- 8
- 7 112
Bridge & Road Construction
Приєднався 8 тра 2020
This Channel is to represent how to construct Bridge & Road or Highway in Bangladesh
#Bridge #Road #Construction #Highway #Bridge_Construction #Road_Construction
#Bridge #Road #Construction #Highway #Bridge_Construction #Road_Construction
Prime Coat ‖ Bituminous Prime Spray ‖ Bridge & Road Construction
This work shall consist of supplying and applying bituminous material to a previously prepared surface in preparation for the laying of bituminous courses. Prime coat shall be used where the surface to be coated is a non-bituminous e.g. aggregate Base Course Type I.
The prime coat shall be cut back asphalt of medium curing type MC30 or MC70 grade, conforming to the requirements of AASHTO M82. This may be prepared by cutting back 80/100 penetration grade bitumen with kerosene or any other approved cutter in the ratio of 100 parts by volume of bitumen to 40 to 60 parts by volume of cutter.
Preparation: Before spraying is commenced, the surface shall be free of all loose materials. The surface as a whole shall be generally clean, free of contamination and free of standing water
Weather Limitations:
Prime coat shall be applied only on the following conditions:
a) Surface is dry or slightly damp; and
b) Weather is not foggy or rainy.
Spreading Rate:
The rate of application of prime coat will be dependent on the texture of the aggregate surface and the quantity sprayed should be such that the surface is dry within 48 hours leaving no free pools of bitumen on the surface. The prime coat application rate shall normally be in the range 1.0 to 2.5 litres/sq.m (residual bitumen). The depth of penetration shall be 3 mm or more.
Curing:
Surfaces primed with asphalt for at least 24 hours before covering with the next course.
Maintenance:
The primed surface shall be maintained by keeping it free of corrugations, potholing, and loose material until the next course is placed. Remove dirt or other deleterious material and repair damaged areas.
Spread additional blotter to cover unabsorbed asphalt. Remove excess blotter after the asphalt is absorbed.
#primecoat #bitumenemulsion #primecoatdetails #tackcoat #mc1 #tarboiler #mc1onroad #roadconstruction #bitumenonroad
Please share the Video & Subscribe to our Channel.
Watch other Videos of the Channel:
Precast Girder Lifting & Placing by Crane:
ua-cam.com/video/aAlOHFTNQjo/v-deo.html
Sheet Pile Installation:
ua-cam.com/video/TWfREMcIA3E/v-deo.html
The prime coat shall be cut back asphalt of medium curing type MC30 or MC70 grade, conforming to the requirements of AASHTO M82. This may be prepared by cutting back 80/100 penetration grade bitumen with kerosene or any other approved cutter in the ratio of 100 parts by volume of bitumen to 40 to 60 parts by volume of cutter.
Preparation: Before spraying is commenced, the surface shall be free of all loose materials. The surface as a whole shall be generally clean, free of contamination and free of standing water
Weather Limitations:
Prime coat shall be applied only on the following conditions:
a) Surface is dry or slightly damp; and
b) Weather is not foggy or rainy.
Spreading Rate:
The rate of application of prime coat will be dependent on the texture of the aggregate surface and the quantity sprayed should be such that the surface is dry within 48 hours leaving no free pools of bitumen on the surface. The prime coat application rate shall normally be in the range 1.0 to 2.5 litres/sq.m (residual bitumen). The depth of penetration shall be 3 mm or more.
Curing:
Surfaces primed with asphalt for at least 24 hours before covering with the next course.
Maintenance:
The primed surface shall be maintained by keeping it free of corrugations, potholing, and loose material until the next course is placed. Remove dirt or other deleterious material and repair damaged areas.
Spread additional blotter to cover unabsorbed asphalt. Remove excess blotter after the asphalt is absorbed.
#primecoat #bitumenemulsion #primecoatdetails #tackcoat #mc1 #tarboiler #mc1onroad #roadconstruction #bitumenonroad
Please share the Video & Subscribe to our Channel.
Watch other Videos of the Channel:
Precast Girder Lifting & Placing by Crane:
ua-cam.com/video/aAlOHFTNQjo/v-deo.html
Sheet Pile Installation:
ua-cam.com/video/TWfREMcIA3E/v-deo.html
Переглядів: 216
Відео
Girder Shifting By Hydraulic Jack
Переглядів 2,6 тис.3 роки тому
Launching Girder is also known as Launching Gantry. ... A launching girder usually consists of main trusses (“girders”) and lifting devices that would move horizontally along the trusses while suspending/lifting the precast beam, bridge segments, and/or working platforms for assembling. One of the greatest safety risks during bridge construction is an unsecured girder toppling over, and worst s...
Precast Girder Lifting & Placing by Crane││Girder Launching││Girder Erection││
Переглядів 4174 роки тому
A girder is a support beam used in construction. It is the main horizontal support of a structure which supports smaller beams. Girders often have an I-beam cross section composed of two load-bearing flanges separated by a stabilizing web, but may also have a box shape, Z shape, or other forms. Precast Girder is cast in before & then launch in its original position to the structure.Girder Launc...
Soundness test procedure of Pile ।। পাইলের দৈর্ঘ্য পরিমাপ ।।
Переглядів 6934 роки тому
In this video, we will show how to measure the pile sounding or pile length in Bangladesh during Pile Boring. Pile soundness test is a very easy procedure. At first pile, boring is done and for confirming the pile length, a rope is down towards the pile boring and goes to the tip of the boring and after that measure the length of the rope. By this wy pile soundness test is done in Bangladesh. V...
Sheet Pile Installation ।। Sheet Pile Driving with Vibro Hammer ।।
Переглядів 2,4 тис.4 роки тому
This video shows the installation procedure of Sheet Pile using Vibro Hammer. Sheet pile is a kind of pile which has to be inserted into the ground so that it can hold the structure. Sheet piles are mainly used to retain soil. Sheet piles are used to retain the ground beneath all structures that are water related. So it is very important. In a word, sheet pile is at the root of all water relate...
Rebar Cage Installation for Cast In situ Pile ।। Pile Steel Cage Installation।।
Переглядів 1734 роки тому
This video shows rebar cage installation process for Cast In situ pile. #RebarInstallation #Rebarcage #Castinsitupile
Pile Boring by Winch Machine ।। Manual Drilling for Pile ।।
Переглядів 4194 роки тому
This video shows drilling process of Pile by winch machine. #Pileboring #Winchmachine #Piledrilling
Sub Soil Investigation।। Soil Test Procedure।।
Переглядів 1754 роки тому
This Video represent how to Sub soil Investigate by using SPT method in Bangladesh #Sub_Soil_Investigation #SPT_method #Soil_Test
like
Vaia shifting e j sotorkota gula obolombon kora lagbe segula likhe dile ba bolle aktu valo hoito
Thanks for the suggestion
Giders lifting
ua-cam.com/video/jyKv1Zbmd2Q/v-deo.html
My previous project...
good work
informative
nice
nice video #fshomemaker
nice
nice.carry on
Useful video
This video is for educational purpose
This is my First UA-cam Video. Please subscribe for Inspiring me & go forward