyyyyyyyyyyyyyy6yyyyyyyyyyyyyyy7yyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyy7yyyyygyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyy7yyyyyyyyyyyyyy7yyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyy7yyyygyyyyyyyy6yyyyyyyyyyyyyyyyygyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyy7yyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyy7yyyyyyyyyyyyyyyyyyy7yyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyy7yyyyyyyyyyyyyyyyyyyyyyyyyyyygyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyeah yyyyyyyyyyyyy7yyyyyyytyyyyyyyyyyyyyyyyyyyyyyyyyyyyyy7yyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyygyyyyyyyyyy7yyyyyyyyyyyyyyyyyyyyyyyyyyyy7yyyyyyyy7yyyyyyyyyy7yyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyygyyyyyyytyyyyyyyyyyyyyyyyy7yyyyyyyyyy77yyyyyyyyyyyyyyyyyyyyyyyyyyyyyy7yyyyyyyy7yyyyyyyyyyyyyyyyyyyyyyyyyygyyyyygyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyy6yyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyygyyyyy7yyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyy6yyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyy7yyyyyyyyyygyygyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyygyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyy7yyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyy7yyy7yyyyyyyyyyyyyyyy7yyyy7yyyyyyyyyyyyyyyyyyyyyy6yyyyyy7ygyyyyyyyyyyyyyyyyyyyyyyy

  • @KordTaylor
    @KordTaylor 2 роки тому

    Yup. Jira is a bit timeline-challenged. I’ll check out your software. Thank you.

  • @codydowling1120
    @codydowling1120 2 роки тому

    Hi there! Great video- thank you for putting it together. It seems your tool may be better than what we are currently using but the video left me with a few questions: We are currently using "Big Gantt" for our business and, while it's better than using the roadmap feature in Jira alone, it doesn't seem to have some of the key features that we found valuable in MS Project. Does your tool: 1. Allow you to set the work efficiency of each of the resources? (i.e. Bob and Mary attend several internal initiatives and are only available 5-6hrs each work day for individual contribution to a project, so they are set at 80% work efficiency...) 2. Take into account the loading for a given resource if he/she is assigned across multiple projects? (If Bob and Mary are assigned to 3 projects, does the tool understand that Bob and Mary can't have the same 5-6hrs each day assigned to all 3 of the projects.) 3. Allow bottoms-up schedule building, whereby each individual contributor provides an estimate of the time needed for their portion of the project and the project manager inserts this into an overall schedule? Finally, do you offer training for using your tool or know of a 3rd party provider who could help walk us through how the tool is used best within the Jira ecosystem (issue tracking, task assignment, etc.)? Thanks for your help and look forward to your response!

  • @rickdee888
    @rickdee888 2 роки тому

    Where to get the gantt based timeline, you never mention.

  • @Paghare
    @Paghare 3 роки тому

    is it possible to track raids in Jira?

    • @RicksoftInc
      @RicksoftInc 3 роки тому

      Thank you for the inquiry. If your question is about Jira itself, I would recommend you to contact Atlassian. www.atlassian.com/company/contact Best regards, Ricksoft Team

  • @elisolutions
    @elisolutions 3 роки тому

    Thanks dor sharing!

    • @RicksoftInc
      @RicksoftInc 3 роки тому

      Our pleasure! Thank you for watching.

  • @rhatkinson3699
    @rhatkinson3699 3 роки тому

    Content was okay, but the background music was horrible. It was intrusive and made the video hard to watch!

  • @cristianriccio1188
    @cristianriccio1188 3 роки тому

    Hello, thanks for this informative video! Do you know if there is a feature to visualise the difference between the predicted time for a task and how long the task actually took to complete? For example, the allocated time could be visualised with a rectangle, and the extra time could be visualised with a rectangle made up of dashed lines? That way, we can immediately see any mismatch between expectation and reality. Do you know if such a feature exists that is built into JIRA and can be added on? Thanks!

    • @RicksoftInc
      @RicksoftInc 3 роки тому

      Hi, thank you for the comment. Yes, our WBS Gantt-Chart for Jira Cloud has exactly what you are inquiring about. Hope the following document in our support center will help you; docs.ricksoft-inc.com/wbs-gantt-chart-for-jira-cloud/Creating-plans,-baselines,-and-due-dates.434372679.html#Creatingplans,[…]seliningissues Please feel free to contact us if you have any questions!

