Road Dog Drone
Road Dog Drone
  • 33
  • 7 319
welcome break sheffield junction 33 november update
Huge progress since last visit, the site is very busy to be ready for early 2025 opening. The dual plug applegreen chargers are going in ( Power Electronics Slim) , as are the pedestals for the tesla units.
Переглядів: 105

Відео

peak district: curbar edge
Переглядів 12День тому
some nice shots of the trail along Curbar Edge, taken after some snowfall
peak district: chapel milton viaduct, peak forest tramway trail
Переглядів 10День тому
some nice autumn shots of the double viaduct at chapel milton, taken after snowfall
test film - chesterfield in the snow
Переглядів 11День тому
not an 'official' film, was just bored and I wanted to test in slightly adverse conditions.
stevenage gridserve is live
Переглядів 27421 день тому
the impressive new gridserve EV charging hub has opened officially w3w: ///young.torn.scope
ionity doncaster is live
Переглядів 5621 день тому
a very useful site at the Holiday Inn Doncaster, junction 36 of the A1(M). Six high power rapids with room for expansion. w3w: ///fuse.field.mass
instavolt winchester update #2
Переглядів 12421 день тому
some good progress at the Winchester site - visible now are the pedestals and main building as well as various groundworks and security fencing. Will eventually become the UKs largest charging hub by a single operator with x44 rapid CCS charging bays.
Sheffield Be.EV Parkway site is LIVE
Переглядів 78Місяць тому
A slightly interesting charging site has opened in Sheffield, on the city approach of the A57. While its not architecturally significant the layout and design is interesting for other operators trying to repurpose parking bays for EV charging in a fairly busy and cramped retail park. Its also located on a busy route and includes wide bays for disabled or long wheel base vehicles. There are now ...
instavolt barnsdale bar update #2
Переглядів 512 місяці тому
A key site on the A1 between Pontefract and Doncaster, on this occasion not much progress since last visit in July. You can see the new tarmac for the offramp and perhaps some work on the new building units but nothing to see regarding chargers or the derelict hotel at the back which id expect to be demolished at some stage.
welcome break sheffield, M1 Junction 33
Переглядів 1,1 тис.2 місяці тому
A new site for us, Welcome Break are building a brand new service area at the Rotherham roundabout at Junction 33 of the M1. As Applegreen are the owners of WB and the planning documents show a couple of rows of rapid chargers we are pretty sure AG will use the chargers seen at their other service areas. This is fairly well into build at this stage, the main structures are all done and some roa...
Gridserve Markham Vale Update #3
Переглядів 752 місяці тому
Not much progress visible since last update. Some groundworks are in progress and the main road pavement is being upgraded for pedestrians.
album release
Переглядів 292 місяці тому
a daft promo film for the album, which you can stream or download by searching road dog music bandcamp. more music to come as the series continues! thanks and enjoy roaddogmusic.bandcamp.com
Sheffield Be.Ev Parkway Update #2
Переглядів 1622 місяці тому
Decent progress on the A57 site heading into the city centre off Cricket Inn Road. The area around the substation has proper protecting bollards, and many of the Kempower units are installed and being connected up.
A new home for the worlds oldest football club
Переглядів 3,5 тис.2 місяці тому
Sheffield FC currently play in Dronfield just south of Sheffield, but recent submitted planning documents show a huge new complex at Meadowhead
gridserve stevenage - august bank holiday update
Переглядів 1953 місяці тому
One of the more anticipated UK sites is the Stevenage Gridserve site on the A1M, and theres been lots of progress since we last visited in June! All the solar panels are in, all x12 charging units look installed (these are double headers so x24 connectors) and the main building is looking fantastic.Lots of groundwork to finish but looks really not far from being complete. Also noteworthy is tha...
peak district: monsal trail viaduct
Переглядів 283 місяці тому
peak district: monsal trail viaduct
instavolt winchester update #1
Переглядів 1053 місяці тому
instavolt winchester update #1
peak district: bamford edge
Переглядів 383 місяці тому
peak district: bamford edge
Be.Ev Sheffield Parkway update #1
Переглядів 664 місяці тому
Be.Ev Sheffield Parkway update #1
peak district: stanage edge trail
Переглядів 834 місяці тому
peak district: stanage edge trail
instavolt barnsdale bar update #1
Переглядів 684 місяці тому
instavolt barnsdale bar update #1
gridserve markham vale update #2
Переглядів 824 місяці тому
gridserve markham vale update #2
ionity south normanton update #1 8-7-24
Переглядів 384 місяці тому
ionity south normanton update #1 8-7-24
ionity doncaster update #1 8-7-24
Переглядів 1124 місяці тому
ionity doncaster update #1 8-7-24
instavolt winchester hub 12-6-24
Переглядів 1285 місяців тому
instavolt winchester hub 12-6-24
gridserve stevenage 12-6-24
Переглядів 2155 місяців тому
gridserve stevenage 12-6-24
Be.Ev Sheffield Parkway Hub 10-6-24
Переглядів 705 місяців тому
Be.Ev Sheffield Parkway Hub 10-6-24
ionity south normanton 2-6-24
Переглядів 1465 місяців тому
ionity south normanton 2-6-24
gridserve markham vale update #1 2-6-24
Переглядів 915 місяців тому
gridserve markham vale update #1 2-6-24
Be.EV Oasis Hub, Oldham Road Manchester
Переглядів 406 місяців тому
Be.EV Oasis Hub, Oldham Road Manchester