Power System Engineering Solution (PSES)
Power System Engineering Solution (PSES)
  • 130
  • 199 039

Відео

P546/P543 Distance Blocking scheme check
Переглядів 7114 днів тому
P546/P543 Distance Blocking scheme check
CT Secondary injection test in Freja300
Переглядів 29614 днів тому
CT Secondary injection test in Freja300
P546/P543 Current Reverse Protection DEF
Переглядів 10214 днів тому
P546/P543 Current Reverse Protection DEF
P546/P543 DEF/Aided DEF POR and Blocking scheme check
Переглядів 13514 днів тому
P546/P543 DEF/Aided DEF POR and Blocking scheme check
Micom S1 Agile software installation in PC
Переглядів 7314 днів тому
Micom S1 Agile software installation in PC
P546/P543 SOTF Externalplus Function test # Freja300
Переглядів 14521 день тому
P546/P543 SOTF Externalplus Function test # Freja300
P546/P543 SOTF Pole Dead Function test #Freja300
Переглядів 12821 день тому
P546/P543 SOTF Pole Dead Function test #Freja300
RTKUC625 Annunciator LED input contact settings changed
Переглядів 37Місяць тому
RTKUC625 Annunciator LED input contact settings changed
ISA CBA1000 CB timing test 380kV GIS @ABB
Переглядів 1222 місяці тому
ISA CBA1000 CB timing test 380kV GIS @ABB
ISA CBA1000 communication with PC and CB contact resistance test
Переглядів 892 місяці тому
ISA CBA1000 communication with PC and CB contact resistance test
Circuit breaker test @ABB HD4 13.8kv switchgear
Переглядів 1502 місяці тому
Circuit breaker test @ABB HD4 13.8kv switchgear
Busbar stability test @ABB 380kv_GIS by primary injection
Переглядів 2982 місяці тому
Busbar stability test @ABB 380kv_GIS by primary injection
REG-D AVR tap changer relay function check
Переглядів 1392 місяці тому
REG-D AVR tap changer relay function check
7UT633 relay communicate with PC #Siemens
Переглядів 1042 місяці тому
7UT633 relay communicate with PC #Siemens
7UT633 transformer protection relay by HMI setting review
Переглядів 1037 місяців тому
7UT633 transformer protection relay by HMI setting review
7UT632 Transformer differential relay Power supply issues repair #Siemens
Переглядів 2277 місяців тому
7UT632 Transformer differential relay Power supply issues repair #Siemens
MVAJ104 Trip relay testing procedure
Переглядів 1577 місяців тому
MVAJ104 Trip relay testing procedure
MRTP Pilot wire supervision relay #AREVA
Переглядів 797 місяців тому
MRTP Pilot wire supervision relay #AREVA
7SJ64 Siemens relay setting review
Переглядів 1007 місяців тому
7SJ64 Siemens relay setting review
REJ525B relay manual configuration
Переглядів 1407 місяців тому
REJ525B relay manual configuration
MGTR GPS connected with Freja 300 #Megger
Переглядів 1127 місяців тому
MGTR GPS connected with Freja 300 #Megger
Mimic panel for power distribution system
Переглядів 667 місяців тому
Mimic panel for power distribution system
MDB and EMDB panel
Переглядів 1957 місяців тому
MDB and EMDB panel
Control Cable tray installation work
Переглядів 467 місяців тому
Control Cable tray installation work
RED670 relay to Media converter communication failure indication
Переглядів 817 місяців тому
RED670 relay to Media converter communication failure indication
Protection panel installation view
Переглядів 1288 місяців тому
Protection panel installation view
BCU relay installation in LCC panel@ ABB
Переглядів 1408 місяців тому
BCU relay installation in LCC panel@ ABB
GIS 110kV Overviews
Переглядів 2498 місяців тому
GIS 110kV Overviews
RMU compact substation @ABB
Переглядів 948 місяців тому
RMU compact substation @ABB

КОМЕНТАРІ

  • @sabeerahmed1047
    @sabeerahmed1047 2 дні тому

    Pls upload full video of communication between freeja 300 and laptop

  • @ishakmohammed9827
    @ishakmohammed9827 10 днів тому

    GOOD VIDEO SIR, can pls provide the copy of test report shown in the video.