  • @geralinov4you75
    @geralinov4you75 3 роки тому

    Is there any option to see further back instead of just forward? I'd like to see the progress of things that were made in the past years for one project.

  • @tetianalesiv880
    @tetianalesiv880 3 роки тому

    Is there a chance you could make a more updated demo using the latest versions of WBS Gantt Chart? Thank you.

  • @laurapayne9759
    @laurapayne9759 3 роки тому

    Jira is outdated and missing some features. My team uses Restyaboard that helps me to manage teams and projects better than Jira.

  • @haworth7
    @haworth7 4 роки тому

    So where does Agile sprint planning fit into this? WBS Gnatt has a lot of nice features, but if you're managing a backlog and moving tickets between sprints, how do you keep the scrumboard progress in sync w/ the reporting within WBS Gnatt?

    • @RicksoftInc
      @RicksoftInc 4 роки тому

      Hi Steve, Thanks for watching the video! You can display your sprint schedule in WBS Gantt-Chart. To do so, go to setting > ticket > ticket display mode, and choose Sprint Start/ End dates for WBSGantt Start date and WBSGantt End date. Let us know if you have further questions! Best, Ricksoft team

  • @irrfannaawate4795
    @irrfannaawate4795 4 роки тому

    Can it be used for production management?

    • @RicksoftInc
      @RicksoftInc 4 роки тому

      Hi Irrfann, Thank you for leaving a comment here! Could you elaborate your question please? We'll be happy to answer! Best, Ricksoft team

  • @arkatos4570
    @arkatos4570 4 роки тому

    i try to use WBS Gantt-Chart but when i choose my project and play create Gantt, the software fail and appear a message say that y dont have the permission for that when im the administrator

    • @RicksoftInc
      @RicksoftInc 4 роки тому

      Hi Arkatos, Thank you for your comment! We're eager to investigate this matter, so could you please contact our support from here: ricksoft-support.atlassian.net/servicedesk/customer/portal/3 ? Thanks, Ricksoft Team

  • @pedroalexandrerainho
    @pedroalexandrerainho 4 роки тому

    Just great.

  • @howImetyourbrother
    @howImetyourbrother 4 роки тому

    Hi Rick - how do I turn on the app integration you show here as an add-on to my current Jira instance?

    • @RicksoftInc
      @RicksoftInc 4 роки тому

      Hi Barrie, Thank you for watching our video! Regarding app installation, you can do so from Atlassian Marketplace or the Universal Plugin Manager (UPM). Atlassian Marketplace: marketplace.atlassian.com/apps/1211768/wbs-gantt-chart-for-jira?hosting=cloud&tab=overview (Please choose the hosting type) UPM: confluence.atlassian.com/upm/about-the-universal-plugin-manager-305759439.html Does this answer your question? Let me know if you need any further assistance. Best, Ricksoft team

  • @gavincook2896
    @gavincook2896 4 роки тому

    Good day. Is it possible to configure the chart to only use epics?

    • @RicksoftInc
      @RicksoftInc 4 роки тому

      Hi Gavin Cook, Thank you for watching our video! Yes, you can create Jira filter that extracts only Epic and creating Gantt from that filter. Thanks!

    • @gavincook2896
      @gavincook2896 4 роки тому

      @@RicksoftInc Thank you so much for the reply! We use projects a little differently within JIRA. In a way, we use projects to represent the various departments, rather than a finite project. We then use initiatives as parents for epics. So in essence an initiative is a project. With the above in mind, would I be able to create a separate for Gantt for each intitiative? We would only want to be able to view the respective epics. Kind regards

    • @RicksoftInc
      @RicksoftInc 4 роки тому

      @@gavincook2896 Thank you very much for the detail. Short answer for your question would be yes, you could do that, but I would recommend you to talk with our support team as well. Please feel free contacting our support to discuss. www.ricksoft-inc.com/support/ Thanks!

    • @gavincook2896
      @gavincook2896 4 роки тому

      @@RicksoftInc Will do and thanks again.

