Thunder Cranes
Thunder Cranes
  • 6
  • 20 811
Flare Tip Replacement - Lifting Solutions
Our Thunder Solutions division provides specialized lifting equipment and crew to support a flare tip replacement operation.
See: www.thundercranes.com/flare-tip-replacement/
In the preparation stage, experienced professionals work closely with you to analyse your needs and develop a customized lifting solution that fits your project scope, ensuring optimal performance and results.
During the execution stage, a team of lifting experts support complete flare tip changeout operations both offshore and onshore with the innovative flare tip handling system - the TC MLS (modular lifting system).
The TC-MLS modular lifting system is constructed with lightweight and high-grade aluminium, and can handle loads up to 5MT. Operated by winches from the main deck level, the TC-MLS can be initially set up by manual handling on flare tip platforms without any vessel crane or helicopter assistance and it can reach where conventional cranes have difficulty accessing.
Prior to project execution, our teams will devise lift plans and develop a method statement, structural calculation report as well as a 3D model of the step-by-step execution. During execution the flare tip may be brought back to the main deck of the asset, or alternatively, directly lifted to a supply vessel.
TC-MLS is a modular A-Frame construction and can be used on most type of flare structures.
- It can be deployed both onshore and offshore.
- It can be deployed on platforms and FPSO.
- It is a self-lifting system and there is no need for additional cranes or helicopters.
Переглядів: 1 586

Відео

Load Testing for Offshore Modular Cranes
Переглядів 147Рік тому
Check out this 'behind the scenes' at a recent load test of a Thunder Crane TC20 offshore. A load test is a type of test that proves the fitness of a crane. It involves the application of a static, dynamic, or functional load for a period of time. It is conducted after completing the visual crane inspection. A load test is usually expressed as a percentage of the working load limit or safe work...
What can we do for you? #Offshore #LiftingSolutions
Переглядів 8 тис.4 роки тому
Whether in support of well-services, facility engineering, helideck skidding or platform decommissioning, the performance of our highly experienced personnel, together with our unique self-lifting cranes present an opportunity for clients to optimise uptime and minimise operating costs without compromising safety. www.thundercranes.com
Large Carrier Support: Lifting solutions on Tankers, FPSO, Bulk Carriers.
Переглядів 2134 роки тому
Maintenance, repairs and non-routine project work on tankers/VLCC's, bulk carriers and FPSO Vessels may, from time-to-time, require a range of lifting and skidding services, including portable-modular rental cranes. Much of a vessel's deck area will be out of the reach of the vessel's own deck cranes and lifting devices. On FPSO for example, up to 70% of the deck area may be outside the reach r...
Thunder Cranes - Offshore Lifting Solutions
Переглядів 10 тис.4 роки тому
Thunder Cranes is a specialised offshore lifting solutions provider with Asia-Pacific's largest fleet of portable, modular rental cranes for use on offshore platforms and vessel. Our rental cranes come with self-lifting capabilities and a dynamic lifting capacity ranging from 2 to 60 tons. They are designed to be versatile and adaptable, with a number of tie-down scenarios, on-deck placement co...
Thunder Cranes - Helideck Skidding
Переглядів 7855 років тому
Thunder Cranes was responsible for skidding a 120MT helideck structure backwards by 7 metres in order to clear sufficient space to accommodate drilling rig activities at this Malaysian platform.

КОМЕНТАРІ