  • @amirbashir2122
    @amirbashir2122 15 днів тому

    Thanks for uploading informative videos .this type of videos help many people.good work .

  • @manishpal5298
    @manishpal5298 16 днів тому

    Hi sir please send relay file

  • @amirbashir2122
    @amirbashir2122 17 днів тому

    Very. Usefull video upload more videos.

  • @daleshwarpatel4789
    @daleshwarpatel4789 26 днів тому

    Kindly explain what is I>>>, I>>, I> and Ip> and full form in Siemens siprotec relays

  • @aravindammu6528
    @aravindammu6528 26 днів тому

    Sir i need testing procedures for p543 and red670 , p343 generator protection with settings guidance , protection fundamental concept or philosophy. Pls provide sir

  • @amirbashir2122
    @amirbashir2122 26 днів тому

    Thanks for uploading video very informative and helpful video make some more videos to help others

  • @RaviKumar-wr5ne
    @RaviKumar-wr5ne 28 днів тому

    What is the reason for this green power indicator flashing continuously

  • @amirbashir2122
    @amirbashir2122 Місяць тому

    Very informative

  • @风景这边独好-g4k
    @风景这边独好-g4k Місяць тому

    Excuse me, what is the resistance of the opening triangle

  • @ahmedsalim1756
    @ahmedsalim1756 Місяць тому

    which company the CT analyzer? Omicron?

  • @bhaktivideos9848
    @bhaktivideos9848 Місяць тому

    COULD YOU PLEASE SHARE DOCUMENTS FOR SETTING

  • @NeilMousseau
    @NeilMousseau 2 місяці тому

    523 O'Hara Cliff

  • @thahamashood.v.p4119
    @thahamashood.v.p4119 2 місяці тому

    👍

  • @amirbashir2122
    @amirbashir2122 2 місяці тому

    Great

  • @amirbashir2122
    @amirbashir2122 2 місяці тому

    Boss you are great very informative make more videos plz

  • @oldgold4u3971
    @oldgold4u3971 2 місяці тому

    I started my career with ASEA, later ASEA Brown Boveri (ABB) at 18 yo in 1984 at Lilydale Victoria Australia. Around 7 years later, I joined the Service Dept and travelled most of Australia doing installation and service work. This was the best company I have worked for and the best experience I ever had. I only left because they moved their operations too far away. Great memories.

  • @风景这边独好-g4k
    @风景这边独好-g4k 2 місяці тому

    Hello, I'm very sorry to disturb you on the weekend. I have a question that has been bothering me: after changing the settings of the protection relay, do I still need to conduct a test? For example, the overcurrent protection has been changed from 5A to 6A. Do you still need to test the relay protection? Thank you.

    • @Powersystemengineeringsolution
      @Powersystemengineeringsolution 2 місяці тому

      Yes, when you change any settings, current or time, make sure relay works according or not

    • @Powersystemengineeringsolution
      @Powersystemengineeringsolution 2 місяці тому

      If recently tested, this relay is working fine then no need to test

    • @风景这边独好-g4k
      @风景这边独好-g4k 2 місяці тому

      @@Powersystemengineeringsolution Yes, the protection relay has been running normally, but due to load changes, the parameters of the overcurrent protection need to be modified. So the question is: How to ensure that the modified parameters are entered correctly?

  • @SathishKumar-qv4rj
    @SathishKumar-qv4rj 2 місяці тому

    Hi.. provide ur contact details

  • @amirbashir2122
    @amirbashir2122 2 місяці тому

    Thank you sir for increasing our information .

  • @amirbashir2122
    @amirbashir2122 2 місяці тому

    Thank you Soo much very informative video .keep make more videos upload .