  • @tirex77
    @tirex77 5 років тому

    Good afternoon! tell me implemented the ability to highlight task status and color task statuses that are displayed in the inquiry table very uncomfortable when everything is in one color

  • @bombociccio
    @bombociccio 5 років тому

    hello,using the demo seems that changes done at gannt level are not reflected into single jira estimation object. if this is confirmed is really a pity for the tool. please let me know

    • @RicksoftInc
      @RicksoftInc 5 років тому

      Hi, Thank you for watching our video. We would like to confirm your question details. Could you raise the ticket in our support desk below? ricksoft-support.atlassian.net/servicedesk/customer/portal/3/group/44/create/134 Thanks.

  • @siimvollmer
    @siimvollmer 5 років тому

    Hi, in this video (at 0:52) you are showing how to use "Percent Done". If you have linked tasks and added dependencies (arrows to next), it should indicate that next task cannot start before previous has been completed. Yet you change the %. It shows either bad planning or lack of priority to complete primary tasks.

    • @RicksoftInc
      @RicksoftInc 5 років тому

      Hi Siim, You made a point. We cannot recommend you to enter the % if the task has a predecessor, which isn't done yet. Thank you for pointing it out and sorry for not replying sooner.

  • @minyang3988
    @minyang3988 6 років тому

    i want know why i don't have the export bottom ?

    • @RicksoftInc
      @RicksoftInc 6 років тому

      We keep redesigning the operations toolbar, and "Export" is included in the "Data" menu at the version 9.4 or later. Please see the release notes for the details. rssupport.atlassian.net/wiki/spaces/WGC/pages/191528987/WBS+Gantt-Chart+for+Jira+9.4+release+notes

  • @Dean_Ferguson
    @Dean_Ferguson 6 років тому

    Does WBS Gantt-Chart support Tempo integration?

    • @RicksoftInc
      @RicksoftInc 6 років тому

      Hi Dean, WBS Gantt-Chart does not support Tempo integration. How do you want us to integrate? Please feel free raising a request in our public issue tracker here: rssupport.atlassian.net/projects/WGCPT We appreciate feedback from our customers. Cheers, Sean

  • @NeVraXGoesPro
    @NeVraXGoesPro 6 років тому

    Thank you for the extended features shown in the video. There is no link with issue "Time Tracking", or did I miss something ? Will it come soon ?

    • @RicksoftInc
      @RicksoftInc 6 років тому

      Hi NeVraX Goes Pro, Thank you for watching. You can use Jira's "time tracking" data to calculate a progress rate by choosing that option. See the below page for the details: rssupport.atlassian.net/wiki/spaces/WGCE0904/pages/166625318/Information+on+Gantt+issue+settings#InformationonGanttissuesettings-Editingtheprogressrate I hope I answered your question.

    • @NeVraXGoesPro
      @NeVraXGoesPro 6 років тому

      Thank you for your answer, but the documentation did not helped me much. On our projects, what's important are the fields Estimaded/Remaining/Logged, and I did not find how to reflect this data automatically in WBS Gantt. If I have to do it manually once my team has entered their fields on the board, the integration is pretty useless. Do you have a solution for me ?

    • @RicksoftInc
      @RicksoftInc 6 років тому

      As in the document, you can choose "Calculate with time tracking automatically" option for the progress rate (percent done). Then, WBS Gantt-Chart automatically calculates progress rate based on the "original estimate" and the "time remaining estimate." The equation is as follows: (Original Estimate - Remaining Estimate) / Original Estimate * 100 Other than that, I am afraid you can do not much with those values. Feel free contacting our support to share your situation in detail if needed. www.ricksoft-inc.com/support Thanks!

  • @erikhielscher5891
    @erikhielscher5891 7 років тому

    Comment on clarity of chart during tutorial: There are many repeating comments overlaying the Gantt Chart. Although I can easily ignore it, their absence would make the tutorial much more appealing.

    • @RicksoftInc
      @RicksoftInc 7 років тому

      Hi Erik, Thank you for your comment and valuable feedback. We will consider it when creating the next tutorial video.

  • @gerryconwayvoice
    @gerryconwayvoice 7 років тому

    Greetings! Who did the voice over on this one??? :o\

    • @RicksoftInc
      @RicksoftInc 7 років тому

      Hello Gerry, Do you like the voice? It's great, isn't it? We asked it through an agency and didn't know the voice actress name, unfortunately.