  • @hamdymahmoud97
    @hamdymahmoud97 2 місяці тому

    Thank you for good explain

  • @muhammadezzat2853
    @muhammadezzat2853 2 місяці тому

    I have a problem regarding power measurements the relay reads all currents and voltage correctly but power gives values that not match with injection

    • @Powersystemengineeringsolution
      @Powersystemengineeringsolution 2 місяці тому

      Check relay setting current and voltage and frequency and wiring connections, injection source measurements

  • @kasmcesur6535
    @kasmcesur6535 3 місяці тому

    Hello, what is the Zs? How we find 1.5 and 1. Can anyone explain?

  • @sainandhun8661
    @sainandhun8661 3 місяці тому

    How you made connection in changeover contact (15,16)

  • @ledinhtungfpldn1413
    @ledinhtungfpldn1413 3 місяці тому

    Can I have the download link, please?

  • @marciomonteiro9677
    @marciomonteiro9677 4 місяці тому

    Can you connect two currents in parallel with different frequencies? I don't understand.

    • @Powersystemengineeringsolution
      @Powersystemengineeringsolution 3 місяці тому

      You can impose R phase into the Y phase current with different frequency, but phase angle should be same

  • @shahidali794
    @shahidali794 4 місяці тому

    Can someone take training at your workshop

  • @shahidali794
    @shahidali794 4 місяці тому

    Hello Sir where are you based ?

  • @rolando.caubaneta3
    @rolando.caubaneta3 5 місяців тому

    secondary of your VT is going input for your CPC 100 not voltage source , for clarification appreciated your demo as most of my testing is not allowed camera phones that's good demo anyways

  • @shahulhameedbathusha
    @shahulhameedbathusha 5 місяців тому

    Hi, Can u pls share the PSD graph creator or that psd graph file.

  • @mossalam3431
    @mossalam3431 5 місяців тому

    Very good Sir

  • @anishkumar5276
    @anishkumar5276 5 місяців тому

    Why we are taking 1amp and 2kv...on what factor is depend? Suppose my Ct is 3200/5 rating..then how much should i take voltage and current?

  • @karnan149
    @karnan149 6 місяців тому

    How can we measure the winding resistance of VT

  • @SaikatJana-b8n
    @SaikatJana-b8n 6 місяців тому

    Very Good Video Sir.

  • @hanial-shadadi9122
    @hanial-shadadi9122 6 місяців тому

    Is it on the secondary? How come

  • @thesinghraja1505
    @thesinghraja1505 7 місяців тому

    👍👌 good explanation

  • @aravindammu6528
    @aravindammu6528 7 місяців тому

    Pls upload more video about Siemens relay sir

  • @aravindammu6528
    @aravindammu6528 7 місяців тому

    What is make of relay kit

  • @ramajayam
    @ramajayam 8 місяців тому

    Good job brother, how you are accessing CT primary in this GIS?

    • @Powersystemengineeringsolution
      @Powersystemengineeringsolution 7 місяців тому

      Thank you

    • @kooriselvam6429
      @kooriselvam6429 7 місяців тому

      In ABB GIS if you close the earth switch GIS primary make short circuit body with the help of one plate out side of the earth switch so you can access the primary by open the this plate and connect your cable

  • @NewlineElectricalDrive
    @NewlineElectricalDrive 8 місяців тому

    its LV system i guess

  • @mohamedfathaq1497
    @mohamedfathaq1497 8 місяців тому

    Now I am working junior testing engineer could you please share about mail id

  • @NizarNinano
    @NizarNinano 9 місяців тому

    Sir plz could you send me excel sheet. Thanks

  • @hongnguyen-tb4zi
    @hongnguyen-tb4zi 10 місяців тому

    Sir, can you give me the contact resistance standards of medium voltage circuit breakers?

  • @manikrishnan3788
    @manikrishnan3788 10 місяців тому

    Bro post videos in tamil if possible it will be easy to understand.

  • @HariKumar-om6ek
    @HariKumar-om6ek 11 місяців тому

    Good Explanation, but take care using safety hand gloves, one more thing during test CT secondary wire possible to remove while clamp meter insertion, it's dangerous sir

  • @govindarajn787
    @govindarajn787 11 місяців тому

    Hi u r slang smilier to tamil